| EP3141106 - OPERATION AND CONTROL OF BOTTOM FLOOR ASSEMBLY [Right-click to bookmark this link] | Status | Patent maintained as amended Status updated on 04.08.2023 Database last updated on 28.02.2026 | |
| Former | The patent has been granted Status updated on 06.03.2020 | ||
| Former | Grant of patent is intended Status updated on 30.10.2019 | ||
| Former | Request for examination was made Status updated on 25.09.2019 | ||
| Former | Grant of patent is intended Status updated on 30.05.2019 | ||
| Former | Request for examination was made Status updated on 22.09.2017 | ||
| Former | The application has been published Status updated on 10.02.2017 | Most recent event Tooltip | 04.08.2023 | Patent maintained (B2 publication) | published on 06.09.2023 [2023/36] | Applicant(s) | For all designated states CNH Industrial Belgium nv Leon Claeysstraat 3A 8210 Zedelgem / BE | [2023/36] |
| Former [2017/11] | For all designated states CNH Industrial Belgium nv Leon Claeysstraat 3A 8210 Zedelgem / BE | Inventor(s) | 01 /
Brewer, Carl 17 Echo Valley Dr. Ephrata, PA 17522 / US | 02 /
Chow, Mark K. 1903 Glenwold Drive Paoli, PA 19301 / US | 03 /
McClure, John R. 115 Skyline Drive New Holland, PA 17557 / US | 04 /
Singh, Chandrashekhar 122 Foal Court Lancaster, PA 17602 / US | [2017/11] | Representative(s) | CNH Industrial IP Department Leon Claeysstraat 3A 8210 Zedelgem / BE | [2023/36] |
| Former [2017/11] | CNH Industrial IP Department Patent Department Leon Claeysstraat 3A 8210 Zedelgem / BE | Application number, filing date | 16188220.4 | 09.09.2016 | [2017/11] | Priority number, date | US201514850087 | 10.09.2015 Original published format: US201514850087 | [2017/11] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3141106 | Date: | 15.03.2017 | Language: | EN | [2017/11] | Type: | B1 Patent specification | No.: | EP3141106 | Date: | 08.04.2020 | Language: | EN | [2020/15] | Type: | B2 New European patent specification | No.: | EP3141106 | Date: | 06.09.2023 | Language: | EN | [2023/36] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 07.02.2017 | Classification | IPC: | A01F15/10 | [2017/11] | CPC: |
A01F15/10 (EP,US);
A01F15/08 (US);
A01F15/07 (US);
A01F15/18 (US);
A01F2015/107 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/43] |
| Former [2017/11] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | BETRIEB UND STEUERUNG EINER BODENANORDNUNG | [2017/11] | English: | OPERATION AND CONTROL OF BOTTOM FLOOR ASSEMBLY | [2017/11] | French: | FONCTIONNEMENT ET COMMANDE D'UN ENSEMBLE DE PLANCHER INFERIEUR | [2019/45] |
| Former [2017/11] | FONCTIONNEMENT ET COMMANDE D'UN ENSEMBLE DE PLANCHER INFERIEUR | Examination procedure | 09.09.2016 | Date on which the examining division has become responsible | 06.09.2017 | Amendment by applicant (claims and/or description) | 15.09.2017 | Examination requested [2017/43] | 31.05.2019 | Communication of intention to grant the patent | 24.09.2019 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 31.10.2019 | Communication of intention to grant the patent | 25.02.2020 | Fee for grant paid | 25.02.2020 | Fee for publishing/printing paid | 25.02.2020 | Receipt of the translation of the claim(s) | Opposition(s) | Opponent(s) | 01
07.01.2021
11.01.2021
ADMISSIBLE Maschinenfabrik Bernard Krone GmbH & Co. KG Heinrich-Krone-Straße 10 48480 Spelle / DE Opponent's representative Busse & Busse Patent- und Rechtsanwälte Partnerschaft mbB Postfach 1226 49002 Osnabrück / DE | [2022/45] |
| Former [2021/07] | |||
| Opponent(s) | 01
07.01.2021
11.01.2021
ADMISSIBLE Maschinenfabrik Bernard Krone GmbH & Co. KG Heinrich-Krone-Straße 10 48480 Spelle / DE | 23.11.2012 | Despatch of minutes of oral proceedings | 22.01.2021 | Invitation to proprietor to file observations on the notice of opposition | 31.05.2021 | Reply of patent proprietor to notice(s) of opposition | 18.10.2022 | Legal effect of interlocutory decision in opposition | 18.10.2022 | Date of oral proceedings | 23.11.2022 | Despatch of interlocutory decision in opposition | 02.05.2023 | Despatch of communication that the patent will be maintained as amended | 27.07.2023 | Fee for printing new specification paid | Fees paid | Renewal fee | 01.10.2018 | Renewal fee patent year 03 | 30.09.2019 | Renewal fee patent year 04 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 09.09.2016 | AL | 08.04.2020 | AT | 08.04.2020 | CY | 08.04.2020 | CZ | 08.04.2020 | DK | 08.04.2020 | EE | 08.04.2020 | ES | 08.04.2020 | FI | 08.04.2020 | HR | 08.04.2020 | LT | 08.04.2020 | LV | 08.04.2020 | MC | 08.04.2020 | MK | 08.04.2020 | MT | 08.04.2020 | NL | 08.04.2020 | PL | 08.04.2020 | RO | 08.04.2020 | RS | 08.04.2020 | SE | 08.04.2020 | SI | 08.04.2020 | SK | 08.04.2020 | SM | 08.04.2020 | TR | 08.04.2020 | BG | 08.07.2020 | NO | 08.07.2020 | GR | 09.07.2020 | IS | 08.08.2020 | PT | 17.08.2020 | IE | 09.09.2020 | LU | 09.09.2020 | BE | 30.09.2020 | CH | 30.09.2020 | LI | 30.09.2020 | [2022/32] |
| Former [2022/27] | HU | 09.09.2016 | |
| AL | 08.04.2020 | ||
| AT | 08.04.2020 | ||
| CY | 08.04.2020 | ||
| CZ | 08.04.2020 | ||
| DK | 08.04.2020 | ||
| EE | 08.04.2020 | ||
| ES | 08.04.2020 | ||
| FI | 08.04.2020 | ||
| HR | 08.04.2020 | ||
| LT | 08.04.2020 | ||
| LV | 08.04.2020 | ||
| MC | 08.04.2020 | ||
| MT | 08.04.2020 | ||
| NL | 08.04.2020 | ||
| PL | 08.04.2020 | ||
| RO | 08.04.2020 | ||
| RS | 08.04.2020 | ||
| SE | 08.04.2020 | ||
| SI | 08.04.2020 | ||
| SK | 08.04.2020 | ||
| SM | 08.04.2020 | ||
| TR | 08.04.2020 | ||
| BG | 08.07.2020 | ||
| NO | 08.07.2020 | ||
| GR | 09.07.2020 | ||
| IS | 08.08.2020 | ||
| PT | 17.08.2020 | ||
| IE | 09.09.2020 | ||
| LU | 09.09.2020 | ||
| BE | 30.09.2020 | ||
| CH | 30.09.2020 | ||
| LI | 30.09.2020 | ||
| Former [2021/37] | AL | 08.04.2020 | |
| AT | 08.04.2020 | ||
| CZ | 08.04.2020 | ||
| DK | 08.04.2020 | ||
| EE | 08.04.2020 | ||
| ES | 08.04.2020 | ||
| FI | 08.04.2020 | ||
| HR | 08.04.2020 | ||
| LT | 08.04.2020 | ||
| LV | 08.04.2020 | ||
| MC | 08.04.2020 | ||
| NL | 08.04.2020 | ||
| PL | 08.04.2020 | ||
| RO | 08.04.2020 | ||
| RS | 08.04.2020 | ||
| SE | 08.04.2020 | ||
| SI | 08.04.2020 | ||
| SK | 08.04.2020 | ||
| SM | 08.04.2020 | ||
| BG | 08.07.2020 | ||
| NO | 08.07.2020 | ||
| GR | 09.07.2020 | ||
| IS | 08.08.2020 | ||
| PT | 17.08.2020 | ||
| IE | 09.09.2020 | ||
| LU | 09.09.2020 | ||
| BE | 30.09.2020 | ||
| CH | 30.09.2020 | ||
| LI | 30.09.2020 | ||
| Former [2021/36] | AL | 08.04.2020 | |
| AT | 08.04.2020 | ||
| CZ | 08.04.2020 | ||
| DK | 08.04.2020 | ||
| EE | 08.04.2020 | ||
| ES | 08.04.2020 | ||
| FI | 08.04.2020 | ||
| HR | 08.04.2020 | ||
| LT | 08.04.2020 | ||
| LV | 08.04.2020 | ||
| MC | 08.04.2020 | ||
| NL | 08.04.2020 | ||
| PL | 08.04.2020 | ||
| RO | 08.04.2020 | ||
| RS | 08.04.2020 | ||
| SE | 08.04.2020 | ||
| SI | 08.04.2020 | ||
| SK | 08.04.2020 | ||
| SM | 08.04.2020 | ||
| BG | 08.07.2020 | ||
| NO | 08.07.2020 | ||
| GR | 09.07.2020 | ||
| IS | 08.08.2020 | ||
| PT | 17.08.2020 | ||
| LU | 09.09.2020 | ||
| BE | 30.09.2020 | ||
| Former [2021/27] | AL | 08.04.2020 | |
| AT | 08.04.2020 | ||
| CZ | 08.04.2020 | ||
| DK | 08.04.2020 | ||
| EE | 08.04.2020 | ||
| ES | 08.04.2020 | ||
| FI | 08.04.2020 | ||
| HR | 08.04.2020 | ||
| LT | 08.04.2020 | ||
| LV | 08.04.2020 | ||
| MC | 08.04.2020 | ||
| NL | 08.04.2020 | ||
| PL | 08.04.2020 | ||
| RO | 08.04.2020 | ||
| RS | 08.04.2020 | ||
| SE | 08.04.2020 | ||
| SI | 08.04.2020 | ||
| SK | 08.04.2020 | ||
| SM | 08.04.2020 | ||
| BG | 08.07.2020 | ||
| NO | 08.07.2020 | ||
| GR | 09.07.2020 | ||
| IS | 08.08.2020 | ||
| PT | 17.08.2020 | ||
| LU | 09.09.2020 | ||
| Former [2021/23] | AL | 08.04.2020 | |
| AT | 08.04.2020 | ||
| CZ | 08.04.2020 | ||
| DK | 08.04.2020 | ||
| EE | 08.04.2020 | ||
| ES | 08.04.2020 | ||
| FI | 08.04.2020 | ||
| HR | 08.04.2020 | ||
| LT | 08.04.2020 | ||
| LV | 08.04.2020 | ||
| MC | 08.04.2020 | ||
| NL | 08.04.2020 | ||
| PL | 08.04.2020 | ||
| RO | 08.04.2020 | ||
| RS | 08.04.2020 | ||
| SE | 08.04.2020 | ||
| SI | 08.04.2020 | ||
| SK | 08.04.2020 | ||
| SM | 08.04.2020 | ||
| BG | 08.07.2020 | ||
| NO | 08.07.2020 | ||
| GR | 09.07.2020 | ||
| IS | 08.08.2020 | ||
| PT | 17.08.2020 | ||
| Former [2021/10] | AL | 08.04.2020 | |
| AT | 08.04.2020 | ||
| CZ | 08.04.2020 | ||
| DK | 08.04.2020 | ||
| EE | 08.04.2020 | ||
| ES | 08.04.2020 | ||
| FI | 08.04.2020 | ||
| HR | 08.04.2020 | ||
| LT | 08.04.2020 | ||
| LV | 08.04.2020 | ||
| NL | 08.04.2020 | ||
| PL | 08.04.2020 | ||
| RO | 08.04.2020 | ||
| RS | 08.04.2020 | ||
| SE | 08.04.2020 | ||
| SK | 08.04.2020 | ||
| SM | 08.04.2020 | ||
| BG | 08.07.2020 | ||
| NO | 08.07.2020 | ||
| GR | 09.07.2020 | ||
| IS | 08.08.2020 | ||
| PT | 17.08.2020 | ||
| Former [2021/09] | AL | 08.04.2020 | |
| AT | 08.04.2020 | ||
| CZ | 08.04.2020 | ||
| DK | 08.04.2020 | ||
| EE | 08.04.2020 | ||
| ES | 08.04.2020 | ||
| FI | 08.04.2020 | ||
| HR | 08.04.2020 | ||
| LT | 08.04.2020 | ||
| LV | 08.04.2020 | ||
| NL | 08.04.2020 | ||
| RO | 08.04.2020 | ||
| RS | 08.04.2020 | ||
| SE | 08.04.2020 | ||
| SM | 08.04.2020 | ||
| BG | 08.07.2020 | ||
| NO | 08.07.2020 | ||
| GR | 09.07.2020 | ||
| IS | 08.08.2020 | ||
| PT | 17.08.2020 | ||
| Former [2021/08] | AL | 08.04.2020 | |
| DK | 08.04.2020 | ||
| ES | 08.04.2020 | ||
| FI | 08.04.2020 | ||
| HR | 08.04.2020 | ||
| LT | 08.04.2020 | ||
| LV | 08.04.2020 | ||
| NL | 08.04.2020 | ||
| RO | 08.04.2020 | ||
| RS | 08.04.2020 | ||
| SE | 08.04.2020 | ||
| SM | 08.04.2020 | ||
| BG | 08.07.2020 | ||
| NO | 08.07.2020 | ||
| GR | 09.07.2020 | ||
| IS | 08.08.2020 | ||
| PT | 17.08.2020 | ||
| Former [2021/04] | AL | 08.04.2020 | |
| FI | 08.04.2020 | ||
| HR | 08.04.2020 | ||
| LT | 08.04.2020 | ||
| LV | 08.04.2020 | ||
| NL | 08.04.2020 | ||
| RS | 08.04.2020 | ||
| SE | 08.04.2020 | ||
| BG | 08.07.2020 | ||
| NO | 08.07.2020 | ||
| GR | 09.07.2020 | ||
| IS | 08.08.2020 | ||
| PT | 17.08.2020 | ||
| Former [2021/01] | FI | 08.04.2020 | |
| HR | 08.04.2020 | ||
| LT | 08.04.2020 | ||
| LV | 08.04.2020 | ||
| NL | 08.04.2020 | ||
| RS | 08.04.2020 | ||
| SE | 08.04.2020 | ||
| BG | 08.07.2020 | ||
| NO | 08.07.2020 | ||
| GR | 09.07.2020 | ||
| IS | 08.08.2020 | ||
| PT | 17.08.2020 | ||
| Former [2020/51] | FI | 08.04.2020 | |
| HR | 08.04.2020 | ||
| LT | 08.04.2020 | ||
| LV | 08.04.2020 | ||
| NL | 08.04.2020 | ||
| RS | 08.04.2020 | ||
| SE | 08.04.2020 | ||
| NO | 08.07.2020 | ||
| GR | 09.07.2020 | ||
| IS | 08.08.2020 | ||
| PT | 17.08.2020 | ||
| Former [2020/50] | FI | 08.04.2020 | |
| HR | 08.04.2020 | ||
| LT | 08.04.2020 | ||
| LV | 08.04.2020 | ||
| NL | 08.04.2020 | ||
| SE | 08.04.2020 | ||
| NO | 08.07.2020 | ||
| GR | 09.07.2020 | ||
| IS | 08.08.2020 | ||
| PT | 17.08.2020 | ||
| Former [2020/48] | FI | 08.04.2020 | |
| LT | 08.04.2020 | ||
| NL | 08.04.2020 | ||
| SE | 08.04.2020 | ||
| NO | 08.07.2020 | ||
| IS | 08.08.2020 | ||
| PT | 17.08.2020 | ||
| Former [2020/47] | LT | 08.04.2020 | |
| NO | 08.07.2020 | ||
| IS | 08.08.2020 | ||
| Former [2020/46] | IS | 08.08.2020 | Documents cited: | Search | [A] DE19546263 (WELGER GEB et al.) * (Entgegenhaltung aus dem Erteilungsverfahren) * | Opposition | DE19546263 | DE602004004500 | DE19841598 | DE60130059 | EP2250876 | EP1062860 | EP2742794 | DE19932272 | DE102009013473 | DE19805854 | DE19546263 | DE602004004500 | DE19841598 | DE60130059 | EP2250876 | EP1062860 | EP2742794 | DE19932272 | DE102009013473 | DE19805854 | DE602004004500 | DE60130059 | EP2250876 | EP1062860 | EP2742794 | DE19932272 | "QUADRANT 3200", CLAAS SYSTEMTECHNIK ELEKTRIK | "QUADRANT 3200", CLAAS BETRIEBSANLEITUNG, November 2009 (2009-11-01), XP055782343 | "QUADRANT 2200 2200 RC", CLAAS PROSPEKT QUADRANT, November 1998 (1998-11-01), XP055782341 | CLAAS PROSPEKT QUADRANT, 2013, pages 2 | "Feinster Schnitt", PRAXISTEST, April 2011 (2011-04-01), XP055782125 | "Endlich mit Schublade!", SONDERDRUCK, September 2012 (2012-09-01), XP055782118 | "Tractors and machinery for agriculture and forestry Serial control and communications data network Part 10: Task controller and management information system data interchange", ISO TC 23/SC 19/WG 1, 13 July 2009 (2009-07-13), XP055782335 | "QUADRANT 3200 betriebsanleitung", CLAAS SERVICE & PARTS, November 2009 (2009-11-01), pages 1 - 380 | ANONYMOUS: "QUADERBALLENPRESSE QUADRANT 2200 2200 RC", CLAAS, 1 December 2008 (2008-12-01), pages 1 - 13, XP055965147, Retrieved from the Internet | ANONYMOUS: "Praxistest Claas Quadrant 3200 FineCut: Feinster Schnitt ", PROFI PRAXISTEST, 1 April 2011 (2011-04-01), pages 1 - 6, XP055965305, Retrieved from the Internet | ANONYMOUS: "Claas Quadrant RotoCut/FineCut: Endlich mit Schublade!", PROFI, 1 September 2012 (2012-09-01), pages 1 - 2, XP055965174, Retrieved from the Internet | ANONNMOUS: "Tractors and machinery for agriculture and forestry Serial control and communications data network Part 10: Task controller and management information system data interchange", ISO TC 23/SC 19/WG 1, 13 July 2009 (2009-07-13), pages 1 - 104, XP055782335 |