EP3156848 - ELECTROPHOTOGRAPHIC PHOTOSENSITIVE DRUM UNIT, CARTRIDGE, AND FLANGE MEMBER [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 14.10.2022 Database last updated on 24.07.2024 | |
Former | The patent has been granted Status updated on 05.11.2021 | ||
Former | Grant of patent is intended Status updated on 22.06.2021 | ||
Former | Request for examination was made Status updated on 27.10.2017 | ||
Former | The application has been published Status updated on 20.03.2017 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Canon Kabushiki Kaisha 30-2, Shimomaruko 3-chome Ohta-ku Tokyo 146-8501 / JP | [2017/16] | Inventor(s) | 01 /
KAWAKAMI, Takuya c/o CANON KABUSHIKI KAISHA 30-2, Shimomaruko 3-chome Ohta-ku, Tokyo / JP | 02 /
KUSANO, Yohei c/o CANON KABUSHIKI KAISHA 30-2, Shimomaruko 3-chome Ohta-ku, Tokyo / JP | [2017/16] | Representative(s) | Canon Europe Limited European Intellectual Property Group 4 Roundwood Avenue Stockley Park Uxbridge UB11 1AF / GB | [N/P] |
Former [2021/49] | Canon Europe Limited European Intellectual Property Group 3 The Square, Stockley Park Uxbridge UB11 1ET / GB | ||
Former [2017/16] | Houle, Timothy James Canon Europe Ltd European Patent Department 3 The Square Stockley Park Uxbridge, Middlesex UB11 1ET / GB | Application number, filing date | 16193300.7 | 11.10.2016 | [2017/16] | Priority number, date | JP20150203145 | 14.10.2015 Original published format: JP 2015203145 | [2017/16] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3156848 | Date: | 19.04.2017 | Language: | EN | [2017/16] | Type: | B1 Patent specification | No.: | EP3156848 | Date: | 08.12.2021 | Language: | EN | [2021/49] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 03.03.2017 | Classification | IPC: | G03G15/00 | [2017/16] | CPC: |
G03G15/757 (EP,KR,US);
G03G21/1814 (CN);
G03G15/751 (US);
G03G15/02 (CN);
G03G21/1647 (EP,US);
G03G21/1671 (US);
G03G21/1821 (KR);
G03G21/1857 (KR);
G03G21/186 (CN);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/48] |
Former [2017/16] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | ELEKTROFOTOGRAFISCHE LICHTEMPFINDLICHE TROMMELEINHEIT, KARTUSCHE UND FLANSCHELEMENT | [2017/16] | English: | ELECTROPHOTOGRAPHIC PHOTOSENSITIVE DRUM UNIT, CARTRIDGE, AND FLANGE MEMBER | [2017/16] | French: | UNITÉ DE TAMBOUR PHOTOSENSIBLE ÉLECTROPHOTOGRAPHIQUE, CARTOUCHE ET ÉLÉMENT DE BRIDE | [2017/16] | Examination procedure | 11.10.2016 | Date on which the examining division has become responsible | 05.07.2017 | Amendment by applicant (claims and/or description) | 19.10.2017 | Examination requested [2017/48] | 23.06.2021 | Communication of intention to grant the patent | 13.10.2021 | Fee for grant paid | 13.10.2021 | Fee for publishing/printing paid | 13.10.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 09.09.2022 | No opposition filed within time limit [2022/46] | Fees paid | Renewal fee | 31.10.2018 | Renewal fee patent year 03 | 31.10.2019 | Renewal fee patent year 04 | 02.11.2020 | Renewal fee patent year 05 | 02.11.2021 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 11.10.2016 | AL | 08.12.2021 | AT | 08.12.2021 | CY | 08.12.2021 | CZ | 08.12.2021 | DK | 08.12.2021 | EE | 08.12.2021 | ES | 08.12.2021 | FI | 08.12.2021 | HR | 08.12.2021 | IT | 08.12.2021 | LT | 08.12.2021 | LV | 08.12.2021 | MC | 08.12.2021 | MK | 08.12.2021 | NL | 08.12.2021 | PL | 08.12.2021 | RO | 08.12.2021 | RS | 08.12.2021 | SE | 08.12.2021 | SI | 08.12.2021 | SK | 08.12.2021 | SM | 08.12.2021 | TR | 08.12.2021 | BG | 08.03.2022 | NO | 08.03.2022 | GR | 09.03.2022 | IS | 08.04.2022 | PT | 08.04.2022 | [2024/29] |
Former [2024/27] | HU | 11.10.2016 | |
AL | 08.12.2021 | ||
AT | 08.12.2021 | ||
CY | 08.12.2021 | ||
CZ | 08.12.2021 | ||
DK | 08.12.2021 | ||
EE | 08.12.2021 | ||
ES | 08.12.2021 | ||
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
IT | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
MC | 08.12.2021 | ||
MK | 08.12.2021 | ||
NL | 08.12.2021 | ||
PL | 08.12.2021 | ||
RO | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
SI | 08.12.2021 | ||
SK | 08.12.2021 | ||
SM | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
IS | 08.04.2022 | ||
PT | 08.04.2022 | ||
Former [2024/21] | HU | 11.10.2016 | |
AL | 08.12.2021 | ||
AT | 08.12.2021 | ||
CY | 08.12.2021 | ||
CZ | 08.12.2021 | ||
DK | 08.12.2021 | ||
EE | 08.12.2021 | ||
ES | 08.12.2021 | ||
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
IT | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
MC | 08.12.2021 | ||
NL | 08.12.2021 | ||
PL | 08.12.2021 | ||
RO | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
SI | 08.12.2021 | ||
SK | 08.12.2021 | ||
SM | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
IS | 08.04.2022 | ||
PT | 08.04.2022 | ||
Former [2024/18] | HU | 11.10.2016 | |
AL | 08.12.2021 | ||
AT | 08.12.2021 | ||
CZ | 08.12.2021 | ||
DK | 08.12.2021 | ||
EE | 08.12.2021 | ||
ES | 08.12.2021 | ||
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
IT | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
MC | 08.12.2021 | ||
NL | 08.12.2021 | ||
PL | 08.12.2021 | ||
RO | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
SI | 08.12.2021 | ||
SK | 08.12.2021 | ||
SM | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
IS | 08.04.2022 | ||
PT | 08.04.2022 | ||
Former [2023/25] | AL | 08.12.2021 | |
AT | 08.12.2021 | ||
CZ | 08.12.2021 | ||
DK | 08.12.2021 | ||
EE | 08.12.2021 | ||
ES | 08.12.2021 | ||
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
IT | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
MC | 08.12.2021 | ||
NL | 08.12.2021 | ||
PL | 08.12.2021 | ||
RO | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
SI | 08.12.2021 | ||
SK | 08.12.2021 | ||
SM | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
IS | 08.04.2022 | ||
PT | 08.04.2022 | ||
Former [2023/01] | AL | 08.12.2021 | |
AT | 08.12.2021 | ||
CZ | 08.12.2021 | ||
DK | 08.12.2021 | ||
EE | 08.12.2021 | ||
ES | 08.12.2021 | ||
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
NL | 08.12.2021 | ||
PL | 08.12.2021 | ||
RO | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
SI | 08.12.2021 | ||
SK | 08.12.2021 | ||
SM | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
IS | 08.04.2022 | ||
PT | 08.04.2022 | ||
Former [2022/49] | AL | 08.12.2021 | |
AT | 08.12.2021 | ||
CZ | 08.12.2021 | ||
DK | 08.12.2021 | ||
EE | 08.12.2021 | ||
ES | 08.12.2021 | ||
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
NL | 08.12.2021 | ||
PL | 08.12.2021 | ||
RO | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
SK | 08.12.2021 | ||
SM | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
IS | 08.04.2022 | ||
PT | 08.04.2022 | ||
Former [2022/46] | AT | 08.12.2021 | |
CZ | 08.12.2021 | ||
DK | 08.12.2021 | ||
EE | 08.12.2021 | ||
ES | 08.12.2021 | ||
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
NL | 08.12.2021 | ||
PL | 08.12.2021 | ||
RO | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
SK | 08.12.2021 | ||
SM | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
IS | 08.04.2022 | ||
PT | 08.04.2022 | ||
Former [2022/42] | AT | 08.12.2021 | |
CZ | 08.12.2021 | ||
EE | 08.12.2021 | ||
ES | 08.12.2021 | ||
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
NL | 08.12.2021 | ||
PL | 08.12.2021 | ||
RO | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
SK | 08.12.2021 | ||
SM | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
IS | 08.04.2022 | ||
PT | 08.04.2022 | ||
Former [2022/36] | AT | 08.12.2021 | |
CZ | 08.12.2021 | ||
EE | 08.12.2021 | ||
ES | 08.12.2021 | ||
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
NL | 08.12.2021 | ||
PL | 08.12.2021 | ||
RO | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
SK | 08.12.2021 | ||
SM | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
PT | 08.04.2022 | ||
Former [2022/35] | CZ | 08.12.2021 | |
EE | 08.12.2021 | ||
ES | 08.12.2021 | ||
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
NL | 08.12.2021 | ||
RO | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
SK | 08.12.2021 | ||
SM | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
PT | 08.04.2022 | ||
Former [2022/34] | EE | 08.12.2021 | |
ES | 08.12.2021 | ||
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
NL | 08.12.2021 | ||
RO | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
SM | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
PT | 08.04.2022 | ||
Former [2022/33] | ES | 08.12.2021 | |
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
NL | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
SM | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
Former [2022/30] | ES | 08.12.2021 | |
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
NL | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
Former [2022/25] | ES | 08.12.2021 | |
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
BG | 08.03.2022 | ||
NO | 08.03.2022 | ||
GR | 09.03.2022 | ||
Former [2022/24] | ES | 08.12.2021 | |
FI | 08.12.2021 | ||
HR | 08.12.2021 | ||
LT | 08.12.2021 | ||
LV | 08.12.2021 | ||
RS | 08.12.2021 | ||
SE | 08.12.2021 | ||
BG | 08.03.2022 | ||
GR | 09.03.2022 | ||
Former [2022/22] | FI | 08.12.2021 | |
LT | 08.12.2021 | ||
RS | 08.12.2021 | ||
BG | 08.03.2022 | ||
Former [2022/21] | RS | 08.12.2021 | |
BG | 08.03.2022 | ||
Former [2022/19] | BG | 08.03.2022 | Documents cited: | Search | [X]WO2014157113 (MITSUBISHI CHEM CORP [JP]) [X] 1 * abstract *; | [XP]EP2980655 (MITSUBISHI CHEM CORP [JP]) [XP] 1 * paragraphs [0044] - [0063]; figures 3,4,5a,5b,6a,6b,7a,7b,8a,8b *; | [AD]JP2015079243 (CANON KK) [AD] 1-11 * abstract *; | [P]EP3045979 (CANON KK [JP]) | by applicant | JP2015079243 |