blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3145173

EP3145173 - APPARATUS COMPRISING IMAGE SENSOR ARRAY HAVING GLOBAL SHUTTER SHARED BY A PLURALITY OF PIXELS [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  17.03.2023
Database last updated on 03.10.2024
FormerThe patent has been granted
Status updated on  08.04.2022
FormerGrant of patent is intended
Status updated on  30.11.2021
FormerExamination is in progress
Status updated on  06.05.2019
FormerRequest for examination was made
Status updated on  17.02.2017
Most recent event   Tooltip06.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 09.10.2024 [2024/41]
Applicant(s)For all designated states
Hand Held Products, Inc.
Old Bailes Road
Fort Mill, SC 29707 / US
[2017/12]
Inventor(s)01 / WANG, Ynjiun Paul
c/o Honeywell International Inc.,
Patent Services
P.O. Box 2245
101 Columbia Road
Morristown, NJ 07962 / US
 [2017/12]
Representative(s)Haseltine Lake Kempner LLP
Cheapside House
138 Cheapside
London EC2V 6BJ / GB
[2022/19]
Former [2017/12]Houghton, Mark Phillip
Patent Outsourcing Limited 1 King Street
Bakewell, Derbyshire DE45 1DZ / GB
Application number, filing date16197555.219.10.2012
[2017/12]
Priority number, dateUS20111328977804.11.2011         Original published format: US201113289778
[2017/12]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3145173
Date:22.03.2017
Language:EN
[2017/12]
Type: B1 Patent specification 
No.:EP3145173
Date:11.05.2022
Language:EN
[2022/19]
Search report(s)(Supplementary) European search report - dispatched on:EP16.02.2017
ClassificationIPC:H04N5/347, H04N5/353, H04N5/3745, G06K7/10
[2021/50]
CPC:
G06K7/10722 (EP,US); H04N25/53 (US); H04N25/46 (EP,US);
H04N25/532 (EP); H04N25/778 (EP,US)
Former IPC [2017/12]H04N5/347, H04N5/353, H04N5/374, G06K7/10
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/12]
TitleGerman:VORRICHTUNG EINE BILDSENSORMATRIX MIT VON MEHREREN BILDELEMENTEN GETEILTEN GLOBALEN VERSCHLUSS BEINHALTEND[2017/12]
English:APPARATUS COMPRISING IMAGE SENSOR ARRAY HAVING GLOBAL SHUTTER SHARED BY A PLURALITY OF PIXELS[2017/12]
French:DISPOSITIF COMPRENANT UN RÉSEAU DE CAPTEURS D'IMAGE AVEC OBTURATEUR GLOBAL PARTAGÉE ENTRE PLUSIEURS PIXELS[2021/50]
Former [2017/12]DISPOSITIF COMPRENANT UN RÉSEAU DE CAPTEURS D'IMAGE AVEC OBTURATEUR GLOBAL PARTAGÉE ENTRE PLUSIEUR PIXEL
Examination procedure07.11.2016Examination requested  [2017/12]
07.11.2016Date on which the examining division has become responsible
22.05.2017Amendment by applicant (claims and/or description)
09.05.2019Despatch of a communication from the examining division (Time limit: M04)
09.08.2019Reply to a communication from the examining division
09.11.2021Cancellation of oral proceeding that was planned for 01.12.2021
01.12.2021Communication of intention to grant the patent
01.12.2021Date of oral proceedings (cancelled)
28.02.2022Receipt of the translation of the claim(s)
31.03.2022Fee for grant paid
31.03.2022Fee for publishing/printing paid
Parent application(s)   TooltipEP12189324.2  / EP2590400
Opposition(s)14.02.2023No opposition filed within time limit [2023/16]
Fees paidRenewal fee
07.11.2016Renewal fee patent year 03
07.11.2016Renewal fee patent year 04
07.11.2016Renewal fee patent year 05
31.10.2017Renewal fee patent year 06
30.10.2018Renewal fee patent year 07
28.10.2019Renewal fee patent year 08
28.10.2020Renewal fee patent year 09
26.10.2021Renewal fee patent year 10
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU19.10.2012
AL11.05.2022
AT11.05.2022
CY11.05.2022
CZ11.05.2022
DK11.05.2022
EE11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
IT11.05.2022
LT11.05.2022
LV11.05.2022
MC11.05.2022
MK11.05.2022
MT11.05.2022
NL11.05.2022
PL11.05.2022
RO11.05.2022
RS11.05.2022
SE11.05.2022
SI11.05.2022
SK11.05.2022
SM11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
IE19.10.2022
LU19.10.2022
BE31.10.2022
CH31.10.2022
LI31.10.2022
[2024/41]
Former [2024/27]HU19.10.2012
AL11.05.2022
AT11.05.2022
CY11.05.2022
CZ11.05.2022
DK11.05.2022
EE11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
IT11.05.2022
LT11.05.2022
LV11.05.2022
MC11.05.2022
MK11.05.2022
NL11.05.2022
PL11.05.2022
RO11.05.2022
RS11.05.2022
SE11.05.2022
SI11.05.2022
SK11.05.2022
SM11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
IE19.10.2022
LU19.10.2022
BE31.10.2022
CH31.10.2022
LI31.10.2022
Former [2024/21]HU19.10.2012
AL11.05.2022
AT11.05.2022
CY11.05.2022
CZ11.05.2022
DK11.05.2022
EE11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
IT11.05.2022
LT11.05.2022
LV11.05.2022
MC11.05.2022
NL11.05.2022
PL11.05.2022
RO11.05.2022
RS11.05.2022
SE11.05.2022
SI11.05.2022
SK11.05.2022
SM11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
IE19.10.2022
LU19.10.2022
BE31.10.2022
CH31.10.2022
LI31.10.2022
Former [2024/18]HU19.10.2012
AL11.05.2022
AT11.05.2022
CZ11.05.2022
DK11.05.2022
EE11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
IT11.05.2022
LT11.05.2022
LV11.05.2022
MC11.05.2022
NL11.05.2022
PL11.05.2022
RO11.05.2022
RS11.05.2022
SE11.05.2022
SI11.05.2022
SK11.05.2022
SM11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
IE19.10.2022
LU19.10.2022
BE31.10.2022
CH31.10.2022
LI31.10.2022
Former [2024/11]AL11.05.2022
AT11.05.2022
CZ11.05.2022
DK11.05.2022
EE11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
IT11.05.2022
LT11.05.2022
LV11.05.2022
MC11.05.2022
NL11.05.2022
PL11.05.2022
RO11.05.2022
RS11.05.2022
SE11.05.2022
SI11.05.2022
SK11.05.2022
SM11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
IE19.10.2022
LU19.10.2022
BE31.10.2022
CH31.10.2022
LI31.10.2022
Former [2023/48]AL11.05.2022
AT11.05.2022
CZ11.05.2022
DK11.05.2022
EE11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
MC11.05.2022
NL11.05.2022
PL11.05.2022
RO11.05.2022
RS11.05.2022
SE11.05.2022
SI11.05.2022
SK11.05.2022
SM11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
IE19.10.2022
LU19.10.2022
BE31.10.2022
CH31.10.2022
LI31.10.2022
Former [2023/42]AL11.05.2022
AT11.05.2022
CZ11.05.2022
DK11.05.2022
EE11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
MC11.05.2022
NL11.05.2022
PL11.05.2022
RO11.05.2022
RS11.05.2022
SE11.05.2022
SI11.05.2022
SK11.05.2022
SM11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
LU19.10.2022
BE31.10.2022
CH31.10.2022
LI31.10.2022
Former [2023/35]AL11.05.2022
AT11.05.2022
CZ11.05.2022
DK11.05.2022
EE11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
MC11.05.2022
NL11.05.2022
PL11.05.2022
RO11.05.2022
RS11.05.2022
SE11.05.2022
SI11.05.2022
SK11.05.2022
SM11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
LU19.10.2022
CH31.10.2022
LI31.10.2022
Former [2023/30]AL11.05.2022
AT11.05.2022
CZ11.05.2022
DK11.05.2022
EE11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
MC11.05.2022
NL11.05.2022
PL11.05.2022
RO11.05.2022
RS11.05.2022
SE11.05.2022
SI11.05.2022
SK11.05.2022
SM11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
LU19.10.2022
Former [2023/25]AL11.05.2022
AT11.05.2022
CZ11.05.2022
DK11.05.2022
EE11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
MC11.05.2022
NL11.05.2022
PL11.05.2022
RO11.05.2022
RS11.05.2022
SE11.05.2022
SI11.05.2022
SK11.05.2022
SM11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
Former [2023/17]AL11.05.2022
AT11.05.2022
CZ11.05.2022
DK11.05.2022
EE11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
NL11.05.2022
PL11.05.2022
RO11.05.2022
RS11.05.2022
SE11.05.2022
SK11.05.2022
SM11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
Former [2023/09]AT11.05.2022
CZ11.05.2022
DK11.05.2022
EE11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
NL11.05.2022
PL11.05.2022
RO11.05.2022
RS11.05.2022
SE11.05.2022
SK11.05.2022
SM11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
Former [2023/07]AT11.05.2022
DK11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
NL11.05.2022
PL11.05.2022
RS11.05.2022
SE11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
Former [2022/51]AT11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
NL11.05.2022
PL11.05.2022
RS11.05.2022
SE11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
IS11.09.2022
PT12.09.2022
Former [2022/50]AT11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
NL11.05.2022
PL11.05.2022
RS11.05.2022
SE11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
PT12.09.2022
Former [2022/49]AT11.05.2022
ES11.05.2022
FI11.05.2022
HR11.05.2022
LT11.05.2022
LV11.05.2022
NL11.05.2022
SE11.05.2022
BG11.08.2022
NO11.08.2022
GR12.08.2022
PT12.09.2022
Former [2022/48]AT11.05.2022
ES11.05.2022
FI11.05.2022
LT11.05.2022
NL11.05.2022
SE11.05.2022
NO11.08.2022
PT12.09.2022
Former [2022/47]AT11.05.2022
ES11.05.2022
FI11.05.2022
LT11.05.2022
SE11.05.2022
NO11.08.2022
PT12.09.2022
Documents cited:Search[YA]US2006202036  (WANG YNJIUN [US], et al);
 [XYI]US2010309340  (BORDER JOHN N [US], et al)
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.