blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3101144

EP3101144 - SENSING APPARATUS AND METHOD [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  11.01.2019
Database last updated on 13.09.2024
FormerThe patent has been granted
Status updated on  02.02.2018
FormerGrant of patent is intended
Status updated on  19.10.2017
FormerExamination is in progress
Status updated on  23.06.2017
FormerRequest for examination was made
Status updated on  15.06.2017
FormerThe application has been published
Status updated on  04.11.2016
Most recent event   Tooltip10.07.2020Lapse of the patent in a contracting state
New state(s): IS
published on 12.08.2020  [2020/33]
Applicant(s)For all designated states
DNAE GROUP HOLDINGS LIMITED
Ugli Campus Block C
56 Wood Lane
London W12 7SB / GB
[2016/49]
Inventor(s)01 / ANSARI, Zahid
c/o DNA Electronics Ltd
Ugli Campus Block C
56 Wood Lane
London Greater London W12 7SB / GB
02 / AMIN, Krishna
604 Alana Ct.
Stockbridge Georgia 30281 / US
03 / JORGENSEN, Ginny
3 Bollin Drive
Sale M33 3GH / GB
04 / KOLB, Kurt
46 Rosser Avenue
Burnaby BC V5C5C2 / CA
05 / MORLEY, Daniel
c/o DNA Electronics Ltd
Ugli Campus Block C
56 Wood Lane
London Greater London W12 7SB / GB
06 / PATEL, Alpesh
c/o DNA Electronics Ltd
Ugli Campus Block C
56 Wood Lane
London Greater London W12 7SB / GB
07 / REED, Sam
c/o DNA Electronics Ltd
Ugli Campus Block C
56 Wood Lane
London Greater London W12 7SB / GB
08 / SHEPHERD, Leila
60 Valetta Road
London W3 7TN / GB
09 / TOUMAZOU, Christofer
c/o DNA Electronics Ltd
Ugli Campus Block C
56 Wood Lane
London Greater London W12 7SB / GB
 [2017/11]
Former [2016/49]01 / ANSARI, Zahid
c/o DNA Electronics Ltd
Ugli Campus Block C
56 Wood Lane
London Greater London W12 7SB / GB
02 / AMIN, Krishna
c/o DNA Electronics Ltd
Ugli Campus Block C
56 Wood Lane
London Greater London W12 7SB / GB
03 / JORGENSEN, Ginny
c/o DNA Electronics Ltd
Ugli Campus Block C
56 Wood Lane
London Greater London W12 7SB / GB
04 / KOLB, Kurt
c/o DNA Electronics Ltd
Ugli Campus Block C
56 Wood Lane
London Greater London W12 7SB / GB
05 / MORLEY, Daniel
c/o DNA Electronics Ltd
Ugli Campus Block C
56 Wood Lane
London Greater London W12 7SB / GB
06 / PATEL, Alpesh
c/o DNA Electronics Ltd
Ugli Campus Block C
56 Wood Lane
London Greater London W12 7SB / GB
07 / REED, Sam
c/o DNA Electronics Ltd
Ugli Campus Block C
56 Wood Lane
London Greater London W12 7SB / GB
08 / SHEPHERD, Leila
c/o DNA Electronics Ltd
Ugli Campus Block C
56 Wood Lane
London Greater London W12 7SB / GB
09 / TOUMAZOU, Christofer
c/o DNA Electronics Ltd
Ugli Campus Block C
56 Wood Lane
London Greater London W12 7SB / GB
Representative(s)Lind, Robert
Marks & Clerk LLP
2nd Floor, Wytham Court
11 West Way
Oxford OX2 0JB / GB
[N/P]
Former [2016/49]Lind, Robert
Marks & Clerk LLP
Fletcher House
Heatley Road The Oxford Science Park
Oxford OX4 4GE / GB
Application number, filing date16179947.318.07.2013
[2016/49]
Priority number, dateGB2012001277518.07.2012         Original published format: GB 201212775
[2016/49]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3101144
Date:07.12.2016
Language:EN
[2016/49]
Type: B1 Patent specification 
No.:EP3101144
Date:07.03.2018
Language:EN
[2018/10]
Search report(s)(Supplementary) European search report - dispatched on:EP14.10.2016
ClassificationIPC:C12Q1/68
[2016/49]
CPC:
C12Q1/6874 (EP,US); C12Q1/6869 (EP,CN,US); B01L7/52 (US);
B01L2200/147 (US); B01L2300/0627 (US); B01L2300/123 (US);
B01L2300/1827 (US) (-)
C-Set:
C12Q1/6869, C12Q2527/101, C12Q2527/119, C12Q2535/122, C12Q2543/101, C12Q2547/101, C12Q2565/537, C12Q2565/629 (CN);
C12Q1/6874, C12Q2527/101, C12Q2527/119, C12Q2535/122, C12Q2543/101, C12Q2547/101, C12Q2565/537, C12Q2565/629 (EP,US);
C12Q1/6874, C12Q2527/101, C12Q2563/143, C12Q2563/149, C12Q2535/122, C12Q2543/101, C12Q2547/101, C12Q2565/537, C12Q2565/629 (CN)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/28]
Former [2016/49]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:ABTASTVORRICHTUNG UND -VERFAHREN[2016/49]
English:SENSING APPARATUS AND METHOD[2016/49]
French:APPAREIL ET PROCÉDÉ DE DÉTECTION[2016/49]
Examination procedure18.07.2016Date on which the examining division has become responsible
26.05.2017Amendment by applicant (claims and/or description)
26.05.2017Examination requested  [2017/28]
22.06.2017Despatch of a communication from the examining division (Time limit: M04)
31.07.2017Reply to a communication from the examining division
20.10.2017Communication of intention to grant the patent
19.01.2018Fee for grant paid
19.01.2018Fee for publishing/printing paid
19.01.2018Receipt of the translation of the claim(s)
Parent application(s)   TooltipEP13740352.3  / EP2875153
Opposition(s)10.12.2018No opposition filed within time limit [2019/07]
Fees paidRenewal fee
18.07.2016Renewal fee patent year 03
18.07.2016Renewal fee patent year 04
24.07.2017Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU18.07.2013
AL07.03.2018
AT07.03.2018
CY07.03.2018
CZ07.03.2018
DK07.03.2018
EE07.03.2018
FI07.03.2018
HR07.03.2018
LT07.03.2018
LV07.03.2018
MC07.03.2018
MK07.03.2018
PL07.03.2018
RO07.03.2018
RS07.03.2018
SI07.03.2018
SK07.03.2018
SM07.03.2018
TR07.03.2018
BG07.06.2018
NO07.06.2018
GR08.06.2018
IS07.07.2018
PT09.07.2018
IE18.07.2018
LU18.07.2018
MT18.07.2018
BE31.07.2018
CH31.07.2018
LI31.07.2018
[2020/33]
Former [2020/31]HU18.07.2013
AL07.03.2018
AT07.03.2018
CY07.03.2018
CZ07.03.2018
DK07.03.2018
EE07.03.2018
FI07.03.2018
HR07.03.2018
LT07.03.2018
LV07.03.2018
MC07.03.2018
MK07.03.2018
PL07.03.2018
RO07.03.2018
RS07.03.2018
SI07.03.2018
SK07.03.2018
SM07.03.2018
TR07.03.2018
BG07.06.2018
NO07.06.2018
GR08.06.2018
PT09.07.2018
IE18.07.2018
LU18.07.2018
MT18.07.2018
BE31.07.2018
CH31.07.2018
LI31.07.2018
Former [2020/30]HU18.07.2013
AL07.03.2018
AT07.03.2018
CY07.03.2018
CZ07.03.2018
DK07.03.2018
EE07.03.2018
FI07.03.2018
HR07.03.2018
LT07.03.2018
LV07.03.2018
MC07.03.2018
PL07.03.2018
RO07.03.2018
RS07.03.2018
SI07.03.2018
SK07.03.2018
SM07.03.2018
TR07.03.2018
BG07.06.2018
NO07.06.2018
GR08.06.2018
PT09.07.2018
IE18.07.2018
LU18.07.2018
MT18.07.2018
BE31.07.2018
CH31.07.2018
LI31.07.2018
Former [2020/16]AL07.03.2018
AT07.03.2018
CY07.03.2018
CZ07.03.2018
DK07.03.2018
EE07.03.2018
FI07.03.2018
HR07.03.2018
LT07.03.2018
LV07.03.2018
MC07.03.2018
PL07.03.2018
RO07.03.2018
RS07.03.2018
SI07.03.2018
SK07.03.2018
SM07.03.2018
TR07.03.2018
BG07.06.2018
NO07.06.2018
GR08.06.2018
PT09.07.2018
IE18.07.2018
LU18.07.2018
MT18.07.2018
BE31.07.2018
CH31.07.2018
LI31.07.2018
Former [2020/08]AL07.03.2018
AT07.03.2018
CY07.03.2018
CZ07.03.2018
DK07.03.2018
EE07.03.2018
FI07.03.2018
HR07.03.2018
LT07.03.2018
LV07.03.2018
MC07.03.2018
PL07.03.2018
RO07.03.2018
RS07.03.2018
SI07.03.2018
SK07.03.2018
SM07.03.2018
BG07.06.2018
NO07.06.2018
GR08.06.2018
PT09.07.2018
IE18.07.2018
LU18.07.2018
MT18.07.2018
BE31.07.2018
CH31.07.2018
LI31.07.2018
Former [2019/24]AL07.03.2018
AT07.03.2018
CY07.03.2018
CZ07.03.2018
DK07.03.2018
EE07.03.2018
FI07.03.2018
HR07.03.2018
LT07.03.2018
LV07.03.2018
MC07.03.2018
PL07.03.2018
RO07.03.2018
RS07.03.2018
SI07.03.2018
SK07.03.2018
SM07.03.2018
BG07.06.2018
NO07.06.2018
GR08.06.2018
PT09.07.2018
IE18.07.2018
LU18.07.2018
BE31.07.2018
CH31.07.2018
LI31.07.2018
Former [2019/21]AL07.03.2018
AT07.03.2018
CY07.03.2018
CZ07.03.2018
DK07.03.2018
EE07.03.2018
FI07.03.2018
HR07.03.2018
LT07.03.2018
LV07.03.2018
MC07.03.2018
PL07.03.2018
RO07.03.2018
RS07.03.2018
SI07.03.2018
SK07.03.2018
SM07.03.2018
BG07.06.2018
NO07.06.2018
GR08.06.2018
PT09.07.2018
IE18.07.2018
LU18.07.2018
CH31.07.2018
LI31.07.2018
Former [2019/19]AL07.03.2018
AT07.03.2018
CY07.03.2018
CZ07.03.2018
DK07.03.2018
EE07.03.2018
FI07.03.2018
HR07.03.2018
LT07.03.2018
LV07.03.2018
MC07.03.2018
PL07.03.2018
RO07.03.2018
RS07.03.2018
SI07.03.2018
SK07.03.2018
SM07.03.2018
BG07.06.2018
NO07.06.2018
GR08.06.2018
PT09.07.2018
IE18.07.2018
LU18.07.2018
Former [2019/17]AL07.03.2018
AT07.03.2018
CY07.03.2018
CZ07.03.2018
DK07.03.2018
EE07.03.2018
FI07.03.2018
HR07.03.2018
LT07.03.2018
LV07.03.2018
MC07.03.2018
PL07.03.2018
RO07.03.2018
RS07.03.2018
SI07.03.2018
SK07.03.2018
SM07.03.2018
BG07.06.2018
NO07.06.2018
GR08.06.2018
PT09.07.2018
LU18.07.2018
Former [2019/15]AL07.03.2018
AT07.03.2018
CY07.03.2018
CZ07.03.2018
DK07.03.2018
EE07.03.2018
FI07.03.2018
HR07.03.2018
LT07.03.2018
LV07.03.2018
MC07.03.2018
PL07.03.2018
RO07.03.2018
RS07.03.2018
SI07.03.2018
SK07.03.2018
SM07.03.2018
BG07.06.2018
NO07.06.2018
GR08.06.2018
PT09.07.2018
Former [2019/13]AL07.03.2018
AT07.03.2018
CY07.03.2018
CZ07.03.2018
DK07.03.2018
EE07.03.2018
FI07.03.2018
HR07.03.2018
LT07.03.2018
LV07.03.2018
PL07.03.2018
RO07.03.2018
RS07.03.2018
SI07.03.2018
SK07.03.2018
SM07.03.2018
BG07.06.2018
NO07.06.2018
GR08.06.2018
PT09.07.2018
Former [2019/08]AL07.03.2018
AT07.03.2018
CY07.03.2018
CZ07.03.2018
DK07.03.2018
EE07.03.2018
FI07.03.2018
HR07.03.2018
LT07.03.2018
LV07.03.2018
PL07.03.2018
RO07.03.2018
RS07.03.2018
SK07.03.2018
SM07.03.2018
BG07.06.2018
NO07.06.2018
GR08.06.2018
PT09.07.2018
Former [2019/03]AL07.03.2018
AT07.03.2018
CY07.03.2018
CZ07.03.2018
EE07.03.2018
FI07.03.2018
HR07.03.2018
LT07.03.2018
LV07.03.2018
PL07.03.2018
RO07.03.2018
RS07.03.2018
SK07.03.2018
SM07.03.2018
BG07.06.2018
NO07.06.2018
GR08.06.2018
PT09.07.2018
Former [2018/52]AL07.03.2018
AT07.03.2018
CY07.03.2018
CZ07.03.2018
EE07.03.2018
FI07.03.2018
HR07.03.2018
LT07.03.2018
LV07.03.2018
PL07.03.2018
RO07.03.2018
RS07.03.2018
SK07.03.2018
SM07.03.2018
BG07.06.2018
NO07.06.2018
GR08.06.2018
Former [2018/50]AL07.03.2018
AT07.03.2018
CY07.03.2018
CZ07.03.2018
EE07.03.2018
FI07.03.2018
HR07.03.2018
LT07.03.2018
LV07.03.2018
PL07.03.2018
RO07.03.2018
RS07.03.2018
SK07.03.2018
BG07.06.2018
NO07.06.2018
GR08.06.2018
Former [2018/46]AL07.03.2018
CY07.03.2018
FI07.03.2018
HR07.03.2018
LT07.03.2018
LV07.03.2018
RS07.03.2018
BG07.06.2018
NO07.06.2018
GR08.06.2018
Former [2018/40]CY07.03.2018
FI07.03.2018
HR07.03.2018
LT07.03.2018
LV07.03.2018
RS07.03.2018
BG07.06.2018
NO07.06.2018
GR08.06.2018
Former [2018/37]CY07.03.2018
FI07.03.2018
HR07.03.2018
LT07.03.2018
NO07.06.2018
GR08.06.2018
Former [2018/35]CY07.03.2018
FI07.03.2018
HR07.03.2018
LT07.03.2018
NO07.06.2018
Documents cited:Search[X]WO2011123246  (ILLUMINA INC [US], et al) [X] 1-12 * paragraphs [0081] , [ 103] , [ 114] *;
 [X]WO2008076406  (ION TORRENT SYSTEMS INC [US], et al) [X] 1-12 * paragraphs [0124] , [0318] , [0319] , [ 322] , [0331] , [ 334] *;
 [XD]WO2008107014  (DNA ELECTRONICS LTD [GB], et al) [XD] 1-12 * page 14; figure 4; claim 6 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.