EP3106967 - MULTIPOINT TOUCH SCREEN [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 14.12.2018 Database last updated on 09.07.2024 | |
Former | The patent has been granted Status updated on 05.01.2018 | ||
Former | Grant of patent is intended Status updated on 17.08.2017 | ||
Former | Request for examination was made Status updated on 18.11.2016 | Most recent event Tooltip | 19.06.2020 | Lapse of the patent in a contracting state New state(s): HU, RO | published on 22.07.2020 [2020/30] | Applicant(s) | For all designated states Apple Inc. One Apple Park Way Cupertino CA 95014 / US | [2018/31] |
Former [2017/37] | For all designated states Apple Inc. 1 Infinite Loop Cupertino, CA 95014 / US | ||
Former [2016/51] | For all designated states Apple Inc. 1 Infinite Loop Cupertino, CA 95014-2094 / US | Inventor(s) | 01 /
HOTELLING, Steven Porter c/o Apple Inc. 1 Infinite Loop Cupertino, CA, 95014 / US | 02 /
STRICKON, Joshua A. 330 Harbor Ct. Key Biscayne, FL, 33149 / US | 03 /
HUPPI, Brian Q. c/o Apple Inc. 1 Infinite Loop Cupertino, CA, 95014 / US | [2016/51] | Representative(s) | Lang, Johannes Bardehle Pagenberg Partnerschaft mbB Patentanwälte, Rechtsanwälte Prinzregentenplatz 7 81675 München / DE | [2016/51] | Application number, filing date | 16181023.9 | 26.04.2005 | [2016/51] | Priority number, date | US20040840862 | 06.05.2004 Original published format: US 840862 | [2016/51] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3106967 | Date: | 21.12.2016 | Language: | EN | [2016/51] | Type: | B1 Patent specification | No.: | EP3106967 | Date: | 07.02.2018 | Language: | EN | [2018/06] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 13.09.2016 | Classification | IPC: | G06F3/044 | [2017/35] | CPC: |
G06F3/0443 (EP,KR,US);
G06F3/0412 (EP,KR,US);
G02F1/13338 (KR,US);
G06F3/0414 (US);
G06F3/0416 (KR,US);
G06F3/04164 (EP);
G06F3/04166 (EP,KR,US);
G06F3/044 (KR,US);
G06F3/0445 (EP,KR,US);
G06F3/0446 (EP,KR,US);
G06F2203/04101 (KR,US);
G06F2203/04104 (EP,KR,US);
G06F2203/04105 (KR,US)
(-)
|
Former IPC [2016/51] | G06F3/033 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, MC, NL, PL, PT, RO, SE, SI, SK, TR [2016/51] | Title | German: | MEHRPUNKT-BERÜHRUNGSBILDSCHIRM | [2016/51] | English: | MULTIPOINT TOUCH SCREEN | [2016/51] | French: | ÉCRAN TACTILE MULTIPOINTS | [2016/51] | Examination procedure | 25.07.2016 | Examination requested [2016/51] | 25.07.2016 | Date on which the examining division has become responsible | 19.06.2017 | Amendment by applicant (claims and/or description) | 18.08.2017 | Communication of intention to grant the patent | 21.12.2017 | Fee for grant paid | 21.12.2017 | Fee for publishing/printing paid | 21.12.2017 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP05742343.6 / EP1745356 | Opposition(s) | 08.11.2018 | No opposition filed within time limit [2019/03] | Fees paid | Renewal fee | 25.07.2016 | Renewal fee patent year 03 | 25.07.2016 | Renewal fee patent year 04 | 25.07.2016 | Renewal fee patent year 05 | 25.07.2016 | Renewal fee patent year 06 | 25.07.2016 | Renewal fee patent year 07 | 25.07.2016 | Renewal fee patent year 08 | 25.07.2016 | Renewal fee patent year 09 | 25.07.2016 | Renewal fee patent year 10 | 25.07.2016 | Renewal fee patent year 11 | 25.07.2016 | Renewal fee patent year 12 | 10.04.2017 | Renewal fee patent year 13 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 26.04.2005 | AT | 07.02.2018 | CY | 07.02.2018 | CZ | 07.02.2018 | DK | 07.02.2018 | EE | 07.02.2018 | ES | 07.02.2018 | FI | 07.02.2018 | IT | 07.02.2018 | LT | 07.02.2018 | MC | 07.02.2018 | NL | 07.02.2018 | PL | 07.02.2018 | PT | 07.02.2018 | RO | 07.02.2018 | SE | 07.02.2018 | SI | 07.02.2018 | SK | 07.02.2018 | TR | 07.02.2018 | IE | 26.04.2018 | LU | 26.04.2018 | BE | 30.04.2018 | CH | 30.04.2018 | FR | 30.04.2018 | LI | 30.04.2018 | BG | 07.05.2018 | GB | 07.05.2018 | GR | 08.05.2018 | IS | 07.06.2018 | [2020/30] |
Former [2020/28] | AT | 07.02.2018 | |
CY | 07.02.2018 | ||
CZ | 07.02.2018 | ||
DK | 07.02.2018 | ||
EE | 07.02.2018 | ||
ES | 07.02.2018 | ||
FI | 07.02.2018 | ||
IT | 07.02.2018 | ||
LT | 07.02.2018 | ||
MC | 07.02.2018 | ||
NL | 07.02.2018 | ||
PL | 07.02.2018 | ||
PT | 07.02.2018 | ||
SE | 07.02.2018 | ||
SI | 07.02.2018 | ||
SK | 07.02.2018 | ||
TR | 07.02.2018 | ||
IE | 26.04.2018 | ||
LU | 26.04.2018 | ||
BE | 30.04.2018 | ||
CH | 30.04.2018 | ||
FR | 30.04.2018 | ||
LI | 30.04.2018 | ||
BG | 07.05.2018 | ||
GB | 07.05.2018 | ||
GR | 08.05.2018 | ||
IS | 07.06.2018 | ||
Former [2020/16] | AT | 07.02.2018 | |
CY | 07.02.2018 | ||
CZ | 07.02.2018 | ||
DK | 07.02.2018 | ||
EE | 07.02.2018 | ||
ES | 07.02.2018 | ||
FI | 07.02.2018 | ||
IT | 07.02.2018 | ||
LT | 07.02.2018 | ||
MC | 07.02.2018 | ||
NL | 07.02.2018 | ||
PL | 07.02.2018 | ||
SE | 07.02.2018 | ||
SI | 07.02.2018 | ||
SK | 07.02.2018 | ||
TR | 07.02.2018 | ||
IE | 26.04.2018 | ||
LU | 26.04.2018 | ||
BE | 30.04.2018 | ||
CH | 30.04.2018 | ||
FR | 30.04.2018 | ||
LI | 30.04.2018 | ||
BG | 07.05.2018 | ||
GB | 07.05.2018 | ||
GR | 08.05.2018 | ||
IS | 07.06.2018 | ||
Former [2019/23] | AT | 07.02.2018 | |
CY | 07.02.2018 | ||
CZ | 07.02.2018 | ||
DK | 07.02.2018 | ||
EE | 07.02.2018 | ||
ES | 07.02.2018 | ||
FI | 07.02.2018 | ||
IT | 07.02.2018 | ||
LT | 07.02.2018 | ||
MC | 07.02.2018 | ||
NL | 07.02.2018 | ||
PL | 07.02.2018 | ||
SE | 07.02.2018 | ||
SI | 07.02.2018 | ||
SK | 07.02.2018 | ||
IE | 26.04.2018 | ||
LU | 26.04.2018 | ||
BE | 30.04.2018 | ||
CH | 30.04.2018 | ||
FR | 30.04.2018 | ||
LI | 30.04.2018 | ||
BG | 07.05.2018 | ||
GB | 07.05.2018 | ||
GR | 08.05.2018 | ||
IS | 07.06.2018 | ||
Former [2019/21] | AT | 07.02.2018 | |
CY | 07.02.2018 | ||
CZ | 07.02.2018 | ||
DK | 07.02.2018 | ||
EE | 07.02.2018 | ||
ES | 07.02.2018 | ||
FI | 07.02.2018 | ||
IT | 07.02.2018 | ||
LT | 07.02.2018 | ||
MC | 07.02.2018 | ||
NL | 07.02.2018 | ||
PL | 07.02.2018 | ||
SE | 07.02.2018 | ||
SI | 07.02.2018 | ||
SK | 07.02.2018 | ||
IE | 26.04.2018 | ||
LU | 26.04.2018 | ||
BE | 30.04.2018 | ||
CH | 30.04.2018 | ||
LI | 30.04.2018 | ||
BG | 07.05.2018 | ||
GB | 07.05.2018 | ||
GR | 08.05.2018 | ||
IS | 07.06.2018 | ||
Former [2019/19] | AT | 07.02.2018 | |
CY | 07.02.2018 | ||
CZ | 07.02.2018 | ||
DK | 07.02.2018 | ||
EE | 07.02.2018 | ||
ES | 07.02.2018 | ||
FI | 07.02.2018 | ||
IT | 07.02.2018 | ||
LT | 07.02.2018 | ||
MC | 07.02.2018 | ||
NL | 07.02.2018 | ||
PL | 07.02.2018 | ||
SE | 07.02.2018 | ||
SI | 07.02.2018 | ||
SK | 07.02.2018 | ||
IE | 26.04.2018 | ||
LU | 26.04.2018 | ||
BE | 30.04.2018 | ||
CH | 30.04.2018 | ||
LI | 30.04.2018 | ||
BG | 07.05.2018 | ||
GR | 08.05.2018 | ||
IS | 07.06.2018 | ||
Former [2019/12] | AT | 07.02.2018 | |
CY | 07.02.2018 | ||
CZ | 07.02.2018 | ||
DK | 07.02.2018 | ||
EE | 07.02.2018 | ||
ES | 07.02.2018 | ||
FI | 07.02.2018 | ||
IT | 07.02.2018 | ||
LT | 07.02.2018 | ||
MC | 07.02.2018 | ||
NL | 07.02.2018 | ||
PL | 07.02.2018 | ||
SE | 07.02.2018 | ||
SI | 07.02.2018 | ||
SK | 07.02.2018 | ||
LU | 26.04.2018 | ||
BE | 30.04.2018 | ||
CH | 30.04.2018 | ||
LI | 30.04.2018 | ||
BG | 07.05.2018 | ||
GR | 08.05.2018 | ||
IS | 07.06.2018 | ||
Former [2019/08] | AT | 07.02.2018 | |
CY | 07.02.2018 | ||
CZ | 07.02.2018 | ||
DK | 07.02.2018 | ||
EE | 07.02.2018 | ||
ES | 07.02.2018 | ||
FI | 07.02.2018 | ||
IT | 07.02.2018 | ||
LT | 07.02.2018 | ||
MC | 07.02.2018 | ||
NL | 07.02.2018 | ||
PL | 07.02.2018 | ||
SE | 07.02.2018 | ||
SK | 07.02.2018 | ||
LU | 26.04.2018 | ||
BG | 07.05.2018 | ||
GR | 08.05.2018 | ||
IS | 07.06.2018 | ||
Former [2018/52] | AT | 07.02.2018 | |
CY | 07.02.2018 | ||
CZ | 07.02.2018 | ||
DK | 07.02.2018 | ||
EE | 07.02.2018 | ||
ES | 07.02.2018 | ||
FI | 07.02.2018 | ||
IT | 07.02.2018 | ||
LT | 07.02.2018 | ||
MC | 07.02.2018 | ||
NL | 07.02.2018 | ||
PL | 07.02.2018 | ||
SE | 07.02.2018 | ||
SK | 07.02.2018 | ||
BG | 07.05.2018 | ||
GR | 08.05.2018 | ||
IS | 07.06.2018 | ||
Former [2018/51] | AT | 07.02.2018 | |
CY | 07.02.2018 | ||
CZ | 07.02.2018 | ||
DK | 07.02.2018 | ||
EE | 07.02.2018 | ||
ES | 07.02.2018 | ||
FI | 07.02.2018 | ||
IT | 07.02.2018 | ||
LT | 07.02.2018 | ||
NL | 07.02.2018 | ||
PL | 07.02.2018 | ||
SE | 07.02.2018 | ||
SK | 07.02.2018 | ||
BG | 07.05.2018 | ||
GR | 08.05.2018 | ||
IS | 07.06.2018 | ||
Former [2018/50] | AT | 07.02.2018 | |
CY | 07.02.2018 | ||
CZ | 07.02.2018 | ||
EE | 07.02.2018 | ||
ES | 07.02.2018 | ||
FI | 07.02.2018 | ||
IT | 07.02.2018 | ||
LT | 07.02.2018 | ||
NL | 07.02.2018 | ||
PL | 07.02.2018 | ||
SE | 07.02.2018 | ||
SK | 07.02.2018 | ||
BG | 07.05.2018 | ||
GR | 08.05.2018 | ||
IS | 07.06.2018 | ||
Former [2018/47] | AT | 07.02.2018 | |
CY | 07.02.2018 | ||
ES | 07.02.2018 | ||
FI | 07.02.2018 | ||
IT | 07.02.2018 | ||
LT | 07.02.2018 | ||
NL | 07.02.2018 | ||
PL | 07.02.2018 | ||
SE | 07.02.2018 | ||
BG | 07.05.2018 | ||
GR | 08.05.2018 | ||
IS | 07.06.2018 | ||
Former [2018/40] | AT | 07.02.2018 | |
CY | 07.02.2018 | ||
ES | 07.02.2018 | ||
FI | 07.02.2018 | ||
LT | 07.02.2018 | ||
NL | 07.02.2018 | ||
PL | 07.02.2018 | ||
SE | 07.02.2018 | ||
BG | 07.05.2018 | ||
GR | 08.05.2018 | ||
IS | 07.06.2018 | ||
Former [2018/39] | AT | 07.02.2018 | |
CY | 07.02.2018 | ||
ES | 07.02.2018 | ||
FI | 07.02.2018 | ||
LT | 07.02.2018 | ||
NL | 07.02.2018 | ||
PL | 07.02.2018 | ||
SE | 07.02.2018 | ||
GR | 08.05.2018 | ||
IS | 07.06.2018 | ||
Former [2018/37] | CY | 07.02.2018 | |
ES | 07.02.2018 | ||
FI | 07.02.2018 | ||
LT | 07.02.2018 | ||
NL | 07.02.2018 | ||
PL | 07.02.2018 | ||
GR | 08.05.2018 | ||
Former [2018/36] | CY | 07.02.2018 | |
ES | 07.02.2018 | ||
FI | 07.02.2018 | ||
LT | 07.02.2018 | ||
NL | 07.02.2018 | ||
PL | 07.02.2018 | ||
Former [2018/35] | CY | 07.02.2018 | |
FI | 07.02.2018 | ||
LT | 07.02.2018 | ||
NL | 07.02.2018 | Documents cited: | Search | [A]EP0250931 (IBM [US]) [A] 1-15 * column 5, line 49 - column 7, line 4; figures 1-2,12-14 *; | [A]US5459463 (GRUAZ DANIEL [FR], et al) [A] 5* figure 2 *; | [A]US5825352 (BISSET STEPHEN J [US], et al) [A] 1-15 * column 2, line 18 - column 5, line 42 * * column 12, line 14 - column 13, line 37; figures 2,7; claims 1,18,20 *; | [I] - REKIMOTO J ED - TERVEEN L ET AL, "SMARTSKIN: AN INFRASTRUCTURE FOR FREEHAND MANIPULATION ON INTERACTIVE SURFACES", CHI 2002 CONFERENCE PROCEEDINGS. CONFERENCE ON HUMAN FACTORS IN COMPUTING SYSTEMS. MINNEAPOLIS, MN, APRIL 20 - 25, 2002; [CHI CONFERENCE PROCEEDINGS. HUMAN FACTORS IN COMPUTING SYSTEMS], NEW YORK, NY : ACM, US, (20020420), doi:10.1145/503376.503397, ISBN 978-1-58113-453-7, pages 113 - 120, XP001099406 [I] 1-15 * the whole document * DOI: http://dx.doi.org/10.1145/503376.503397 | [AP] - Prabhu, "Op-amp Integrator", (201307), Electronics, URL: http://diodetech.blogspot.nl/2013/07/op-amp-integrator.html, (20160829), XP002761182 [AP] 2,12 * the whole document * |