EP3139485 - SOFT STARTING SYSTEM FOR AN ELECTRICAL MOTOR [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 22.07.2022 Database last updated on 16.07.2024 | |
Former | The patent has been granted Status updated on 13.08.2021 | ||
Former | Grant of patent is intended Status updated on 24.01.2021 | ||
Former | Examination is in progress Status updated on 07.12.2018 | ||
Former | Request for examination was made Status updated on 24.03.2017 | ||
Former | The application has been published Status updated on 03.02.2017 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Schneider Electric Industries SAS 35, rue Joseph Monier 92500 Rueil-Malmaison / FR | [2017/10] | Inventor(s) | 01 /
DENTELLA, Alain 220, Chemin des Etangs 38140 BEAUCROISSANT / FR | 02 /
PENKOV, Delcho 26 rue Olympe de Gouges 38400 SAINT MARTIN D'HERES / FR | [2017/10] | Representative(s) | Schneider Electric Service Propriété Industrielle 35, rue Joseph Monier CS 30323 92506 Rueil-Malmaison Cedex / FR | [N/P] |
Former [2021/37] | Mouney, Jérôme, et al Schneider Electric Industries SAS Service Propriété Industrielle 35 rue Joseph Monier - CS30323 92506 Rueil Malmaison Cedex / FR | ||
Former [2017/10] | Dufresne, Thierry Schneider Electric Industries SAS Service Propriété Industrielle 35 rue Joseph Monier - CS 30323 92506 Rueil-Malmaison Cedex / FR | Application number, filing date | 16177770.1 | 04.07.2016 | [2017/10] | Priority number, date | FR20150058204 | 04.09.2015 Original published format: FR 1558204 | [2017/10] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | EP3139485 | Date: | 08.03.2017 | Language: | FR | [2017/10] | Type: | B1 Patent specification | No.: | EP3139485 | Date: | 15.09.2021 | Language: | FR | [2021/37] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 19.01.2017 | Classification | IPC: | H02P1/42 | [2017/10] | CPC: |
H02P1/423 (EP,US);
H02P1/26 (CN,RU);
H02P1/16 (US);
H02P1/04 (RU);
H02P1/28 (RU);
H02J2310/12 (EP);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/17] |
Former [2017/10] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | PROGRESSIVES ANLASSVERFAHREN EINES ELEKTROMOTORS | [2017/10] | English: | SOFT STARTING SYSTEM FOR AN ELECTRICAL MOTOR | [2017/10] | French: | SYSTEME DE DEMARRAGE PROGRESSIF D'UN MOTEUR ELECTRIQUE | [2017/10] | Examination procedure | 04.07.2016 | Date on which the examining division has become responsible | 20.03.2017 | Examination requested [2017/17] | 24.08.2017 | Amendment by applicant (claims and/or description) | 05.12.2018 | Despatch of a communication from the examining division (Time limit: M04) | 20.02.2019 | Reply to a communication from the examining division | 15.07.2021 | Communication of intention to grant the patent | 06.08.2021 | Fee for grant paid | 06.08.2021 | Fee for publishing/printing paid | 06.08.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 16.06.2022 | No opposition filed within time limit [2022/34] | Fees paid | Renewal fee | 07.06.2018 | Renewal fee patent year 03 | 05.06.2019 | Renewal fee patent year 04 | 22.06.2020 | Renewal fee patent year 05 | 26.07.2021 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 04.07.2016 | AL | 15.09.2021 | AT | 15.09.2021 | CY | 15.09.2021 | CZ | 15.09.2021 | DK | 15.09.2021 | EE | 15.09.2021 | ES | 15.09.2021 | FI | 15.09.2021 | HR | 15.09.2021 | IT | 15.09.2021 | LT | 15.09.2021 | LV | 15.09.2021 | MC | 15.09.2021 | MK | 15.09.2021 | NL | 15.09.2021 | PL | 15.09.2021 | RO | 15.09.2021 | RS | 15.09.2021 | SE | 15.09.2021 | SI | 15.09.2021 | SK | 15.09.2021 | SM | 15.09.2021 | TR | 15.09.2021 | BG | 15.12.2021 | NO | 15.12.2021 | GR | 16.12.2021 | IS | 15.01.2022 | PT | 17.01.2022 | [2024/29] |
Former [2024/22] | HU | 04.07.2016 | |
AL | 15.09.2021 | ||
AT | 15.09.2021 | ||
CY | 15.09.2021 | ||
CZ | 15.09.2021 | ||
DK | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
IT | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
MC | 15.09.2021 | ||
MK | 15.09.2021 | ||
NL | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SI | 15.09.2021 | ||
SK | 15.09.2021 | ||
SM | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
Former [2024/20] | HU | 04.07.2016 | |
AL | 15.09.2021 | ||
AT | 15.09.2021 | ||
CY | 15.09.2021 | ||
CZ | 15.09.2021 | ||
DK | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
IT | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
MC | 15.09.2021 | ||
NL | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SI | 15.09.2021 | ||
SK | 15.09.2021 | ||
SM | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
Former [2024/18] | HU | 04.07.2016 | |
AL | 15.09.2021 | ||
AT | 15.09.2021 | ||
CZ | 15.09.2021 | ||
DK | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
IT | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
MC | 15.09.2021 | ||
NL | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SI | 15.09.2021 | ||
SK | 15.09.2021 | ||
SM | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
Former [2023/11] | AL | 15.09.2021 | |
AT | 15.09.2021 | ||
CZ | 15.09.2021 | ||
DK | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
IT | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
MC | 15.09.2021 | ||
NL | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SI | 15.09.2021 | ||
SK | 15.09.2021 | ||
SM | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
Former [2023/10] | AL | 15.09.2021 | |
AT | 15.09.2021 | ||
CZ | 15.09.2021 | ||
DK | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
IT | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
NL | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SI | 15.09.2021 | ||
SK | 15.09.2021 | ||
SM | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
Former [2022/36] | AL | 15.09.2021 | |
AT | 15.09.2021 | ||
CZ | 15.09.2021 | ||
DK | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
NL | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SI | 15.09.2021 | ||
SK | 15.09.2021 | ||
SM | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
Former [2022/29] | AL | 15.09.2021 | |
AT | 15.09.2021 | ||
CZ | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
NL | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SK | 15.09.2021 | ||
SM | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
Former [2022/25] | AT | 15.09.2021 | |
CZ | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
NL | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SK | 15.09.2021 | ||
SM | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
Former [2022/24] | AT | 15.09.2021 | |
CZ | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
NL | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SK | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
Former [2022/23] | AT | 15.09.2021 | |
CZ | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
PL | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SK | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
PT | 17.01.2022 | ||
Former [2022/21] | AT | 15.09.2021 | |
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
Former [2022/10] | FI | 15.09.2021 | |
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
Former [2022/09] | FI | 15.09.2021 | |
LT | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
Former [2022/08] | FI | 15.09.2021 | |
LT | 15.09.2021 | ||
SE | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
Former [2022/07] | LT | 15.09.2021 | |
NO | 15.12.2021 | Documents cited: | Search | [A]CN102185543B (UNIV SHANGHAI OCEAN) [A] 1-11 * figures 3,4, *; | [AD]FR2980058 (SCHNEIDER ELECTRIC IND SAS [FR]) [AD] 1-11 * the whole document * | [I] - George Templeton Thyristor, "AN1048/D RC Snubber Networks For Thyristor Power Control and Transient Suppression", (20080619), URL: http://www.onsemi.com/pub_link/Collateral/AN1048-D.PDF, (20160421), XP055267533 [I] 1-11 * the whole document * | by applicant | FR2980058 |