EP3252997 - AN IOT-ENABLED DEVICE [Right-click to bookmark this link] | |||
Former [2017/49] | AN IOT-ENABLED DEVICE AND A METHOD FOR PROVIDING INTERNET CONNECTIVITY TO A DEVICE | ||
[2019/52] | Status | No opposition filed within time limit Status updated on 12.02.2021 Database last updated on 02.08.2024 | |
Former | The patent has been granted Status updated on 28.02.2020 | ||
Former | Grant of patent is intended Status updated on 09.12.2019 | ||
Former | Examination is in progress Status updated on 27.02.2019 | ||
Former | Request for examination was made Status updated on 08.06.2018 | ||
Former | The application has been published Status updated on 03.11.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Advanced Digital Broadcast S.A. Route de Lausanne 319 1293 Bellevue / CH | [2020/09] |
Former [2017/49] | For all designated states Advanced Digital Broadcast S.A. Avenue de Tournay 7 1292 Chambesy / CH | Inventor(s) | 01 /
Robba, Mauro ADB Viale Sarca, 222 20126 Milano / IT | 02 /
Storto, Marco ADB Viale Sarca, 222 20126 Milano / IT | [2017/49] | Representative(s) | Blonski, Pawel EP-Patent Konstruktorow 30/2 65-119 Zielona Gora / PL | [2020/14] |
Former [2017/49] | Kancelaria Eupatent.pl Sp. z.o.o Ul. Kilinskiego 185 90-348 Lodz / PL | Application number, filing date | 16172252.5 | 31.05.2016 | [2017/49] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3252997 | Date: | 06.12.2017 | Language: | EN | [2017/49] | Type: | B1 Patent specification | No.: | EP3252997 | Date: | 01.04.2020 | Language: | EN | [2020/14] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 25.11.2016 | Classification | IPC: | H04L12/28, H04L29/08, H04W4/70 | [2019/52] | CPC: |
H04L12/2818 (EP,US);
G06F21/31 (US);
G06F21/445 (US);
H04L12/2825 (EP,US);
H04L63/0876 (US);
H04L67/12 (EP,US);
H04L9/08 (US);
H04W4/70 (EP,US);
H04L12/2836 (EP,US);
H04L2012/2841 (EP,US)
(-)
|
Former IPC [2017/49] | H04L12/28, H04L29/08 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/28] |
Former [2017/49] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | IOT-FÄHIGE VORRICHTUNG | [2019/52] | English: | AN IOT-ENABLED DEVICE | [2019/52] | French: | DISPOSITIF IOT-ACTIVÉ | [2019/52] |
Former [2017/49] | IOT-FÄHIGE VORRICHTUNG UND VERFAHREN ZUR BEREITSTELLUNG VON INTERNETKONNEKTIVITÄT ZU EINER VORRICHTUNG | ||
Former [2017/49] | AN IOT-ENABLED DEVICE AND A METHOD FOR PROVIDING INTERNET CONNECTIVITY TO A DEVICE | ||
Former [2017/49] | DISPOSITIF IOT-ACTIVÉ ET PROCÉDÉ PERMETTANT DE FOURNIR UNE CONNECTIVITÉ INTERNET À UN DISPOSITIF | Examination procedure | 31.05.2016 | Date on which the examining division has become responsible | 30.05.2018 | Examination requested [2018/28] | 06.06.2018 | Amendment by applicant (claims and/or description) | 04.03.2019 | Despatch of a communication from the examining division (Time limit: M06) | 31.08.2019 | Reply to a communication from the examining division | 10.12.2019 | Communication of intention to grant the patent | 17.01.2020 | Receipt of the translation of the claim(s) | 25.02.2020 | Fee for grant paid | 25.02.2020 | Fee for publishing/printing paid | Opposition(s) | 12.01.2021 | No opposition filed within time limit [2021/11] | Fees paid | Renewal fee | 29.05.2018 | Renewal fee patent year 03 | 28.05.2019 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 31.05.2016 | AL | 01.04.2020 | AT | 01.04.2020 | CY | 01.04.2020 | CZ | 01.04.2020 | DK | 01.04.2020 | EE | 01.04.2020 | ES | 01.04.2020 | FI | 01.04.2020 | HR | 01.04.2020 | IT | 01.04.2020 | LT | 01.04.2020 | LV | 01.04.2020 | MC | 01.04.2020 | MK | 01.04.2020 | MT | 01.04.2020 | NL | 01.04.2020 | PL | 01.04.2020 | RO | 01.04.2020 | RS | 01.04.2020 | SE | 01.04.2020 | SI | 01.04.2020 | SK | 01.04.2020 | SM | 01.04.2020 | TR | 01.04.2020 | BE | 31.05.2020 | CH | 31.05.2020 | IE | 31.05.2020 | LI | 31.05.2020 | LU | 31.05.2020 | BG | 01.07.2020 | NO | 01.07.2020 | GR | 02.07.2020 | IS | 01.08.2020 | PT | 17.08.2020 | [2022/32] |
Former [2022/27] | HU | 31.05.2016 | |
AL | 01.04.2020 | ||
AT | 01.04.2020 | ||
CY | 01.04.2020 | ||
CZ | 01.04.2020 | ||
DK | 01.04.2020 | ||
EE | 01.04.2020 | ||
ES | 01.04.2020 | ||
FI | 01.04.2020 | ||
HR | 01.04.2020 | ||
IT | 01.04.2020 | ||
LT | 01.04.2020 | ||
LV | 01.04.2020 | ||
MC | 01.04.2020 | ||
MT | 01.04.2020 | ||
NL | 01.04.2020 | ||
PL | 01.04.2020 | ||
RO | 01.04.2020 | ||
RS | 01.04.2020 | ||
SE | 01.04.2020 | ||
SI | 01.04.2020 | ||
SK | 01.04.2020 | ||
SM | 01.04.2020 | ||
TR | 01.04.2020 | ||
BE | 31.05.2020 | ||
CH | 31.05.2020 | ||
IE | 31.05.2020 | ||
LI | 31.05.2020 | ||
LU | 31.05.2020 | ||
BG | 01.07.2020 | ||
NO | 01.07.2020 | ||
GR | 02.07.2020 | ||
IS | 01.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/24] | AL | 01.04.2020 | |
AT | 01.04.2020 | ||
CZ | 01.04.2020 | ||
DK | 01.04.2020 | ||
EE | 01.04.2020 | ||
ES | 01.04.2020 | ||
FI | 01.04.2020 | ||
HR | 01.04.2020 | ||
IT | 01.04.2020 | ||
LT | 01.04.2020 | ||
LV | 01.04.2020 | ||
MC | 01.04.2020 | ||
NL | 01.04.2020 | ||
PL | 01.04.2020 | ||
RO | 01.04.2020 | ||
RS | 01.04.2020 | ||
SE | 01.04.2020 | ||
SI | 01.04.2020 | ||
SK | 01.04.2020 | ||
SM | 01.04.2020 | ||
BE | 31.05.2020 | ||
CH | 31.05.2020 | ||
IE | 31.05.2020 | ||
LI | 31.05.2020 | ||
LU | 31.05.2020 | ||
BG | 01.07.2020 | ||
NO | 01.07.2020 | ||
GR | 02.07.2020 | ||
IS | 01.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/20] | AL | 01.04.2020 | |
AT | 01.04.2020 | ||
CZ | 01.04.2020 | ||
DK | 01.04.2020 | ||
EE | 01.04.2020 | ||
ES | 01.04.2020 | ||
FI | 01.04.2020 | ||
HR | 01.04.2020 | ||
IT | 01.04.2020 | ||
LT | 01.04.2020 | ||
LV | 01.04.2020 | ||
MC | 01.04.2020 | ||
NL | 01.04.2020 | ||
PL | 01.04.2020 | ||
RO | 01.04.2020 | ||
RS | 01.04.2020 | ||
SE | 01.04.2020 | ||
SK | 01.04.2020 | ||
SM | 01.04.2020 | ||
CH | 31.05.2020 | ||
IE | 31.05.2020 | ||
LI | 31.05.2020 | ||
LU | 31.05.2020 | ||
BG | 01.07.2020 | ||
NO | 01.07.2020 | ||
GR | 02.07.2020 | ||
IS | 01.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/15] | AL | 01.04.2020 | |
AT | 01.04.2020 | ||
CZ | 01.04.2020 | ||
DK | 01.04.2020 | ||
EE | 01.04.2020 | ||
ES | 01.04.2020 | ||
FI | 01.04.2020 | ||
HR | 01.04.2020 | ||
IT | 01.04.2020 | ||
LT | 01.04.2020 | ||
LV | 01.04.2020 | ||
MC | 01.04.2020 | ||
NL | 01.04.2020 | ||
PL | 01.04.2020 | ||
RO | 01.04.2020 | ||
RS | 01.04.2020 | ||
SE | 01.04.2020 | ||
SK | 01.04.2020 | ||
SM | 01.04.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
LU | 31.05.2020 | ||
BG | 01.07.2020 | ||
NO | 01.07.2020 | ||
GR | 02.07.2020 | ||
IS | 01.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/10] | AL | 01.04.2020 | |
AT | 01.04.2020 | ||
CZ | 01.04.2020 | ||
DK | 01.04.2020 | ||
EE | 01.04.2020 | ||
ES | 01.04.2020 | ||
FI | 01.04.2020 | ||
HR | 01.04.2020 | ||
IT | 01.04.2020 | ||
LT | 01.04.2020 | ||
LV | 01.04.2020 | ||
MC | 01.04.2020 | ||
NL | 01.04.2020 | ||
PL | 01.04.2020 | ||
RO | 01.04.2020 | ||
RS | 01.04.2020 | ||
SE | 01.04.2020 | ||
SK | 01.04.2020 | ||
SM | 01.04.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
BG | 01.07.2020 | ||
NO | 01.07.2020 | ||
GR | 02.07.2020 | ||
IS | 01.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/09] | AL | 01.04.2020 | |
AT | 01.04.2020 | ||
CZ | 01.04.2020 | ||
DK | 01.04.2020 | ||
EE | 01.04.2020 | ||
ES | 01.04.2020 | ||
FI | 01.04.2020 | ||
HR | 01.04.2020 | ||
IT | 01.04.2020 | ||
LT | 01.04.2020 | ||
LV | 01.04.2020 | ||
MC | 01.04.2020 | ||
NL | 01.04.2020 | ||
RO | 01.04.2020 | ||
RS | 01.04.2020 | ||
SE | 01.04.2020 | ||
SM | 01.04.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
BG | 01.07.2020 | ||
NO | 01.07.2020 | ||
GR | 02.07.2020 | ||
IS | 01.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/08] | AL | 01.04.2020 | |
CZ | 01.04.2020 | ||
DK | 01.04.2020 | ||
ES | 01.04.2020 | ||
FI | 01.04.2020 | ||
HR | 01.04.2020 | ||
LT | 01.04.2020 | ||
LV | 01.04.2020 | ||
NL | 01.04.2020 | ||
RO | 01.04.2020 | ||
RS | 01.04.2020 | ||
SE | 01.04.2020 | ||
SM | 01.04.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
BG | 01.07.2020 | ||
NO | 01.07.2020 | ||
GR | 02.07.2020 | ||
IS | 01.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/04] | AL | 01.04.2020 | |
CZ | 01.04.2020 | ||
FI | 01.04.2020 | ||
HR | 01.04.2020 | ||
LT | 01.04.2020 | ||
LV | 01.04.2020 | ||
NL | 01.04.2020 | ||
RS | 01.04.2020 | ||
SE | 01.04.2020 | ||
BG | 01.07.2020 | ||
NO | 01.07.2020 | ||
GR | 02.07.2020 | ||
IS | 01.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/51] | CZ | 01.04.2020 | |
FI | 01.04.2020 | ||
HR | 01.04.2020 | ||
LT | 01.04.2020 | ||
LV | 01.04.2020 | ||
NL | 01.04.2020 | ||
RS | 01.04.2020 | ||
SE | 01.04.2020 | ||
BG | 01.07.2020 | ||
NO | 01.07.2020 | ||
GR | 02.07.2020 | ||
IS | 01.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/50] | CZ | 01.04.2020 | |
FI | 01.04.2020 | ||
HR | 01.04.2020 | ||
LT | 01.04.2020 | ||
LV | 01.04.2020 | ||
NL | 01.04.2020 | ||
SE | 01.04.2020 | ||
BG | 01.07.2020 | ||
NO | 01.07.2020 | ||
GR | 02.07.2020 | ||
IS | 01.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/49] | CZ | 01.04.2020 | |
FI | 01.04.2020 | ||
LT | 01.04.2020 | ||
NL | 01.04.2020 | ||
SE | 01.04.2020 | ||
BG | 01.07.2020 | ||
NO | 01.07.2020 | ||
IS | 01.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/48] | FI | 01.04.2020 | |
LT | 01.04.2020 | ||
NL | 01.04.2020 | ||
SE | 01.04.2020 | ||
BG | 01.07.2020 | ||
NO | 01.07.2020 | ||
IS | 01.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/47] | LT | 01.04.2020 | |
BG | 01.07.2020 | ||
NO | 01.07.2020 | ||
IS | 01.08.2020 | ||
Former [2020/46] | BG | 01.07.2020 | |
IS | 01.08.2020 | ||
Former [2020/39] | BG | 01.07.2020 | Documents cited: | Search | [IY]WO03051677 (ELECTRONIC DATA SYST CORP [US]) [I] 1-6 * page 2, line 7 - line 24 * * page 7, line 1 - page 9, line 30 * * page 11, line 6 - page 12, line 30 * * figures 1, 2 * [Y] 7,8; | [YA]US2014126425 (BURD DANA [US], et al) [Y] 7,8 * paragraph [0051] - paragraph [0052] * * paragraph [0071] - paragraph [0088] * * paragraph [0096] - paragraph [0125] * * figure 2B * [A] 1-6; | [A]US2015244806 (RENAC PAUL [FR], et al) [A] 1-8 * abstract * * paragraph [0023] - paragraph [0065] * * paragraph [0154] - paragraph [0161] *; | [A] - KARL KOSCHER ET AL, "Experimental Security Analysis of a Modern Automobile", SECURITY AND PRIVACY (SP), 2010 IEEE SYMPOSIUM ON, IEEE, PISCATAWAY, NJ, USA, (20100516), ISBN 978-1-4244-6894-2, pages 447 - 462, XP031705100 [A] 1-8 * page 447, column r * * page 448, column r - page 449, column l * * page 450, column r * * figure 2 * | [A] - "ADVANCED METERING INFRASTRUCTURE ATTACK METHODOLOGY;AMI_Attack_Methodology", ETSI DRAFT; AMI_ATTACK_METHODOLOGY, EUROPEAN TELECOMMUNICATIONS STANDARDS INSTITUTE (ETSI), 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS ; FRANCE, (20131125), vol. SmartM2M, pages 1 - 58, XP014167294 [A] 1-8 * Sections 3.3, 4.2 * | Examination | WO2011099874 |