EP3135975 - CABLE TIE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 24.06.2022 Database last updated on 16.07.2024 | |
Former | The patent has been granted Status updated on 16.07.2021 | ||
Former | Grant of patent is intended Status updated on 25.02.2021 | ||
Former | Examination is in progress Status updated on 21.06.2019 | ||
Former | Request for examination was made Status updated on 04.08.2017 | ||
Former | The application has been published Status updated on 27.01.2017 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states DAIWA KASEI KOGYO KABUSHIKI KAISHA 1, Aza Kamihirachi, Hobo-cho Okazaki-shi Aichi-ken / JP | [2017/09] | Inventor(s) | 01 /
KATO, Makoto DAIWA KASEI KOGYO KABUSHIKI KAISHA 1, Aza Kamihirachi Hobo-cho Okazaki-shi Aichi-ken / JP | 02 /
HIRAKAWA, Katsuya DAIWA KASEI KOGYO KABUSHIKI KAISHA 1, Aza Kamihirachi Hobo-cho Okazaki-shi Aichi-ken / JP | [2017/09] | Representative(s) | Maikowski & Ninnemann Patentanwälte Partnerschaft mbB Postfach 15 09 20 10671 Berlin / DE | [2017/09] | Application number, filing date | 16181209.4 | 26.07.2016 | [2017/09] | Priority number, date | JP20150165925 | 25.08.2015 Original published format: JP 2015165925 | [2017/09] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3135975 | Date: | 01.03.2017 | Language: | EN | [2017/09] | Type: | B1 Patent specification | No.: | EP3135975 | Date: | 18.08.2021 | Language: | EN | [2021/33] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 27.01.2017 | Classification | IPC: | F16L33/08, B60R16/02 | [2017/09] | CPC: |
B60R16/0215 (EP,US);
B65D63/16 (CN);
B65D63/1072 (US);
B65D2563/103 (CN);
B65D2563/108 (US);
F16L3/137 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/36] |
Former [2017/09] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | KABELBINDER | [2017/09] | English: | CABLE TIE | [2017/09] | French: | ATTACHE DE CABLE | [2017/09] | Examination procedure | 26.07.2016 | Date on which the examining division has become responsible | 01.08.2017 | Amendment by applicant (claims and/or description) | 01.08.2017 | Examination requested [2017/36] | 26.06.2019 | Despatch of a communication from the examining division (Time limit: M04) | 26.09.2019 | Reply to a communication from the examining division | 29.05.2020 | Despatch of a communication from the examining division (Time limit: M06) | 02.10.2020 | Reply to a communication from the examining division | 26.02.2021 | Communication of intention to grant the patent | 28.06.2021 | Fee for grant paid | 28.06.2021 | Fee for publishing/printing paid | 28.06.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 19.05.2022 | No opposition filed within time limit [2022/30] | Fees paid | Renewal fee | 05.06.2018 | Renewal fee patent year 03 | 20.06.2019 | Renewal fee patent year 04 | 17.07.2020 | Renewal fee patent year 05 | 09.07.2021 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 26.07.2016 | AL | 18.08.2021 | AT | 18.08.2021 | CY | 18.08.2021 | CZ | 18.08.2021 | DK | 18.08.2021 | EE | 18.08.2021 | ES | 18.08.2021 | FI | 18.08.2021 | HR | 18.08.2021 | IT | 18.08.2021 | LT | 18.08.2021 | LV | 18.08.2021 | MC | 18.08.2021 | MK | 18.08.2021 | NL | 18.08.2021 | PL | 18.08.2021 | RO | 18.08.2021 | RS | 18.08.2021 | SE | 18.08.2021 | SI | 18.08.2021 | SK | 18.08.2021 | SM | 18.08.2021 | TR | 18.08.2021 | BG | 18.11.2021 | NO | 18.11.2021 | GR | 19.11.2021 | IS | 18.12.2021 | PT | 20.12.2021 | [2024/29] |
Former [2024/22] | HU | 26.07.2016 | |
AL | 18.08.2021 | ||
AT | 18.08.2021 | ||
CY | 18.08.2021 | ||
CZ | 18.08.2021 | ||
DK | 18.08.2021 | ||
EE | 18.08.2021 | ||
ES | 18.08.2021 | ||
FI | 18.08.2021 | ||
HR | 18.08.2021 | ||
IT | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
MC | 18.08.2021 | ||
MK | 18.08.2021 | ||
NL | 18.08.2021 | ||
PL | 18.08.2021 | ||
RO | 18.08.2021 | ||
RS | 18.08.2021 | ||
SE | 18.08.2021 | ||
SI | 18.08.2021 | ||
SK | 18.08.2021 | ||
SM | 18.08.2021 | ||
BG | 18.11.2021 | ||
NO | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
Former [2024/20] | HU | 26.07.2016 | |
AL | 18.08.2021 | ||
AT | 18.08.2021 | ||
CY | 18.08.2021 | ||
CZ | 18.08.2021 | ||
DK | 18.08.2021 | ||
EE | 18.08.2021 | ||
ES | 18.08.2021 | ||
FI | 18.08.2021 | ||
HR | 18.08.2021 | ||
IT | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
MC | 18.08.2021 | ||
NL | 18.08.2021 | ||
PL | 18.08.2021 | ||
RO | 18.08.2021 | ||
RS | 18.08.2021 | ||
SE | 18.08.2021 | ||
SI | 18.08.2021 | ||
SK | 18.08.2021 | ||
SM | 18.08.2021 | ||
BG | 18.11.2021 | ||
NO | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
Former [2024/18] | HU | 26.07.2016 | |
AL | 18.08.2021 | ||
AT | 18.08.2021 | ||
CZ | 18.08.2021 | ||
DK | 18.08.2021 | ||
EE | 18.08.2021 | ||
ES | 18.08.2021 | ||
FI | 18.08.2021 | ||
HR | 18.08.2021 | ||
IT | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
MC | 18.08.2021 | ||
NL | 18.08.2021 | ||
PL | 18.08.2021 | ||
RO | 18.08.2021 | ||
RS | 18.08.2021 | ||
SE | 18.08.2021 | ||
SI | 18.08.2021 | ||
SK | 18.08.2021 | ||
SM | 18.08.2021 | ||
BG | 18.11.2021 | ||
NO | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
Former [2023/11] | AL | 18.08.2021 | |
AT | 18.08.2021 | ||
CZ | 18.08.2021 | ||
DK | 18.08.2021 | ||
EE | 18.08.2021 | ||
ES | 18.08.2021 | ||
FI | 18.08.2021 | ||
HR | 18.08.2021 | ||
IT | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
MC | 18.08.2021 | ||
NL | 18.08.2021 | ||
PL | 18.08.2021 | ||
RO | 18.08.2021 | ||
RS | 18.08.2021 | ||
SE | 18.08.2021 | ||
SI | 18.08.2021 | ||
SK | 18.08.2021 | ||
SM | 18.08.2021 | ||
BG | 18.11.2021 | ||
NO | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
Former [2022/36] | AL | 18.08.2021 | |
AT | 18.08.2021 | ||
CZ | 18.08.2021 | ||
DK | 18.08.2021 | ||
EE | 18.08.2021 | ||
ES | 18.08.2021 | ||
FI | 18.08.2021 | ||
HR | 18.08.2021 | ||
IT | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
NL | 18.08.2021 | ||
PL | 18.08.2021 | ||
RO | 18.08.2021 | ||
RS | 18.08.2021 | ||
SE | 18.08.2021 | ||
SI | 18.08.2021 | ||
SK | 18.08.2021 | ||
SM | 18.08.2021 | ||
BG | 18.11.2021 | ||
NO | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
Former [2022/29] | AL | 18.08.2021 | |
AT | 18.08.2021 | ||
CZ | 18.08.2021 | ||
DK | 18.08.2021 | ||
EE | 18.08.2021 | ||
ES | 18.08.2021 | ||
FI | 18.08.2021 | ||
HR | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
NL | 18.08.2021 | ||
PL | 18.08.2021 | ||
RO | 18.08.2021 | ||
RS | 18.08.2021 | ||
SE | 18.08.2021 | ||
SK | 18.08.2021 | ||
SM | 18.08.2021 | ||
BG | 18.11.2021 | ||
NO | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
Former [2022/26] | AT | 18.08.2021 | |
CZ | 18.08.2021 | ||
DK | 18.08.2021 | ||
EE | 18.08.2021 | ||
ES | 18.08.2021 | ||
FI | 18.08.2021 | ||
HR | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
NL | 18.08.2021 | ||
PL | 18.08.2021 | ||
RO | 18.08.2021 | ||
RS | 18.08.2021 | ||
SE | 18.08.2021 | ||
SK | 18.08.2021 | ||
SM | 18.08.2021 | ||
BG | 18.11.2021 | ||
NO | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
Former [2022/24] | AT | 18.08.2021 | |
CZ | 18.08.2021 | ||
DK | 18.08.2021 | ||
EE | 18.08.2021 | ||
ES | 18.08.2021 | ||
FI | 18.08.2021 | ||
HR | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
NL | 18.08.2021 | ||
PL | 18.08.2021 | ||
RO | 18.08.2021 | ||
RS | 18.08.2021 | ||
SE | 18.08.2021 | ||
SK | 18.08.2021 | ||
BG | 18.11.2021 | ||
NO | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
Former [2022/16] | AT | 18.08.2021 | |
DK | 18.08.2021 | ||
ES | 18.08.2021 | ||
FI | 18.08.2021 | ||
HR | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
NL | 18.08.2021 | ||
PL | 18.08.2021 | ||
RS | 18.08.2021 | ||
SE | 18.08.2021 | ||
BG | 18.11.2021 | ||
NO | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
Former [2022/10] | AT | 18.08.2021 | |
ES | 18.08.2021 | ||
FI | 18.08.2021 | ||
HR | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
PL | 18.08.2021 | ||
RS | 18.08.2021 | ||
SE | 18.08.2021 | ||
BG | 18.11.2021 | ||
NO | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
Former [2022/09] | AT | 18.08.2021 | |
ES | 18.08.2021 | ||
FI | 18.08.2021 | ||
LT | 18.08.2021 | ||
RS | 18.08.2021 | ||
SE | 18.08.2021 | ||
BG | 18.11.2021 | ||
NO | 18.11.2021 | ||
PT | 20.12.2021 | ||
Former [2022/08] | AT | 18.08.2021 | |
ES | 18.08.2021 | ||
FI | 18.08.2021 | ||
LT | 18.08.2021 | ||
SE | 18.08.2021 | ||
BG | 18.11.2021 | ||
NO | 18.11.2021 | ||
Former [2022/07] | AT | 18.08.2021 | |
LT | 18.08.2021 | ||
NO | 18.11.2021 | Documents cited: | Search | [X]DE2128086 (ALL STATES PLASTIC MANUFACTURING CO, INC) [X] 1-3 * page 3 - page 5 * * figures 1-6 *; | [X]DE3232972 (KLEINHUIS HERMANN GMBH [DE]) [X] 1-3 * page 7, line 16 - page 10, line 22 * * figures 1-6 *; | [X]US2006162130 (COOK NORMAND [CA]) [X] 1-3 * figures 1-6 * * paragraph [0015] - paragraph [0024] *; | [XD]EP2397420 (NEWFREY LLC [US]) [XD] 1-3* the whole document * | Examination | JP2000287341 | by applicant | JP5478374B |