blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3141198

EP3141198 - SURGICAL SLIDING SHAFT INSTRUMENT AND SLIDING SHAFT [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  23.04.2021
Database last updated on 05.08.2024
FormerThe patent has been granted
Status updated on  15.05.2020
FormerGrant of patent is intended
Status updated on  19.01.2020
FormerRequest for examination was made
Status updated on  22.09.2017
FormerThe application has been published
Status updated on  10.02.2017
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024  [2024/29]
Applicant(s)For all designated states
Aesculap AG
Am Aesculap-Platz
78532 Tuttlingen / DE
[2020/25]
Former [2017/11]For all designated states
Aesculap AG
Am Aesculap-Platz
78532 Tuttlingen / DE
Inventor(s)01 / FAULHABER, Konstantin
Schulstrasse 10
78665 Frittlingen / DE
02 / WEIßHAUPT, Dieter
Bachzimmerer Ösch 10
78194 Immendingen / DE
 [2017/11]
Representative(s)Hoeger, Stellrecht & Partner Patentanwälte mbB
Uhlandstrasse 14c
70182 Stuttgart / DE
[2017/11]
Application number, filing date16171884.629.01.2010
[2017/11]
Priority number, dateDE2009100869106.02.2009         Original published format: DE102009008691
[2017/11]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3141198
Date:15.03.2017
Language:DE
[2017/11]
Type: B1 Patent specification 
No.:EP3141198
Date:17.06.2020
Language:DE
[2020/25]
Search report(s)(Supplementary) European search report - dispatched on:EP13.02.2017
ClassificationIPC:A61B17/16
[2017/11]
CPC:
A61B17/1611 (EP)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   SE,   SI,   SK,   SM,   TR [2017/43]
Former [2017/11]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  SE,  SI,  SK,  SM,  TR 
TitleGerman:CHIRURGISCHES SCHIEBESCHAFTINSTRUMENT UND SCHIEBESCHAFT[2017/11]
English:SURGICAL SLIDING SHAFT INSTRUMENT AND SLIDING SHAFT[2017/11]
French:INSTRUMENT CHIRURGICAL A TIGE DE POUSSEE ET TIGE DE POUSSEE[2017/11]
Examination procedure30.05.2016Date on which the examining division has become responsible
13.09.2017Amendment by applicant (claims and/or description)
13.09.2017Examination requested  [2017/43]
20.01.2020Communication of intention to grant the patent
06.05.2020Fee for grant paid
06.05.2020Fee for publishing/printing paid
06.05.2020Receipt of the translation of the claim(s)
Parent application(s)   TooltipEP10152052.6  / EP2226021
Opposition(s)18.03.2021No opposition filed within time limit [2021/21]
Fees paidRenewal fee
30.05.2016Renewal fee patent year 03
30.05.2016Renewal fee patent year 04
30.05.2016Renewal fee patent year 05
30.05.2016Renewal fee patent year 06
30.05.2016Renewal fee patent year 07
30.01.2017Renewal fee patent year 08
30.01.2018Renewal fee patent year 09
30.01.2019Renewal fee patent year 10
23.01.2020Renewal fee patent year 11
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU29.01.2010
CY17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
MK17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
TR17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
AT29.01.2021
IE29.01.2021
LU29.01.2021
BE31.01.2021
CH31.01.2021
FR31.01.2021
LI31.01.2021
[2024/29]
Former [2024/22]HU29.01.2010
CY17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
MK17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
AT29.01.2021
IE29.01.2021
LU29.01.2021
BE31.01.2021
CH31.01.2021
FR31.01.2021
LI31.01.2021
Former [2023/27]HU29.01.2010
CY17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
AT29.01.2021
IE29.01.2021
LU29.01.2021
BE31.01.2021
CH31.01.2021
FR31.01.2021
LI31.01.2021
Former [2023/24]CY17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
AT29.01.2021
IE29.01.2021
LU29.01.2021
BE31.01.2021
CH31.01.2021
FR31.01.2021
LI31.01.2021
Former [2022/33]CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
AT29.01.2021
IE29.01.2021
LU29.01.2021
BE31.01.2021
CH31.01.2021
FR31.01.2021
LI31.01.2021
Former [2022/21]CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
AT29.01.2021
IE29.01.2021
LU29.01.2021
CH31.01.2021
FR31.01.2021
LI31.01.2021
Former [2022/07]CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
IE29.01.2021
LU29.01.2021
CH31.01.2021
FR31.01.2021
LI31.01.2021
Former [2021/52]CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
LU29.01.2021
CH31.01.2021
FR31.01.2021
LI31.01.2021
Former [2021/48]CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
LU29.01.2021
FR31.01.2021
Former [2021/43]CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
LU29.01.2021
Former [2021/40]CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
Former [2021/24]CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
Former [2021/21]CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
SE17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
Former [2021/10]CZ17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
SE17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
Former [2021/09]CZ17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
NL17.06.2020
RO17.06.2020
SE17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
PT19.10.2020
Former [2021/04]FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
NL17.06.2020
SE17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
Former [2021/01]FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
SE17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
Former [2020/50]FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
SE17.06.2020
NO17.09.2020
GR18.09.2020
Former [2020/48]FI17.06.2020
LT17.06.2020
SE17.06.2020
NO17.09.2020
Former [2020/47]LT17.06.2020
NO17.09.2020
Documents cited:Search[XI]DE202004015643U  (AESCULAP AG & CO KG [DE]) [X] 1-6,8,11-14 * paragraphs [0075] - [0082]; figures 1-3 * [I] 9,10;
 [XI]WO9505123  (KARLIN TECHNOLOGY INC [US]) [X] 1-3,5-8,12-15 * page 15, lines 11-19, 29-35 * * page 12, lines 10-26; figure - * [I] 9
by applicantDE202004015643U
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.