blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3115698

EP3115698 - HOTPLATE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  11.09.2020
Database last updated on 15.06.2024
FormerThe patent has been granted
Status updated on  04.10.2019
FormerGrant of patent is intended
Status updated on  07.07.2019
FormerRequest for examination was made
Status updated on  14.07.2017
FormerThe application has been published
Status updated on  09.12.2016
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
E.G.O. Elektro-Gerätebau GmbH
Rote-Tor-Strasse 14
75038 Oberderdingen / DE
[2017/02]
Inventor(s)01 / Baier, Martin
Schöllbronner Straße 89
76275 Ettlingen / DE
02 / Ose, Dr. Lutz
Kilgenweg 34
75447 Sternenfels / DE
03 / Thimm, Dr. Wolfgang
Welfenstraße 31b
76137 Karlsruhe / DE
04 / Wittenhagen, Wolfgang
Am Schänzle 3
75015 Bretten / DE
 [2017/02]
Representative(s)Patentanwälte Ruff, Wilhelm, Beier, Dauster & Partner mbB
Kronenstraße 30
70174 Stuttgart / DE
[2017/02]
Application number, filing date16177904.605.07.2016
[2017/02]
Priority number, dateDE20151021291609.07.2015         Original published format: DE102015212916
[2017/02]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3115698
Date:11.01.2017
Language:DE
[2017/02]
Type: B1 Patent specification 
No.:EP3115698
Date:06.11.2019
Language:DE
[2019/45]
Search report(s)(Supplementary) European search report - dispatched on:EP15.11.2016
ClassificationIPC:F24C7/08, C09K11/00, H05B3/74, F24C7/06, F24C15/10, H05B3/76, F24C7/04
[2019/30]
CPC:
F24C7/083 (EP,US); F24C15/102 (US); F24C7/046 (US);
F24C7/067 (US); H05B3/26 (US); H05B3/746 (EP,US);
H05B3/76 (EP,US); H05B2203/032 (EP,US) (-)
Former IPC [2017/02]F24C7/08, C09K11/00, H05B3/74
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/33]
Former [2017/02]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:KOCHFELD[2017/02]
English:HOTPLATE[2017/02]
French:PLAN DE CUISSON[2017/02]
Examination procedure05.07.2016Date on which the examining division has become responsible
05.07.2017Amendment by applicant (claims and/or description)
05.07.2017Examination requested  [2017/33]
08.07.2019Communication of intention to grant the patent
24.09.2019Fee for grant paid
24.09.2019Fee for publishing/printing paid
24.09.2019Receipt of the translation of the claim(s)
Opposition(s)07.08.2020No opposition filed within time limit [2020/42]
Fees paidRenewal fee
20.07.2018Renewal fee patent year 03
25.07.2019Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU05.07.2016
AL06.11.2019
CY06.11.2019
CZ06.11.2019
DK06.11.2019
EE06.11.2019
FI06.11.2019
HR06.11.2019
IT06.11.2019
LT06.11.2019
LV06.11.2019
MC06.11.2019
MK06.11.2019
MT06.11.2019
NL06.11.2019
PL06.11.2019
RO06.11.2019
RS06.11.2019
SE06.11.2019
SI06.11.2019
SK06.11.2019
SM06.11.2019
BG06.02.2020
NO06.02.2020
GR07.02.2020
IS06.03.2020
PT06.03.2020
GB05.07.2020
IE05.07.2020
LU05.07.2020
BE31.07.2020
CH31.07.2020
FR31.07.2020
LI31.07.2020
[2022/32]
Former [2022/28]HU05.07.2016
AL06.11.2019
CY06.11.2019
CZ06.11.2019
DK06.11.2019
EE06.11.2019
FI06.11.2019
HR06.11.2019
IT06.11.2019
LT06.11.2019
LV06.11.2019
MC06.11.2019
MT06.11.2019
NL06.11.2019
PL06.11.2019
RO06.11.2019
RS06.11.2019
SE06.11.2019
SI06.11.2019
SK06.11.2019
SM06.11.2019
BG06.02.2020
NO06.02.2020
GR07.02.2020
IS06.03.2020
PT06.03.2020
GB05.07.2020
IE05.07.2020
LU05.07.2020
BE31.07.2020
CH31.07.2020
FR31.07.2020
LI31.07.2020
Former [2021/23]AL06.11.2019
CZ06.11.2019
DK06.11.2019
EE06.11.2019
FI06.11.2019
HR06.11.2019
IT06.11.2019
LT06.11.2019
LV06.11.2019
MC06.11.2019
NL06.11.2019
PL06.11.2019
RO06.11.2019
RS06.11.2019
SE06.11.2019
SI06.11.2019
SK06.11.2019
SM06.11.2019
BG06.02.2020
NO06.02.2020
GR07.02.2020
IS06.03.2020
PT06.03.2020
GB05.07.2020
IE05.07.2020
LU05.07.2020
BE31.07.2020
CH31.07.2020
FR31.07.2020
LI31.07.2020
Former [2021/22]AL06.11.2019
CZ06.11.2019
DK06.11.2019
EE06.11.2019
FI06.11.2019
HR06.11.2019
IT06.11.2019
LT06.11.2019
LV06.11.2019
MC06.11.2019
NL06.11.2019
PL06.11.2019
RO06.11.2019
RS06.11.2019
SE06.11.2019
SI06.11.2019
SK06.11.2019
SM06.11.2019
BG06.02.2020
NO06.02.2020
GR07.02.2020
IS06.03.2020
PT06.03.2020
GB05.07.2020
IE05.07.2020
LU05.07.2020
CH31.07.2020
LI31.07.2020
Former [2021/20]AL06.11.2019
CZ06.11.2019
DK06.11.2019
EE06.11.2019
FI06.11.2019
HR06.11.2019
IT06.11.2019
LT06.11.2019
LV06.11.2019
MC06.11.2019
NL06.11.2019
PL06.11.2019
RO06.11.2019
RS06.11.2019
SE06.11.2019
SI06.11.2019
SK06.11.2019
SM06.11.2019
BG06.02.2020
NO06.02.2020
GR07.02.2020
IS06.03.2020
PT06.03.2020
IE05.07.2020
LU05.07.2020
CH31.07.2020
LI31.07.2020
Former [2021/15]AL06.11.2019
CZ06.11.2019
DK06.11.2019
EE06.11.2019
FI06.11.2019
HR06.11.2019
IT06.11.2019
LT06.11.2019
LV06.11.2019
MC06.11.2019
NL06.11.2019
PL06.11.2019
RO06.11.2019
RS06.11.2019
SE06.11.2019
SI06.11.2019
SK06.11.2019
SM06.11.2019
BG06.02.2020
NO06.02.2020
GR07.02.2020
IS06.03.2020
PT06.03.2020
Former [2021/10]AL06.11.2019
CZ06.11.2019
DK06.11.2019
EE06.11.2019
FI06.11.2019
HR06.11.2019
IT06.11.2019
LT06.11.2019
LV06.11.2019
NL06.11.2019
PL06.11.2019
RO06.11.2019
RS06.11.2019
SE06.11.2019
SI06.11.2019
SK06.11.2019
SM06.11.2019
BG06.02.2020
NO06.02.2020
GR07.02.2020
IS06.03.2020
PT06.03.2020
Former [2020/51]AL06.11.2019
CZ06.11.2019
DK06.11.2019
EE06.11.2019
FI06.11.2019
HR06.11.2019
LT06.11.2019
LV06.11.2019
NL06.11.2019
PL06.11.2019
RO06.11.2019
RS06.11.2019
SE06.11.2019
SI06.11.2019
SK06.11.2019
SM06.11.2019
BG06.02.2020
NO06.02.2020
GR07.02.2020
IS06.03.2020
PT06.03.2020
Former [2020/37]AL06.11.2019
CZ06.11.2019
DK06.11.2019
EE06.11.2019
FI06.11.2019
HR06.11.2019
LT06.11.2019
LV06.11.2019
NL06.11.2019
PL06.11.2019
RO06.11.2019
RS06.11.2019
SE06.11.2019
SK06.11.2019
SM06.11.2019
BG06.02.2020
NO06.02.2020
GR07.02.2020
IS06.03.2020
PT06.03.2020
Former [2020/36]AL06.11.2019
CZ06.11.2019
DK06.11.2019
EE06.11.2019
FI06.11.2019
HR06.11.2019
LT06.11.2019
LV06.11.2019
NL06.11.2019
PL06.11.2019
RO06.11.2019
RS06.11.2019
SE06.11.2019
BG06.02.2020
NO06.02.2020
GR07.02.2020
IS06.03.2020
PT06.03.2020
Former [2020/35]AL06.11.2019
CZ06.11.2019
FI06.11.2019
HR06.11.2019
LT06.11.2019
LV06.11.2019
NL06.11.2019
PL06.11.2019
RO06.11.2019
RS06.11.2019
SE06.11.2019
BG06.02.2020
NO06.02.2020
GR07.02.2020
IS06.03.2020
PT06.03.2020
Former [2020/32]AL06.11.2019
FI06.11.2019
HR06.11.2019
LT06.11.2019
LV06.11.2019
NL06.11.2019
PL06.11.2019
RS06.11.2019
SE06.11.2019
BG06.02.2020
NO06.02.2020
GR07.02.2020
IS06.03.2020
PT06.03.2020
Former [2020/25]FI06.11.2019
HR06.11.2019
LT06.11.2019
LV06.11.2019
NL06.11.2019
PL06.11.2019
RS06.11.2019
SE06.11.2019
BG06.02.2020
NO06.02.2020
GR07.02.2020
IS06.03.2020
PT06.03.2020
Former [2020/24]FI06.11.2019
LT06.11.2019
LV06.11.2019
NL06.11.2019
PL06.11.2019
SE06.11.2019
BG06.02.2020
NO06.02.2020
GR07.02.2020
IS06.03.2020
PT06.03.2020
Former [2020/23]FI06.11.2019
LT06.11.2019
LV06.11.2019
NL06.11.2019
PL06.11.2019
SE06.11.2019
BG06.02.2020
NO06.02.2020
GR07.02.2020
PT06.03.2020
Former [2020/22]FI06.11.2019
LT06.11.2019
SE06.11.2019
BG06.02.2020
NO06.02.2020
PT06.03.2020
Former [2020/21]NO06.02.2020
Documents cited:Search[YD]EP0750444  (EGO ELEKTRO GERAETEBAU GMBH [DE]) [YD] 1-12 * figure 2 *;
 [A]DE102004040759  (SCHOTT AG [DE]) [A] 1-12 * claim 1 *;
 [Y]WO2008128900  (BSH BOSCH SIEMENS HAUSGERAETE [DE], et al) [Y] 1-12 * page 4, lines 12-13,21-27; figure 1; claims 1-3 * * page 9, line 21 * * page 10, lines 1-4 *;
 [A]EP2587165  (EGO ELEKTRO GERAETEBAU GMBH [DE]) [A] 1-12 * abstract *;
 [A]DE102014200178  (BSH BOSCH & SIEMENS HAUSGERAETE GMBH [DE]) [A] 1-12* claim 1 *;
 [A]EP2824392  (BSH BOSCH & SIEMENS HAUSGERAETE GMBH [DE]) [A] 1-12 * claim 3 *
by applicantUS4806772
 EP0585831
 EP0750444
 DE102009048495
 DE102011085112
 DE102012204546
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.