blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3115869

EP3115869 - CONFIGURABLE POWER DOMAIN AND METHOD [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  11.10.2019
Database last updated on 09.09.2024
FormerThe patent has been granted
Status updated on  02.11.2018
FormerGrant of patent is intended
Status updated on  09.10.2018
FormerRequest for examination was made
Status updated on  25.09.2018
FormerGrant of patent is intended
Status updated on  12.06.2018
FormerRequest for examination was made
Status updated on  14.07.2017
FormerThe application has been published
Status updated on  09.12.2016
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
NXP B.V.
High Tech Campus 60
5656 AG Eindhoven / NL
[2017/02]
Inventor(s)01 / KAPOOR, Ajay
NXP B.V.
Intellectual Property Group
High Tech Campus 60
5656 AG Eindhoven / NL
02 / BLUTMAN, Kristóf
NXP B.V.
Intellectual Property Group
High Tech Campus 60
5656 AG Eindhoven / NL
03 / PINEDA DE GYVEZ, Jose
NXP B.V.
Intellectual Property Group
High Tech Campus 60
5656 AG Eindhoven / NL
04 / VAN DER WEL, Arnoud
NXP B.V.
Intellectual Property Group
High Tech Campus 60
5656 AG Eindhoven / NL
 [2017/02]
Representative(s)Krott, Michel
NXP Semiconductors
Intellectual Property & Licensing
High Tech Campus 60
5656 AG Eindhoven / NL
[2017/02]
Application number, filing date16175281.120.06.2016
[2017/02]
Priority number, dateUS20151479448508.07.2015         Original published format: US201514794485
[2017/02]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3115869
Date:11.01.2017
Language:EN
[2017/02]
Type: B1 Patent specification 
No.:EP3115869
Date:05.12.2018
Language:EN
[2018/49]
Search report(s)(Supplementary) European search report - dispatched on:EP06.12.2016
ClassificationIPC:G06F1/32, H03K19/0185, // H03K19/0175, H03K19/00
[2018/26]
CPC:
H03K19/018507 (EP,US); H03K19/017509 (CN); G06F1/3203 (CN);
G06F1/3234 (EP,CN,US); H03K19/0019 (EP,US); H03K19/0175 (EP,US)
Former IPC [2017/02]G06F1/32, H03K19/0175, H03K19/00
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/33]
Former [2017/02]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:DOMÄNE MIT KONFIGURIERBARER LEISTUNG UND VERFAHREN[2017/02]
English:CONFIGURABLE POWER DOMAIN AND METHOD[2017/02]
French:DOMAINE DE PUISSANCE CONFIGURABLE ET PROCÉDÉ[2017/02]
Examination procedure20.06.2016Date on which the examining division has become responsible
23.03.2017Amendment by applicant (claims and/or description)
11.07.2017Examination requested  [2017/33]
13.06.2018Communication of intention to grant the patent
18.09.2018Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
10.10.2018Communication of intention to grant the patent
17.10.2018Fee for grant paid
17.10.2018Fee for publishing/printing paid
17.10.2018Receipt of the translation of the claim(s)
Opposition(s)06.09.2019No opposition filed within time limit [2019/46]
Fees paidRenewal fee
02.07.2018Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU20.06.2016
AL05.12.2018
AT05.12.2018
CY05.12.2018
CZ05.12.2018
DK05.12.2018
EE05.12.2018
ES05.12.2018
FI05.12.2018
HR05.12.2018
IT05.12.2018
LT05.12.2018
LV05.12.2018
MC05.12.2018
MK05.12.2018
MT05.12.2018
NL05.12.2018
PL05.12.2018
RO05.12.2018
RS05.12.2018
SE05.12.2018
SI05.12.2018
SK05.12.2018
SM05.12.2018
TR05.12.2018
BG05.03.2019
NO05.03.2019
GR06.03.2019
IS05.04.2019
PT05.04.2019
IE20.06.2019
LU20.06.2019
BE30.06.2019
CH30.06.2019
LI30.06.2019
[2022/32]
Former [2021/34]HU20.06.2016
AL05.12.2018
AT05.12.2018
CY05.12.2018
CZ05.12.2018
DK05.12.2018
EE05.12.2018
ES05.12.2018
FI05.12.2018
HR05.12.2018
IT05.12.2018
LT05.12.2018
LV05.12.2018
MC05.12.2018
MT05.12.2018
NL05.12.2018
PL05.12.2018
RO05.12.2018
RS05.12.2018
SE05.12.2018
SI05.12.2018
SK05.12.2018
SM05.12.2018
TR05.12.2018
BG05.03.2019
NO05.03.2019
GR06.03.2019
IS05.04.2019
PT05.04.2019
IE20.06.2019
LU20.06.2019
BE30.06.2019
CH30.06.2019
LI30.06.2019
Former [2021/33]HU20.06.2016
AL05.12.2018
AT05.12.2018
CY05.12.2018
CZ05.12.2018
DK05.12.2018
EE05.12.2018
ES05.12.2018
FI05.12.2018
HR05.12.2018
IT05.12.2018
LT05.12.2018
LV05.12.2018
MC05.12.2018
NL05.12.2018
PL05.12.2018
RO05.12.2018
RS05.12.2018
SE05.12.2018
SI05.12.2018
SK05.12.2018
SM05.12.2018
TR05.12.2018
BG05.03.2019
NO05.03.2019
GR06.03.2019
IS05.04.2019
PT05.04.2019
IE20.06.2019
LU20.06.2019
BE30.06.2019
CH30.06.2019
LI30.06.2019
Former [2021/26]AL05.12.2018
AT05.12.2018
CY05.12.2018
CZ05.12.2018
DK05.12.2018
EE05.12.2018
ES05.12.2018
FI05.12.2018
HR05.12.2018
IT05.12.2018
LT05.12.2018
LV05.12.2018
MC05.12.2018
NL05.12.2018
PL05.12.2018
RO05.12.2018
RS05.12.2018
SE05.12.2018
SI05.12.2018
SK05.12.2018
SM05.12.2018
TR05.12.2018
BG05.03.2019
NO05.03.2019
GR06.03.2019
IS05.04.2019
PT05.04.2019
IE20.06.2019
LU20.06.2019
BE30.06.2019
CH30.06.2019
LI30.06.2019
Former [2020/25]AL05.12.2018
AT05.12.2018
CZ05.12.2018
DK05.12.2018
EE05.12.2018
ES05.12.2018
FI05.12.2018
HR05.12.2018
IT05.12.2018
LT05.12.2018
LV05.12.2018
MC05.12.2018
NL05.12.2018
PL05.12.2018
RO05.12.2018
RS05.12.2018
SE05.12.2018
SI05.12.2018
SK05.12.2018
SM05.12.2018
TR05.12.2018
BG05.03.2019
NO05.03.2019
GR06.03.2019
IS05.04.2019
PT05.04.2019
IE20.06.2019
LU20.06.2019
BE30.06.2019
CH30.06.2019
LI30.06.2019
Former [2020/21]AL05.12.2018
AT05.12.2018
CZ05.12.2018
DK05.12.2018
EE05.12.2018
ES05.12.2018
FI05.12.2018
HR05.12.2018
IT05.12.2018
LT05.12.2018
LV05.12.2018
MC05.12.2018
NL05.12.2018
PL05.12.2018
RO05.12.2018
RS05.12.2018
SE05.12.2018
SI05.12.2018
SK05.12.2018
SM05.12.2018
TR05.12.2018
BG05.03.2019
NO05.03.2019
GR06.03.2019
IS05.04.2019
PT05.04.2019
IE20.06.2019
Former [2020/17]AL05.12.2018
AT05.12.2018
CZ05.12.2018
DK05.12.2018
EE05.12.2018
ES05.12.2018
FI05.12.2018
HR05.12.2018
IT05.12.2018
LT05.12.2018
LV05.12.2018
MC05.12.2018
NL05.12.2018
PL05.12.2018
RO05.12.2018
RS05.12.2018
SE05.12.2018
SI05.12.2018
SK05.12.2018
SM05.12.2018
TR05.12.2018
BG05.03.2019
NO05.03.2019
GR06.03.2019
IS05.04.2019
PT05.04.2019
Former [2020/08]AL05.12.2018
AT05.12.2018
CZ05.12.2018
DK05.12.2018
EE05.12.2018
ES05.12.2018
FI05.12.2018
HR05.12.2018
IT05.12.2018
LT05.12.2018
LV05.12.2018
MC05.12.2018
NL05.12.2018
PL05.12.2018
RO05.12.2018
RS05.12.2018
SE05.12.2018
SI05.12.2018
SK05.12.2018
SM05.12.2018
BG05.03.2019
NO05.03.2019
GR06.03.2019
IS05.04.2019
PT05.04.2019
Former [2019/50]AL05.12.2018
AT05.12.2018
CZ05.12.2018
DK05.12.2018
EE05.12.2018
ES05.12.2018
FI05.12.2018
HR05.12.2018
IT05.12.2018
LT05.12.2018
LV05.12.2018
NL05.12.2018
PL05.12.2018
RO05.12.2018
RS05.12.2018
SE05.12.2018
SI05.12.2018
SK05.12.2018
SM05.12.2018
BG05.03.2019
NO05.03.2019
GR06.03.2019
IS05.04.2019
PT05.04.2019
Former [2019/48]AL05.12.2018
AT05.12.2018
CZ05.12.2018
DK05.12.2018
EE05.12.2018
ES05.12.2018
FI05.12.2018
HR05.12.2018
IT05.12.2018
LT05.12.2018
LV05.12.2018
NL05.12.2018
PL05.12.2018
RO05.12.2018
RS05.12.2018
SE05.12.2018
SK05.12.2018
SM05.12.2018
BG05.03.2019
NO05.03.2019
GR06.03.2019
IS05.04.2019
PT05.04.2019
Former [2019/39]AL05.12.2018
AT05.12.2018
CZ05.12.2018
EE05.12.2018
ES05.12.2018
FI05.12.2018
HR05.12.2018
IT05.12.2018
LT05.12.2018
LV05.12.2018
NL05.12.2018
PL05.12.2018
RO05.12.2018
RS05.12.2018
SE05.12.2018
SK05.12.2018
SM05.12.2018
BG05.03.2019
NO05.03.2019
GR06.03.2019
IS05.04.2019
PT05.04.2019
Former [2019/37]AL05.12.2018
AT05.12.2018
CZ05.12.2018
EE05.12.2018
ES05.12.2018
FI05.12.2018
HR05.12.2018
IT05.12.2018
LT05.12.2018
LV05.12.2018
NL05.12.2018
PL05.12.2018
RO05.12.2018
RS05.12.2018
SE05.12.2018
SM05.12.2018
BG05.03.2019
NO05.03.2019
GR06.03.2019
PT05.04.2019
Former [2019/35]AL05.12.2018
AT05.12.2018
CZ05.12.2018
ES05.12.2018
FI05.12.2018
HR05.12.2018
IT05.12.2018
LT05.12.2018
LV05.12.2018
NL05.12.2018
PL05.12.2018
RS05.12.2018
SE05.12.2018
BG05.03.2019
NO05.03.2019
GR06.03.2019
PT05.04.2019
Former [2019/34]AL05.12.2018
AT05.12.2018
ES05.12.2018
FI05.12.2018
HR05.12.2018
IT05.12.2018
LT05.12.2018
LV05.12.2018
NL05.12.2018
RS05.12.2018
SE05.12.2018
BG05.03.2019
NO05.03.2019
GR06.03.2019
PT05.04.2019
Former [2019/33]AL05.12.2018
AT05.12.2018
ES05.12.2018
FI05.12.2018
HR05.12.2018
LT05.12.2018
LV05.12.2018
NL05.12.2018
RS05.12.2018
SE05.12.2018
BG05.03.2019
NO05.03.2019
GR06.03.2019
PT05.04.2019
Former [2019/30]AL05.12.2018
AT05.12.2018
ES05.12.2018
FI05.12.2018
HR05.12.2018
LT05.12.2018
LV05.12.2018
NL05.12.2018
RS05.12.2018
SE05.12.2018
BG05.03.2019
NO05.03.2019
GR06.03.2019
Former [2019/26]AL05.12.2018
AT05.12.2018
ES05.12.2018
FI05.12.2018
HR05.12.2018
LT05.12.2018
LV05.12.2018
RS05.12.2018
SE05.12.2018
BG05.03.2019
NO05.03.2019
GR06.03.2019
Former [2019/25]AT05.12.2018
ES05.12.2018
FI05.12.2018
HR05.12.2018
LT05.12.2018
LV05.12.2018
RS05.12.2018
SE05.12.2018
BG05.03.2019
NO05.03.2019
GR06.03.2019
Former [2019/24]AT05.12.2018
ES05.12.2018
FI05.12.2018
HR05.12.2018
LT05.12.2018
LV05.12.2018
SE05.12.2018
BG05.03.2019
NO05.03.2019
GR06.03.2019
Former [2019/23]AT05.12.2018
ES05.12.2018
FI05.12.2018
HR05.12.2018
LT05.12.2018
LV05.12.2018
BG05.03.2019
NO05.03.2019
Former [2019/22]FI05.12.2018
LT05.12.2018
BG05.03.2019
NO05.03.2019
Former [2019/21]FI05.12.2018
LT05.12.2018
NO05.03.2019
Former [2019/20]LT05.12.2018
NO05.03.2019
Documents cited:Search[XAI]US2005077919  (SOWDEN ANDREW JOHN [GB], et al) [X] 1,6 * paragraph [0002] - paragraph [0015] * * paragraph [0023] - paragraph [0028] * * paragraph [0039] - paragraph [0052] * * paragraph [0056] - paragraph [0078]; figures 1-4 * [A] 2-5,8-12 [I] 7,13-15;
 [XAI]EP2482456  (FREESCALE SEMICONDUCTOR INC [US]) [X] 1,6 * paragraph [0001] - paragraph [0003] * * paragraph [0018] - paragraph [0034] * * paragraph [0036] - paragraph [0037] * * paragraph [0057] - paragraph [0061]; figures 1-3A,4 * [A] 2-5,8-14 [I] 7,15;
 [A]US8878387  (WONG THOMAS S [US], et al) [A] 1-3,6-8,12 * column 1, line 20 - line 51 ** column 2, line 34 - column 8, line 34; figure - *
by applicantUS2014300188
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.