blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3141406

EP3141406 - TRAILER COUPLING [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  12.02.2021
Database last updated on 30.07.2024
FormerThe patent has been granted
Status updated on  21.02.2020
FormerGrant of patent is intended
Status updated on  03.12.2019
FormerRequest for examination was made
Status updated on  11.11.2019
FormerGrant of patent is intended
Status updated on  27.06.2019
FormerRequest for examination was made
Status updated on  01.09.2017
FormerThe application has been published
Status updated on  10.02.2017
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
ACPS Automotive GmbH
Steinbeisstrasse 6
71706 Markgröningen / DE
[2019/41]
Former [2018/02]For all designated states
Bosal ACPS Holding 2 B.V.
Kamerlingh Onnesweg 5
4131 PK Vianen / NL
Former [2017/11]For all designated states
Scambia Holdings Cyprus Limited
17 Gr. Xenopoulou Street
3106 Limassol / CY
Inventor(s)01 / Kadnikov, Aleksej
Neuköllner Strasse 9
71229 Leonberg / DE
02 / Gentner, Wolfgang
Ziegeläckerstrasse 23
71711 Steinheim / DE
03 / Rimmelspacher, Bernhard
Gartenstrasse 11
76287 Rheinstetten / DE
 [2017/11]
Representative(s)Hoeger, Stellrecht & Partner Patentanwälte mbB
Uhlandstrasse 14c
70182 Stuttgart / DE
[2017/11]
Application number, filing date16187841.808.09.2016
[2017/11]
Priority number, dateDE20151011535711.09.2015         Original published format: DE102015115357
[2017/11]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3141406
Date:15.03.2017
Language:DE
[2017/11]
Type: B1 Patent specification 
No.:EP3141406
Date:25.03.2020
Language:DE
[2020/13]
Search report(s)(Supplementary) European search report - dispatched on:EP27.01.2017
ClassificationIPC:B60D1/06, B60D1/62, B60D1/54
[2019/28]
CPC:
B60D1/06 (EP,US); B60D1/065 (US); B60D1/246 (US);
B60D1/44 (US); B60D1/46 (US); B60D1/54 (EP,US);
B60D1/62 (EP,US) (-)
Former IPC [2017/11]B60D1/54, B60D1/06
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/40]
Former [2017/11]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:ANHÄNGEKUPPLUNG[2017/11]
English:TRAILER COUPLING[2017/11]
French:ATTELAGE[2017/11]
Examination procedure08.09.2016Date on which the examining division has become responsible
24.08.2017Amendment by applicant (claims and/or description)
24.08.2017Examination requested  [2017/40]
28.06.2019Communication of intention to grant the patent
07.11.2019Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
07.11.2019Fee for grant paid
07.11.2019Fee for publishing/printing paid
04.12.2019Communication of intention to grant the patent
12.02.2020Receipt of the translation of the claim(s)
Opposition(s)12.01.2021No opposition filed within time limit [2021/11]
Fees paidRenewal fee
25.09.2018Renewal fee patent year 03
24.09.2019Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU08.09.2016
AL25.03.2020
CY25.03.2020
DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
MC25.03.2020
MK25.03.2020
MT25.03.2020
PL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SI25.03.2020
SK25.03.2020
SM25.03.2020
TR25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
IE08.09.2020
LU08.09.2020
BE30.09.2020
CH30.09.2020
LI30.09.2020
[2022/31]
Former [2022/30]HU08.09.2016
AL25.03.2020
CY25.03.2020
DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
MC25.03.2020
MT25.03.2020
PL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SI25.03.2020
SK25.03.2020
SM25.03.2020
TR25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
IE08.09.2020
LU08.09.2020
BE30.09.2020
CH30.09.2020
LI30.09.2020
Former [2022/27]HU08.09.2016
CY25.03.2020
DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
MC25.03.2020
MT25.03.2020
PL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SI25.03.2020
SK25.03.2020
SM25.03.2020
TR25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
IE08.09.2020
LU08.09.2020
BE30.09.2020
CH30.09.2020
LI30.09.2020
Former [2021/37]DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
MC25.03.2020
PL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SI25.03.2020
SK25.03.2020
SM25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
IE08.09.2020
LU08.09.2020
BE30.09.2020
CH30.09.2020
LI30.09.2020
Former [2021/36]DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
MC25.03.2020
PL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SI25.03.2020
SK25.03.2020
SM25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
LU08.09.2020
BE30.09.2020
Former [2021/27]DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
MC25.03.2020
PL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SI25.03.2020
SK25.03.2020
SM25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
LU08.09.2020
Former [2021/23]DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
MC25.03.2020
PL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SI25.03.2020
SK25.03.2020
SM25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
Former [2021/10]DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
PL25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SK25.03.2020
SM25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
Former [2021/09]DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
IT25.03.2020
LT25.03.2020
LV25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SK25.03.2020
SM25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
Former [2021/08]DK25.03.2020
EE25.03.2020
ES25.03.2020
FI25.03.2020
HR25.03.2020
LT25.03.2020
LV25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SK25.03.2020
SM25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
Former [2020/50]EE25.03.2020
FI25.03.2020
HR25.03.2020
LT25.03.2020
LV25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SK25.03.2020
SM25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
Former [2020/49]FI25.03.2020
HR25.03.2020
LT25.03.2020
LV25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SK25.03.2020
SM25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
Former [2020/48]FI25.03.2020
HR25.03.2020
LT25.03.2020
LV25.03.2020
RO25.03.2020
RS25.03.2020
SE25.03.2020
SM25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
PT18.08.2020
Former [2020/47]FI25.03.2020
HR25.03.2020
LT25.03.2020
LV25.03.2020
RS25.03.2020
SE25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
Former [2020/46]FI25.03.2020
HR25.03.2020
LV25.03.2020
RS25.03.2020
SE25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
IS25.07.2020
Former [2020/39]FI25.03.2020
HR25.03.2020
LV25.03.2020
RS25.03.2020
SE25.03.2020
BG25.06.2020
NO25.06.2020
GR26.06.2020
Former [2020/38]FI25.03.2020
HR25.03.2020
LV25.03.2020
RS25.03.2020
SE25.03.2020
NO25.06.2020
GR26.06.2020
Former [2020/37]FI25.03.2020
HR25.03.2020
LV25.03.2020
RS25.03.2020
SE25.03.2020
NO25.06.2020
Former [2020/35]FI25.03.2020
NO25.06.2020
Documents cited:Search[A]DE19858978  (DAIMLER CHRYSLER AG [DE]) [A] 1* figures 1,2 *;
 [X]EP2266820  (SCAMBIA IND DEV AG [LI]) [X] 1-15 * paragraphs [0121] , [0122] , [0126] - [0128] - [0143] , [0144] , [0147] , [0148] , [0154] - [0166] - [0192] - [0195] * * paragraphs [0198] - [0206] - [0211] - [0219] * * figures 25,26,27,28,29 *
by applicantEP1741572
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.