blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3168933

EP3168933 - PLUG SOCKET POLE CONTACT [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  23.08.2019
Database last updated on 29.07.2024
FormerThe patent has been granted
Status updated on  14.09.2018
FormerGrant of patent is intended
Status updated on  07.06.2018
FormerExamination is in progress
Status updated on  16.02.2018
FormerRequest for examination was made
Status updated on  17.11.2017
FormerThe application has been published
Status updated on  18.04.2017
Most recent event   Tooltip03.07.2020Lapse of the patent in a contracting state
New state(s): CY, HU, MK
published on 05.08.2020  [2020/32]
Applicant(s)For all designated states
ABB Schweiz AG
Brown Boveri Strasse 6
5400 Baden / CH
[2019/36]
Former [2017/20]For all designated states
ABB AG
Kallstadter Strasse 1
68309 Mannheim / DE
Inventor(s)01 / Mrkajic, Oliver
Asternweg 3
58511 Lüdenscheid / DE
02 / Ewers, Manfred
Zum Mühlenstrang 9
58239 Schwerte / DE
 [2017/20]
Application number, filing date16197427.404.11.2016
[2017/20]
Priority number, dateDE20151011938911.11.2015         Original published format: DE102015119389
[2017/20]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3168933
Date:17.05.2017
Language:DE
[2017/20]
Type: B1 Patent specification 
No.:EP3168933
Date:17.10.2018
Language:DE
[2018/42]
Search report(s)(Supplementary) European search report - dispatched on:EP20.03.2017
ClassificationIPC:H01R4/48, H01R13/18, // H01R13/11, H01R24/76
[2017/20]
CPC:
H01R13/18 (EP); H01R4/4823 (EP); H01R4/485 (EP);
H01R13/111 (EP); H01R24/76 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/51]
Former [2017/20]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:STECKDOSENPOLKONTAKT[2017/20]
English:PLUG SOCKET POLE CONTACT[2017/20]
French:BORNE DE PRISE ÉLECTRIQUE[2017/20]
Examination procedure04.11.2016Date on which the examining division has become responsible
10.11.2017Amendment by applicant (claims and/or description)
10.11.2017Examination requested  [2017/51]
15.02.2018Despatch of a communication from the examining division (Time limit: M02)
16.03.2018Reply to a communication from the examining division
08.06.2018Communication of intention to grant the patent
03.09.2018Fee for grant paid
03.09.2018Fee for publishing/printing paid
03.09.2018Receipt of the translation of the claim(s)
Opposition(s)18.07.2019No opposition filed within time limit [2019/39]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU04.11.2016
AL17.10.2018
CY17.10.2018
CZ17.10.2018
DK17.10.2018
EE17.10.2018
FI17.10.2018
HR17.10.2018
LT17.10.2018
LV17.10.2018
MC17.10.2018
MK17.10.2018
MT17.10.2018
RO17.10.2018
RS17.10.2018
SI17.10.2018
SK17.10.2018
SM17.10.2018
IE04.11.2018
LU04.11.2018
BE30.11.2018
BG17.01.2019
GR18.01.2019
IS17.02.2019
PT17.02.2019
[2020/31]
Former [2020/08]AL17.10.2018
CZ17.10.2018
DK17.10.2018
EE17.10.2018
FI17.10.2018
HR17.10.2018
LT17.10.2018
LV17.10.2018
MC17.10.2018
MT17.10.2018
RO17.10.2018
RS17.10.2018
SI17.10.2018
SK17.10.2018
SM17.10.2018
IE04.11.2018
LU04.11.2018
BE30.11.2018
BG17.01.2019
GR18.01.2019
IS17.02.2019
PT17.02.2019
Former [2019/50]AL17.10.2018
CZ17.10.2018
DK17.10.2018
EE17.10.2018
FI17.10.2018
HR17.10.2018
LT17.10.2018
LV17.10.2018
MC17.10.2018
RO17.10.2018
RS17.10.2018
SI17.10.2018
SK17.10.2018
SM17.10.2018
IE04.11.2018
LU04.11.2018
BE30.11.2018
BG17.01.2019
GR18.01.2019
IS17.02.2019
PT17.02.2019
Former [2019/48]AL17.10.2018
CZ17.10.2018
DK17.10.2018
EE17.10.2018
FI17.10.2018
HR17.10.2018
LT17.10.2018
LV17.10.2018
MC17.10.2018
RO17.10.2018
RS17.10.2018
SK17.10.2018
SM17.10.2018
IE04.11.2018
LU04.11.2018
BG17.01.2019
GR18.01.2019
IS17.02.2019
PT17.02.2019
Former [2019/40]AL17.10.2018
CZ17.10.2018
DK17.10.2018
EE17.10.2018
FI17.10.2018
HR17.10.2018
LT17.10.2018
LV17.10.2018
MC17.10.2018
RO17.10.2018
RS17.10.2018
SK17.10.2018
SM17.10.2018
LU04.11.2018
BG17.01.2019
GR18.01.2019
IS17.02.2019
PT17.02.2019
Former [2019/37]AL17.10.2018
CZ17.10.2018
DK17.10.2018
EE17.10.2018
FI17.10.2018
HR17.10.2018
LT17.10.2018
LV17.10.2018
MC17.10.2018
RO17.10.2018
RS17.10.2018
SM17.10.2018
LU04.11.2018
BG17.01.2019
GR18.01.2019
IS17.02.2019
PT17.02.2019
Former [2019/35]AL17.10.2018
CZ17.10.2018
DK17.10.2018
FI17.10.2018
HR17.10.2018
LT17.10.2018
LV17.10.2018
RS17.10.2018
LU04.11.2018
BG17.01.2019
GR18.01.2019
IS17.02.2019
PT17.02.2019
Former [2019/34]AL17.10.2018
DK17.10.2018
FI17.10.2018
HR17.10.2018
LT17.10.2018
LV17.10.2018
RS17.10.2018
LU04.11.2018
BG17.01.2019
GR18.01.2019
IS17.02.2019
PT17.02.2019
Former [2019/26]AL17.10.2018
FI17.10.2018
HR17.10.2018
LT17.10.2018
LV17.10.2018
RS17.10.2018
BG17.01.2019
GR18.01.2019
IS17.02.2019
PT17.02.2019
Former [2019/25]FI17.10.2018
HR17.10.2018
LT17.10.2018
LV17.10.2018
RS17.10.2018
BG17.01.2019
GR18.01.2019
IS17.02.2019
Former [2019/24]FI17.10.2018
HR17.10.2018
LT17.10.2018
LV17.10.2018
BG17.01.2019
GR18.01.2019
IS17.02.2019
Former [2019/23]FI17.10.2018
HR17.10.2018
LT17.10.2018
LV17.10.2018
BG17.01.2019
IS17.02.2019
Former [2019/22]FI17.10.2018
LT17.10.2018
BG17.01.2019
IS17.02.2019
Former [2019/21]FI17.10.2018
LT17.10.2018
IS17.02.2019
Former [2019/20]LT17.10.2018
Documents cited:Search[Y]DE3809843  (HOCHKOEPPER PAUL GMBH [DE]);
 [XYI]EP2645488  (ABB AG [DE])
by applicantDE102013005143
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.