blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3116090

EP3116090 - METHOD FOR CONTROLLING THE LOAD DISTRIBUTION IN A POWER GRID [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  09.07.2021
Database last updated on 19.07.2024
FormerThe patent has been granted
Status updated on  31.07.2020
FormerGrant of patent is intended
Status updated on  23.04.2020
FormerExamination is in progress
Status updated on  16.11.2018
FormerRequest for examination was made
Status updated on  07.07.2017
FormerThe application has been published
Status updated on  09.12.2016
Most recent event   Tooltip27.04.2024Lapse of the patent in a contracting state
New state(s): MK
published on 29.05.2024  [2024/22]
Applicant(s)For all designated states
Deutsche Telekom AG
Friedrich-Ebert-Allee 140
53113 Bonn / DE
[2017/02]
Inventor(s)01 / Huber, Michael
Weinbergstrasse 14c
67434 Neustadt a. d. W. / DE
 [2017/02]
Representative(s)Braun-Dullaeus Pannen Emmerling Patent- & Rechtsanwaltspartnerschaft mbB
Platz der Ideen 2
40476 Düsseldorf / DE
[2020/36]
Former [2017/02]Braun-Dullaeus Pannen Patent- und Rechtsanwälte
Platz der Ideen 2
40476 Düsseldorf / DE
Application number, filing date16177737.004.07.2016
[2017/02]
Priority number, dateDE20151011119810.07.2015         Original published format: DE102015111198
[2017/02]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3116090
Date:11.01.2017
Language:DE
[2017/02]
Type: B1 Patent specification 
No.:EP3116090
Date:02.09.2020
Language:DE
[2020/36]
Search report(s)(Supplementary) European search report - dispatched on:EP17.11.2016
ClassificationIPC:H02J3/38, H02J3/14
[2017/02]
CPC:
H02J3/381 (EP,US); H02J3/14 (EP,US); H02J2310/14 (EP);
Y02B10/10 (EP); Y02B70/30 (EP); Y02B70/3225 (EP);
Y04S20/222 (EP); Y04S20/242 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/32]
Former [2017/02]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:VERFAHREN ZUR STEUERUNG DER LASTVERTEILUNG IN EINEM STROMNETZ[2017/02]
English:METHOD FOR CONTROLLING THE LOAD DISTRIBUTION IN A POWER GRID[2017/02]
French:PROCÉDÉ DE COMMANDE DE LA RÉPARTITION DE CHARGE DANS UN RÉSEAU ÉLECTRIQUE[2017/02]
Examination procedure04.07.2016Date on which the examining division has become responsible
27.06.2017Amendment by applicant (claims and/or description)
27.06.2017Examination requested  [2017/32]
15.11.2018Despatch of a communication from the examining division (Time limit: M02)
11.01.2019Reply to a communication from the examining division
08.11.2019Cancellation of oral proceeding that was planned for 28.11.2019
28.11.2019Date of oral proceedings (cancelled)
26.03.2020Cancellation of oral proceeding that was planned for 07.05.2020
24.04.2020Communication of intention to grant the patent
07.05.2020Date of oral proceedings (cancelled)
17.06.2020Fee for grant paid
17.06.2020Fee for publishing/printing paid
17.06.2020Receipt of the translation of the claim(s)
Opposition(s)03.06.2021No opposition filed within time limit [2021/32]
Fees paidRenewal fee
30.07.2018Renewal fee patent year 03
22.07.2019Renewal fee patent year 04
22.07.2020Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU04.07.2016
AL02.09.2020
CY02.09.2020
CZ02.09.2020
DK02.09.2020
EE02.09.2020
FI02.09.2020
HR02.09.2020
IT02.09.2020
LT02.09.2020
LV02.09.2020
MC02.09.2020
MK02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IS02.01.2021
PT04.01.2021
[2024/22]
Former [2023/30]HU04.07.2016
AL02.09.2020
CY02.09.2020
CZ02.09.2020
DK02.09.2020
EE02.09.2020
FI02.09.2020
HR02.09.2020
IT02.09.2020
LT02.09.2020
LV02.09.2020
MC02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IS02.01.2021
PT04.01.2021
Former [2023/28]HU04.07.2016
AL02.09.2020
CZ02.09.2020
DK02.09.2020
EE02.09.2020
FI02.09.2020
HR02.09.2020
IT02.09.2020
LT02.09.2020
LV02.09.2020
MC02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IS02.01.2021
PT04.01.2021
Former [2022/18]AL02.09.2020
CZ02.09.2020
DK02.09.2020
EE02.09.2020
FI02.09.2020
HR02.09.2020
IT02.09.2020
LT02.09.2020
LV02.09.2020
MC02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IS02.01.2021
PT04.01.2021
Former [2021/48]AL02.09.2020
CZ02.09.2020
DK02.09.2020
EE02.09.2020
FI02.09.2020
HR02.09.2020
IT02.09.2020
LT02.09.2020
LV02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IS02.01.2021
PT04.01.2021
Former [2021/37]AL02.09.2020
CZ02.09.2020
DK02.09.2020
EE02.09.2020
FI02.09.2020
HR02.09.2020
LT02.09.2020
LV02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IS02.01.2021
PT04.01.2021
Former [2021/36]AL02.09.2020
CZ02.09.2020
EE02.09.2020
FI02.09.2020
HR02.09.2020
LT02.09.2020
LV02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IS02.01.2021
PT04.01.2021
Former [2021/28]AL02.09.2020
CZ02.09.2020
EE02.09.2020
FI02.09.2020
HR02.09.2020
LT02.09.2020
LV02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SK02.09.2020
SM02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IS02.01.2021
PT04.01.2021
Former [2021/25]AL02.09.2020
CZ02.09.2020
EE02.09.2020
FI02.09.2020
HR02.09.2020
LT02.09.2020
LV02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SM02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IS02.01.2021
PT04.01.2021
Former [2021/23]CZ02.09.2020
EE02.09.2020
FI02.09.2020
HR02.09.2020
LT02.09.2020
LV02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SM02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
PT04.01.2021
Former [2021/22]CZ02.09.2020
EE02.09.2020
FI02.09.2020
HR02.09.2020
LT02.09.2020
LV02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
PT04.01.2021
Former [2021/21]FI02.09.2020
HR02.09.2020
LT02.09.2020
LV02.09.2020
PL02.09.2020
RS02.09.2020
SE02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
PT04.01.2021
Former [2021/10]FI02.09.2020
HR02.09.2020
LT02.09.2020
LV02.09.2020
PL02.09.2020
RS02.09.2020
SE02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
Former [2021/09]FI02.09.2020
LT02.09.2020
SE02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
Former [2021/08]FI02.09.2020
LT02.09.2020
SE02.09.2020
BG02.12.2020
NO02.12.2020
Former [2021/07]FI02.09.2020
LT02.09.2020
NO02.12.2020
Documents cited:Search[YD]DE102010017264  (ENTRASON GMBH [DE]) [YD] 5,12 * paragraph [0017] *;
 [XY]DE102012103081  (SMA SOLAR TECHNOLOGY AG [DE]) [X] 1-4,6,9,10 * figures 1-2 * * claims 1,22 * [Y] 5,7,12;
 [XY]US2014316599  (TOMITA YASUSHI [JP], et al) [X] 1-4,6,8-11 * 4th embodiment * * paragraph [0053] - paragraph [0094] * * figures 1,4,16 * [Y] 5,7,12;
 [XY]  - HARALD VOGT ET AL, "Market-based prosumer participation in the smart grid", DIGITAL ECOSYSTEMS AND TECHNOLOGIES (DEST), 2010 4TH IEEE INTERNATIONAL CONFERENCE ON, IEEE, PISCATAWAY, NJ, USA, (20100413), ISBN 978-1-4244-5551-5, pages 592 - 597, XP031781601 [X] 1,4,9 * figure 1 * [Y] 5,7,12
 [Y]  - MICHIORRI A ET AL, "A local energy management system for solar integration and improved security of supply: The Nice Grid project", INNOVATIVE SMART GRID TECHNOLOGIES (ISGT EUROPE), 2012 3RD IEEE PES INTERNATIONAL CONFERENCE AND EXHIBITION ON, IEEE, (20121014), doi:10.1109/ISGTEUROPE.2012.6465667, ISBN 978-1-4673-2595-0, pages 1 - 6, XP032332669 [Y] 7 * abstract * * figure 1 *

DOI:   http://dx.doi.org/10.1109/ISGTEurope.2012.6465667
ExaminationUS2013297959
    - LI DING ET AL, "Distributed Smart-Home Decision-Making in a Hierarchical Interactive Smart Grid Architecture", IEEE TRANSACTIONS ON PARALLEL AND DISTRIBUTED SYSTEMS, IEEE SERVICE CENTER, LOS ALAMITOS, CA, US, vol. 26, no. 1, doi:10.1109/TPDS.2014.2308204, ISSN 1045-9219, (20150101), pages 75 - 84, (20141209), XP011567420

DOI:   http://dx.doi.org/10.1109/TPDS.2014.2308204
by applicantDE102010017264
 DE102012224128
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.