blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3139485

EP3139485 - SOFT STARTING SYSTEM FOR AN ELECTRICAL MOTOR [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  22.07.2022
Database last updated on 16.07.2024
FormerThe patent has been granted
Status updated on  13.08.2021
FormerGrant of patent is intended
Status updated on  24.01.2021
FormerExamination is in progress
Status updated on  07.12.2018
FormerRequest for examination was made
Status updated on  24.03.2017
FormerThe application has been published
Status updated on  03.02.2017
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024 [2024/29]
Applicant(s)For all designated states
Schneider Electric Industries SAS
35, rue Joseph Monier
92500 Rueil-Malmaison / FR
[2017/10]
Inventor(s)01 / DENTELLA, Alain
220, Chemin des Etangs
38140 BEAUCROISSANT / FR
02 / PENKOV, Delcho
26 rue Olympe de Gouges
38400 SAINT MARTIN D'HERES / FR
 [2017/10]
Representative(s)Schneider Electric
Service Propriété Industrielle
35, rue Joseph Monier
CS 30323
92506 Rueil-Malmaison Cedex / FR
[N/P]
Former [2021/37]Mouney, Jérôme, et al
Schneider Electric Industries SAS
Service Propriété Industrielle
35 rue Joseph Monier - CS30323
92506 Rueil Malmaison Cedex / FR
Former [2017/10]Dufresne, Thierry
Schneider Electric Industries SAS
Service Propriété Industrielle
35 rue Joseph Monier - CS 30323
92506 Rueil-Malmaison Cedex / FR
Application number, filing date16177770.104.07.2016
[2017/10]
Priority number, dateFR2015005820404.09.2015         Original published format: FR 1558204
[2017/10]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report 
No.:EP3139485
Date:08.03.2017
Language:FR
[2017/10]
Type: B1 Patent specification 
No.:EP3139485
Date:15.09.2021
Language:FR
[2021/37]
Search report(s)(Supplementary) European search report - dispatched on:EP19.01.2017
ClassificationIPC:H02P1/42
[2017/10]
CPC:
H02P1/423 (EP,US); H02P1/26 (CN,RU); H02P1/16 (US);
H02P1/04 (RU); H02P1/28 (RU); H02J2310/12 (EP);
Y02P80/14 (US); Y02P80/15 (US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/17]
Former [2017/10]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:PROGRESSIVES ANLASSVERFAHREN EINES ELEKTROMOTORS[2017/10]
English:SOFT STARTING SYSTEM FOR AN ELECTRICAL MOTOR[2017/10]
French:SYSTEME DE DEMARRAGE PROGRESSIF D'UN MOTEUR ELECTRIQUE[2017/10]
Examination procedure04.07.2016Date on which the examining division has become responsible
20.03.2017Examination requested  [2017/17]
24.08.2017Amendment by applicant (claims and/or description)
05.12.2018Despatch of a communication from the examining division (Time limit: M04)
20.02.2019Reply to a communication from the examining division
15.07.2021Communication of intention to grant the patent
06.08.2021Fee for grant paid
06.08.2021Fee for publishing/printing paid
06.08.2021Receipt of the translation of the claim(s)
Opposition(s)16.06.2022No opposition filed within time limit [2022/34]
Fees paidRenewal fee
07.06.2018Renewal fee patent year 03
05.06.2019Renewal fee patent year 04
22.06.2020Renewal fee patent year 05
26.07.2021Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU04.07.2016
AL15.09.2021
AT15.09.2021
CY15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
IT15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
MK15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SI15.09.2021
SK15.09.2021
SM15.09.2021
TR15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
[2024/29]
Former [2024/22]HU04.07.2016
AL15.09.2021
AT15.09.2021
CY15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
IT15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
MK15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SI15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
Former [2024/20]HU04.07.2016
AL15.09.2021
AT15.09.2021
CY15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
IT15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SI15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
Former [2024/18]HU04.07.2016
AL15.09.2021
AT15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
IT15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SI15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
Former [2023/11]AL15.09.2021
AT15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
IT15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SI15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
Former [2023/10]AL15.09.2021
AT15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
IT15.09.2021
LT15.09.2021
LV15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SI15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
Former [2022/36]AL15.09.2021
AT15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SI15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
Former [2022/29]AL15.09.2021
AT15.09.2021
CZ15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
Former [2022/25]AT15.09.2021
CZ15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
Former [2022/24]AT15.09.2021
CZ15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
NL15.09.2021
PL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SK15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
Former [2022/23]AT15.09.2021
CZ15.09.2021
EE15.09.2021
ES15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
PL15.09.2021
RS15.09.2021
SE15.09.2021
SK15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
PT17.01.2022
Former [2022/21]AT15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
RS15.09.2021
SE15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
Former [2022/10]FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
RS15.09.2021
SE15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
Former [2022/09]FI15.09.2021
LT15.09.2021
RS15.09.2021
SE15.09.2021
BG15.12.2021
NO15.12.2021
Former [2022/08]FI15.09.2021
LT15.09.2021
SE15.09.2021
BG15.12.2021
NO15.12.2021
Former [2022/07]LT15.09.2021
NO15.12.2021
Documents cited:Search[A]CN102185543B  (UNIV SHANGHAI OCEAN) [A] 1-11 * figures 3,4, *;
 [AD]FR2980058  (SCHNEIDER ELECTRIC IND SAS [FR]) [AD] 1-11 * the whole document *
 [I]  - George Templeton Thyristor, "AN1048/D RC Snubber Networks For Thyristor Power Control and Transient Suppression", (20080619), URL: http://www.onsemi.com/pub_link/Collateral/AN1048-D.PDF, (20160421), XP055267533 [I] 1-11 * the whole document *
by applicantFR2980058
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.