EP3181406 - CLADDING SECTION FOR A MOTOR VEHICLE AND METHOD FOR PRODUCING A CLADDING SECTION [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 06.09.2019 Database last updated on 30.07.2024 | |
Former | The patent has been granted Status updated on 28.09.2018 | ||
Former | Grant of patent is intended Status updated on 07.05.2018 | ||
Former | Request for examination was made Status updated on 05.01.2018 | ||
Former | The application has been published Status updated on 19.05.2017 | Most recent event Tooltip | 03.07.2020 | Lapse of the patent in a contracting state New state(s): CY, HU, MK | published on 05.08.2020 [2020/32] | Applicant(s) | For all designated states REHAU AG + Co Otto-Hahn-Strasse 2 95111 Rehau / DE | [2017/25] | Inventor(s) | 01 /
Vogel, Matthias An der Feuerwache 6 95233 Helmbrechts / DE | 02 /
Uebel, Julia Bismarckstraße 8 08527 Plauen / DE | 03 /
Wolff, Christian Zeisigweg 10 95030 Hof / DE | [2017/25] | Application number, filing date | 16201904.6 | 02.12.2016 | [2017/25] | Priority number, date | DE201510122103 | 17.12.2015 Original published format: DE102015122103 | [2017/25] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3181406 | Date: | 21.06.2017 | Language: | DE | [2017/25] | Type: | B1 Patent specification | No.: | EP3181406 | Date: | 31.10.2018 | Language: | DE | [2018/44] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 28.04.2017 | Classification | IPC: | B60R13/00 | [2017/25] | CPC: |
B60R13/00 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/06] |
Former [2017/25] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VERKLEIDUNGSTEIL FÜR EIN KRAFTFAHRZEUG, SOWIE VERFAHREN ZUR HERSTELLUNG EINES VERKLEIDUNGSTEILES | [2017/25] | English: | CLADDING SECTION FOR A MOTOR VEHICLE AND METHOD FOR PRODUCING A CLADDING SECTION | [2017/25] | French: | ÉLÉMENT D'HABILLAGE POUR VÉHICULE AUTOMOBILE ET PROCÉDÉ DESTINE À LA FABRICATION D'UN ÉLÉMENT D'HABILLAGE | [2017/25] | Examination procedure | 02.12.2016 | Date on which the examining division has become responsible | 21.12.2017 | Amendment by applicant (claims and/or description) | 21.12.2017 | Examination requested [2018/06] | 08.05.2018 | Communication of intention to grant the patent | 14.09.2018 | Fee for grant paid | 14.09.2018 | Fee for publishing/printing paid | 14.09.2018 | Receipt of the translation of the claim(s) | Opposition(s) | 01.08.2019 | No opposition filed within time limit [2019/41] |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 02.12.2016 | AL | 31.10.2018 | CY | 31.10.2018 | CZ | 31.10.2018 | DK | 31.10.2018 | EE | 31.10.2018 | ES | 31.10.2018 | FI | 31.10.2018 | HR | 31.10.2018 | IT | 31.10.2018 | LT | 31.10.2018 | LV | 31.10.2018 | MC | 31.10.2018 | MK | 31.10.2018 | MT | 31.10.2018 | NL | 31.10.2018 | PL | 31.10.2018 | RO | 31.10.2018 | RS | 31.10.2018 | SE | 31.10.2018 | SI | 31.10.2018 | SK | 31.10.2018 | SM | 31.10.2018 | TR | 31.10.2018 | IE | 02.12.2018 | LU | 02.12.2018 | BE | 31.12.2018 | BG | 31.01.2019 | NO | 31.01.2019 | GR | 01.02.2019 | IS | 28.02.2019 | PT | 01.03.2019 | [2020/31] |
Former [2020/17] | AL | 31.10.2018 | |
CZ | 31.10.2018 | ||
DK | 31.10.2018 | ||
EE | 31.10.2018 | ||
ES | 31.10.2018 | ||
FI | 31.10.2018 | ||
HR | 31.10.2018 | ||
IT | 31.10.2018 | ||
LT | 31.10.2018 | ||
LV | 31.10.2018 | ||
MC | 31.10.2018 | ||
MT | 31.10.2018 | ||
NL | 31.10.2018 | ||
PL | 31.10.2018 | ||
RO | 31.10.2018 | ||
RS | 31.10.2018 | ||
SE | 31.10.2018 | ||
SI | 31.10.2018 | ||
SK | 31.10.2018 | ||
SM | 31.10.2018 | ||
TR | 31.10.2018 | ||
IE | 02.12.2018 | ||
LU | 02.12.2018 | ||
BE | 31.12.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
GR | 01.02.2019 | ||
IS | 28.02.2019 | ||
PT | 01.03.2019 | ||
Former [2020/08] | AL | 31.10.2018 | |
CZ | 31.10.2018 | ||
DK | 31.10.2018 | ||
EE | 31.10.2018 | ||
ES | 31.10.2018 | ||
FI | 31.10.2018 | ||
HR | 31.10.2018 | ||
IT | 31.10.2018 | ||
LT | 31.10.2018 | ||
LV | 31.10.2018 | ||
MC | 31.10.2018 | ||
MT | 31.10.2018 | ||
NL | 31.10.2018 | ||
PL | 31.10.2018 | ||
RO | 31.10.2018 | ||
RS | 31.10.2018 | ||
SE | 31.10.2018 | ||
SI | 31.10.2018 | ||
SK | 31.10.2018 | ||
SM | 31.10.2018 | ||
IE | 02.12.2018 | ||
LU | 02.12.2018 | ||
BE | 31.12.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
GR | 01.02.2019 | ||
IS | 28.02.2019 | ||
PT | 01.03.2019 | ||
Former [2019/50] | AL | 31.10.2018 | |
CZ | 31.10.2018 | ||
DK | 31.10.2018 | ||
EE | 31.10.2018 | ||
ES | 31.10.2018 | ||
FI | 31.10.2018 | ||
HR | 31.10.2018 | ||
IT | 31.10.2018 | ||
LT | 31.10.2018 | ||
LV | 31.10.2018 | ||
MC | 31.10.2018 | ||
NL | 31.10.2018 | ||
PL | 31.10.2018 | ||
RO | 31.10.2018 | ||
RS | 31.10.2018 | ||
SE | 31.10.2018 | ||
SI | 31.10.2018 | ||
SK | 31.10.2018 | ||
SM | 31.10.2018 | ||
IE | 02.12.2018 | ||
LU | 02.12.2018 | ||
BE | 31.12.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
GR | 01.02.2019 | ||
IS | 28.02.2019 | ||
PT | 01.03.2019 | ||
Former [2019/48] | AL | 31.10.2018 | |
CZ | 31.10.2018 | ||
DK | 31.10.2018 | ||
EE | 31.10.2018 | ||
ES | 31.10.2018 | ||
FI | 31.10.2018 | ||
HR | 31.10.2018 | ||
IT | 31.10.2018 | ||
LT | 31.10.2018 | ||
LV | 31.10.2018 | ||
MC | 31.10.2018 | ||
NL | 31.10.2018 | ||
PL | 31.10.2018 | ||
RO | 31.10.2018 | ||
RS | 31.10.2018 | ||
SE | 31.10.2018 | ||
SK | 31.10.2018 | ||
SM | 31.10.2018 | ||
IE | 02.12.2018 | ||
LU | 02.12.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
GR | 01.02.2019 | ||
IS | 28.02.2019 | ||
PT | 01.03.2019 | ||
Former [2019/40] | AL | 31.10.2018 | |
CZ | 31.10.2018 | ||
DK | 31.10.2018 | ||
EE | 31.10.2018 | ||
ES | 31.10.2018 | ||
FI | 31.10.2018 | ||
HR | 31.10.2018 | ||
IT | 31.10.2018 | ||
LT | 31.10.2018 | ||
LV | 31.10.2018 | ||
MC | 31.10.2018 | ||
NL | 31.10.2018 | ||
PL | 31.10.2018 | ||
RO | 31.10.2018 | ||
RS | 31.10.2018 | ||
SE | 31.10.2018 | ||
SK | 31.10.2018 | ||
SM | 31.10.2018 | ||
LU | 02.12.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
GR | 01.02.2019 | ||
IS | 28.02.2019 | ||
PT | 01.03.2019 | ||
Former [2019/39] | AL | 31.10.2018 | |
CZ | 31.10.2018 | ||
DK | 31.10.2018 | ||
EE | 31.10.2018 | ||
ES | 31.10.2018 | ||
FI | 31.10.2018 | ||
HR | 31.10.2018 | ||
IT | 31.10.2018 | ||
LT | 31.10.2018 | ||
LV | 31.10.2018 | ||
NL | 31.10.2018 | ||
PL | 31.10.2018 | ||
RO | 31.10.2018 | ||
RS | 31.10.2018 | ||
SE | 31.10.2018 | ||
SK | 31.10.2018 | ||
SM | 31.10.2018 | ||
LU | 02.12.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
GR | 01.02.2019 | ||
IS | 28.02.2019 | ||
PT | 01.03.2019 | ||
Former [2019/37] | AL | 31.10.2018 | |
CZ | 31.10.2018 | ||
DK | 31.10.2018 | ||
EE | 31.10.2018 | ||
ES | 31.10.2018 | ||
FI | 31.10.2018 | ||
HR | 31.10.2018 | ||
IT | 31.10.2018 | ||
LT | 31.10.2018 | ||
LV | 31.10.2018 | ||
NL | 31.10.2018 | ||
PL | 31.10.2018 | ||
RO | 31.10.2018 | ||
RS | 31.10.2018 | ||
SE | 31.10.2018 | ||
SM | 31.10.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
GR | 01.02.2019 | ||
IS | 28.02.2019 | ||
PT | 01.03.2019 | ||
Former [2019/35] | AL | 31.10.2018 | |
CZ | 31.10.2018 | ||
DK | 31.10.2018 | ||
ES | 31.10.2018 | ||
FI | 31.10.2018 | ||
HR | 31.10.2018 | ||
IT | 31.10.2018 | ||
LT | 31.10.2018 | ||
LV | 31.10.2018 | ||
NL | 31.10.2018 | ||
PL | 31.10.2018 | ||
RS | 31.10.2018 | ||
SE | 31.10.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
GR | 01.02.2019 | ||
IS | 28.02.2019 | ||
PT | 01.03.2019 | ||
Former [2019/34] | AL | 31.10.2018 | |
DK | 31.10.2018 | ||
ES | 31.10.2018 | ||
FI | 31.10.2018 | ||
HR | 31.10.2018 | ||
IT | 31.10.2018 | ||
LT | 31.10.2018 | ||
LV | 31.10.2018 | ||
NL | 31.10.2018 | ||
PL | 31.10.2018 | ||
RS | 31.10.2018 | ||
SE | 31.10.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
GR | 01.02.2019 | ||
IS | 28.02.2019 | ||
PT | 01.03.2019 | ||
Former [2019/26] | AL | 31.10.2018 | |
ES | 31.10.2018 | ||
FI | 31.10.2018 | ||
HR | 31.10.2018 | ||
LT | 31.10.2018 | ||
LV | 31.10.2018 | ||
NL | 31.10.2018 | ||
PL | 31.10.2018 | ||
RS | 31.10.2018 | ||
SE | 31.10.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
GR | 01.02.2019 | ||
IS | 28.02.2019 | ||
PT | 01.03.2019 | ||
Former [2019/25] | ES | 31.10.2018 | |
FI | 31.10.2018 | ||
HR | 31.10.2018 | ||
LT | 31.10.2018 | ||
LV | 31.10.2018 | ||
NL | 31.10.2018 | ||
PL | 31.10.2018 | ||
RS | 31.10.2018 | ||
SE | 31.10.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
GR | 01.02.2019 | ||
IS | 28.02.2019 | ||
Former [2019/24] | ES | 31.10.2018 | |
FI | 31.10.2018 | ||
HR | 31.10.2018 | ||
LT | 31.10.2018 | ||
LV | 31.10.2018 | ||
NL | 31.10.2018 | ||
PL | 31.10.2018 | ||
SE | 31.10.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
GR | 01.02.2019 | ||
IS | 28.02.2019 | ||
Former [2019/23] | ES | 31.10.2018 | |
FI | 31.10.2018 | ||
HR | 31.10.2018 | ||
LT | 31.10.2018 | ||
LV | 31.10.2018 | ||
NL | 31.10.2018 | ||
PL | 31.10.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
IS | 28.02.2019 | ||
Former [2019/22] | FI | 31.10.2018 | |
LT | 31.10.2018 | ||
PL | 31.10.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
IS | 28.02.2019 | ||
Former [2019/21] | FI | 31.10.2018 | |
LT | 31.10.2018 | ||
NO | 31.01.2019 | ||
IS | 28.02.2019 | ||
Former [2019/20] | LT | 31.10.2018 | |
NO | 31.01.2019 | Documents cited: | Search | [XA]US4838004 (ADELL ROBERT [US]) [X] 1,2,4,6-10 * figure 6 * [A] 3,5,11; | [X]US5783020 (KRESS RONALD D [US]) [X] 1 * figure 2 *; | [X]DE10218004 (JOHNSON CONTR INTERIORS GMBH [DE]) [X] 1 * figure 1 *; | [X]US8480148 (FORTIN HUGO [US], et al) [X] 1* figure 3 * |