blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3295882

EP3295882 - BONE SCREW [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  10.04.2020
Database last updated on 05.10.2024
FormerThe patent has been granted
Status updated on  03.05.2019
FormerGrant of patent is intended
Status updated on  04.02.2019
FormerRequest for examination was made
Status updated on  31.08.2018
FormerThe application has been published
Status updated on  16.02.2018
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
Grow-Ing Breitenstein
Benzburweg 18
4410 Liestal / CH
[2018/12]
Inventor(s)01 / Breitenstein, Michael
Buechweg 256
4493 Wenslingen / CH
 [2018/12]
Representative(s)Herrmann, Johanna
Industrial Property Services GmbH
Rosenweg 14
4303 Kaiseraugst / CH
[2018/12]
Application number, filing date16188734.414.09.2016
[2018/12]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3295882
Date:21.03.2018
Language:DE
[2018/12]
Type: B1 Patent specification 
No.:EP3295882
Date:05.06.2019
Language:DE
[2019/23]
Search report(s)(Supplementary) European search report - dispatched on:EP15.11.2016
ClassificationIPC:A61B17/86
[2018/12]
CPC:
A61B17/863 (EP); A61B17/8685 (EP); A61B17/866 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/40]
Former [2018/12]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:KNOCHENSCHRAUBE[2018/12]
English:BONE SCREW[2018/12]
French:VIS À OS[2018/12]
Examination procedure14.09.2016Date on which the examining division has become responsible
22.08.2018Examination requested  [2018/40]
05.02.2019Communication of intention to grant the patent
25.04.2019Fee for grant paid
25.04.2019Fee for publishing/printing paid
25.04.2019Receipt of the translation of the claim(s)
Opposition(s)06.03.2020No opposition filed within time limit [2020/20]
Fees paidRenewal fee
22.08.2018Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU14.09.2016
AL05.06.2019
CY05.06.2019
CZ05.06.2019
DK05.06.2019
EE05.06.2019
ES05.06.2019
FI05.06.2019
HR05.06.2019
IT05.06.2019
LT05.06.2019
LV05.06.2019
MC05.06.2019
MK05.06.2019
MT05.06.2019
NL05.06.2019
PL05.06.2019
RO05.06.2019
RS05.06.2019
SE05.06.2019
SI05.06.2019
SK05.06.2019
SM05.06.2019
TR05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
IE14.09.2019
LU14.09.2019
BE30.09.2019
IS05.10.2019
PT07.10.2019
[2022/32]
Former [2021/34]HU14.09.2016
AL05.06.2019
CY05.06.2019
CZ05.06.2019
DK05.06.2019
EE05.06.2019
ES05.06.2019
FI05.06.2019
HR05.06.2019
IT05.06.2019
LT05.06.2019
LV05.06.2019
MC05.06.2019
MT05.06.2019
NL05.06.2019
PL05.06.2019
RO05.06.2019
RS05.06.2019
SE05.06.2019
SI05.06.2019
SK05.06.2019
SM05.06.2019
TR05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
IE14.09.2019
LU14.09.2019
BE30.09.2019
IS05.10.2019
PT07.10.2019
Former [2021/32]HU14.09.2016
AL05.06.2019
CY05.06.2019
CZ05.06.2019
DK05.06.2019
EE05.06.2019
ES05.06.2019
FI05.06.2019
HR05.06.2019
IT05.06.2019
LT05.06.2019
LV05.06.2019
MC05.06.2019
NL05.06.2019
PL05.06.2019
RO05.06.2019
RS05.06.2019
SE05.06.2019
SI05.06.2019
SK05.06.2019
SM05.06.2019
TR05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
IE14.09.2019
LU14.09.2019
BE30.09.2019
IS05.10.2019
PT07.10.2019
Former [2021/26]AL05.06.2019
CY05.06.2019
CZ05.06.2019
DK05.06.2019
EE05.06.2019
ES05.06.2019
FI05.06.2019
HR05.06.2019
IT05.06.2019
LT05.06.2019
LV05.06.2019
MC05.06.2019
NL05.06.2019
PL05.06.2019
RO05.06.2019
RS05.06.2019
SE05.06.2019
SI05.06.2019
SK05.06.2019
SM05.06.2019
TR05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
IE14.09.2019
LU14.09.2019
BE30.09.2019
IS05.10.2019
PT07.10.2019
Former [2020/38]AL05.06.2019
CZ05.06.2019
DK05.06.2019
EE05.06.2019
ES05.06.2019
FI05.06.2019
HR05.06.2019
IT05.06.2019
LT05.06.2019
LV05.06.2019
MC05.06.2019
NL05.06.2019
PL05.06.2019
RO05.06.2019
RS05.06.2019
SE05.06.2019
SI05.06.2019
SK05.06.2019
SM05.06.2019
TR05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
IE14.09.2019
LU14.09.2019
BE30.09.2019
IS05.10.2019
PT07.10.2019
Former [2020/36]AL05.06.2019
CZ05.06.2019
DK05.06.2019
EE05.06.2019
ES05.06.2019
FI05.06.2019
HR05.06.2019
IT05.06.2019
LT05.06.2019
LV05.06.2019
MC05.06.2019
NL05.06.2019
PL05.06.2019
RO05.06.2019
RS05.06.2019
SE05.06.2019
SI05.06.2019
SK05.06.2019
SM05.06.2019
TR05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
IE14.09.2019
LU14.09.2019
IS05.10.2019
PT07.10.2019
Former [2020/35]AL05.06.2019
CZ05.06.2019
DK05.06.2019
EE05.06.2019
ES05.06.2019
FI05.06.2019
HR05.06.2019
IT05.06.2019
LT05.06.2019
LV05.06.2019
MC05.06.2019
NL05.06.2019
PL05.06.2019
RO05.06.2019
RS05.06.2019
SE05.06.2019
SI05.06.2019
SK05.06.2019
SM05.06.2019
TR05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
LU14.09.2019
IS05.10.2019
PT07.10.2019
Former [2020/25]AL05.06.2019
CZ05.06.2019
DK05.06.2019
EE05.06.2019
ES05.06.2019
FI05.06.2019
HR05.06.2019
IT05.06.2019
LT05.06.2019
LV05.06.2019
MC05.06.2019
NL05.06.2019
PL05.06.2019
RO05.06.2019
RS05.06.2019
SE05.06.2019
SI05.06.2019
SK05.06.2019
SM05.06.2019
TR05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
IS05.10.2019
PT07.10.2019
Former [2020/22]AL05.06.2019
CZ05.06.2019
DK05.06.2019
EE05.06.2019
ES05.06.2019
FI05.06.2019
HR05.06.2019
IT05.06.2019
LT05.06.2019
LV05.06.2019
NL05.06.2019
RO05.06.2019
RS05.06.2019
SE05.06.2019
SK05.06.2019
SM05.06.2019
TR05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
IS05.10.2019
PT07.10.2019
Former [2020/17]AL05.06.2019
CZ05.06.2019
EE05.06.2019
ES05.06.2019
FI05.06.2019
HR05.06.2019
IT05.06.2019
LT05.06.2019
LV05.06.2019
NL05.06.2019
RO05.06.2019
RS05.06.2019
SE05.06.2019
SK05.06.2019
SM05.06.2019
TR05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
IS05.10.2019
PT07.10.2019
Former [2020/13]AL05.06.2019
CZ05.06.2019
EE05.06.2019
ES05.06.2019
FI05.06.2019
HR05.06.2019
IT05.06.2019
LT05.06.2019
LV05.06.2019
NL05.06.2019
RO05.06.2019
RS05.06.2019
SE05.06.2019
SK05.06.2019
SM05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
IS05.10.2019
PT07.10.2019
Former [2020/12]AL05.06.2019
CZ05.06.2019
EE05.06.2019
ES05.06.2019
FI05.06.2019
HR05.06.2019
IT05.06.2019
LT05.06.2019
LV05.06.2019
NL05.06.2019
RO05.06.2019
RS05.06.2019
SE05.06.2019
SK05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
IS05.10.2019
PT07.10.2019
Former [2020/11]AL05.06.2019
CZ05.06.2019
EE05.06.2019
ES05.06.2019
FI05.06.2019
HR05.06.2019
LT05.06.2019
LV05.06.2019
NL05.06.2019
RO05.06.2019
RS05.06.2019
SE05.06.2019
SK05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
PT07.10.2019
Former [2020/10]AL05.06.2019
CZ05.06.2019
ES05.06.2019
FI05.06.2019
HR05.06.2019
LT05.06.2019
LV05.06.2019
NL05.06.2019
RO05.06.2019
RS05.06.2019
SE05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
PT07.10.2019
Former [2020/09]AL05.06.2019
CZ05.06.2019
ES05.06.2019
FI05.06.2019
HR05.06.2019
LT05.06.2019
LV05.06.2019
NL05.06.2019
RS05.06.2019
SE05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
Former [2020/07]AL05.06.2019
ES05.06.2019
FI05.06.2019
HR05.06.2019
LT05.06.2019
LV05.06.2019
NL05.06.2019
RS05.06.2019
SE05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
Former [2019/51]AL05.06.2019
ES05.06.2019
FI05.06.2019
HR05.06.2019
LT05.06.2019
LV05.06.2019
RS05.06.2019
SE05.06.2019
BG05.09.2019
NO05.09.2019
GR06.09.2019
Former [2019/50]AL05.06.2019
ES05.06.2019
FI05.06.2019
HR05.06.2019
LT05.06.2019
LV05.06.2019
RS05.06.2019
SE05.06.2019
NO05.09.2019
GR06.09.2019
Former [2019/49]AL05.06.2019
ES05.06.2019
FI05.06.2019
HR05.06.2019
LT05.06.2019
SE05.06.2019
NO05.09.2019
Former [2019/48]ES05.06.2019
FI05.06.2019
LT05.06.2019
SE05.06.2019
NO05.09.2019
Former [2019/47]ES05.06.2019
FI05.06.2019
LT05.06.2019
NO05.09.2019
Documents cited:Search[AD]US2532296  (GIESEN JOSEPH H) [AD] 1-15 * figures 1-4 *;
 [A]EP2749236  (WRIGHT MEDICAL TECH INC [US]) [A] 1 * figures 23, 24 *
by applicantDE102006060933
 FR2902637
 DE4343117
 US2014005728
 WO2007048267
 EP1609560
 US2532296
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.