blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3222886

EP3222886 - AXLE ASSEMBLY HAVING A LUBRICANT RESERVOIR [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  28.08.2020
Database last updated on 10.08.2024
FormerThe patent has been granted
Status updated on  20.09.2019
FormerGrant of patent is intended
Status updated on  07.05.2019
FormerRequest for examination was made
Status updated on  19.01.2018
FormerThe application has been published
Status updated on  25.08.2017
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
ArvinMeritor Technology, LLC
2135 West Maple Road
Troy, MI 48084 / US
[2017/39]
Inventor(s)01 / HAYES, Brian
191 Jefferson Road
Newark, OH 43055 / US
02 / MARTIN, Robert
29 South 30th Street
Newark, OH 43055 / US
 [2017/39]
Representative(s)Ayre, Nicola Unity
Withers & Rogers LLP
2 London Bridge
London SE1 9RA / GB
[N/P]
Former [2017/39]Jones, John Bryn
Withers & Rogers LLP
4 More London Riverside
London SE1 2AU / GB
Application number, filing date16204028.114.12.2016
[2017/39]
Priority number, dateUS20161507797023.03.2016         Original published format: US201615077970
[2017/39]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3222886
Date:27.09.2017
Language:EN
[2017/39]
Type: B1 Patent specification 
No.:EP3222886
Date:23.10.2019
Language:EN
[2019/43]
Search report(s)(Supplementary) European search report - dispatched on:EP13.06.2017
ClassificationIPC:F16H57/04
[2017/39]
CPC:
F16H57/045 (EP,US); F16H57/0424 (EP,CN,US); F16H48/08 (US);
F16H48/38 (CN); F16H57/031 (CN); F16H57/0423 (US);
F16H57/0457 (US); F16H57/0471 (EP,US); F16H57/0483 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/08]
Former [2017/39]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:ACHSENANORDNUNG MIT SCHMIERMITTELRESERVOIR[2017/39]
English:AXLE ASSEMBLY HAVING A LUBRICANT RESERVOIR[2017/39]
French:ENSEMBLE D'ESSIEU DOTÉ D'UN RÉSERVOIR DE LUBRIFIANT[2017/39]
Examination procedure14.12.2016Date on which the examining division has become responsible
09.01.2018Amendment by applicant (claims and/or description)
09.01.2018Examination requested  [2018/08]
08.05.2019Communication of intention to grant the patent
11.09.2019Fee for grant paid
11.09.2019Fee for publishing/printing paid
11.09.2019Receipt of the translation of the claim(s)
Opposition(s)24.07.2020No opposition filed within time limit [2020/40]
Fees paidRenewal fee
31.12.2018Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU14.12.2016
AL23.10.2019
AT23.10.2019
CY23.10.2019
CZ23.10.2019
DK23.10.2019
EE23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
IT23.10.2019
LT23.10.2019
LV23.10.2019
MC23.10.2019
MK23.10.2019
MT23.10.2019
NL23.10.2019
PL23.10.2019
RO23.10.2019
RS23.10.2019
SI23.10.2019
SK23.10.2019
SM23.10.2019
TR23.10.2019
IE14.12.2019
LU14.12.2019
BE31.12.2019
CH31.12.2019
LI31.12.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS23.02.2020
PT24.02.2020
[2022/32]
Former [2022/27]HU14.12.2016
AL23.10.2019
AT23.10.2019
CY23.10.2019
CZ23.10.2019
DK23.10.2019
EE23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
IT23.10.2019
LT23.10.2019
LV23.10.2019
MC23.10.2019
MT23.10.2019
NL23.10.2019
PL23.10.2019
RO23.10.2019
RS23.10.2019
SI23.10.2019
SK23.10.2019
SM23.10.2019
TR23.10.2019
IE14.12.2019
LU14.12.2019
BE31.12.2019
CH31.12.2019
LI31.12.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS23.02.2020
PT24.02.2020
Former [2021/34]HU14.12.2016
AL23.10.2019
AT23.10.2019
CY23.10.2019
CZ23.10.2019
DK23.10.2019
EE23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
IT23.10.2019
LT23.10.2019
LV23.10.2019
MC23.10.2019
MT23.10.2019
NL23.10.2019
PL23.10.2019
RO23.10.2019
RS23.10.2019
SI23.10.2019
SK23.10.2019
SM23.10.2019
IE14.12.2019
LU14.12.2019
BE31.12.2019
CH31.12.2019
LI31.12.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS23.02.2020
PT24.02.2020
Former [2021/32]HU14.12.2016
AL23.10.2019
AT23.10.2019
CY23.10.2019
CZ23.10.2019
DK23.10.2019
EE23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
IT23.10.2019
LT23.10.2019
LV23.10.2019
MC23.10.2019
NL23.10.2019
PL23.10.2019
RO23.10.2019
RS23.10.2019
SI23.10.2019
SK23.10.2019
SM23.10.2019
IE14.12.2019
LU14.12.2019
BE31.12.2019
CH31.12.2019
LI31.12.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS23.02.2020
PT24.02.2020
Former [2021/26]AL23.10.2019
AT23.10.2019
CY23.10.2019
CZ23.10.2019
DK23.10.2019
EE23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
IT23.10.2019
LT23.10.2019
LV23.10.2019
MC23.10.2019
NL23.10.2019
PL23.10.2019
RO23.10.2019
RS23.10.2019
SI23.10.2019
SK23.10.2019
SM23.10.2019
IE14.12.2019
LU14.12.2019
BE31.12.2019
CH31.12.2019
LI31.12.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS23.02.2020
PT24.02.2020
Former [2020/51]AL23.10.2019
AT23.10.2019
CZ23.10.2019
DK23.10.2019
EE23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
IT23.10.2019
LT23.10.2019
LV23.10.2019
MC23.10.2019
NL23.10.2019
PL23.10.2019
RO23.10.2019
RS23.10.2019
SI23.10.2019
SK23.10.2019
SM23.10.2019
IE14.12.2019
LU14.12.2019
BE31.12.2019
CH31.12.2019
LI31.12.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS23.02.2020
PT24.02.2020
Former [2020/46]AL23.10.2019
CZ23.10.2019
DK23.10.2019
EE23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
IT23.10.2019
LT23.10.2019
LV23.10.2019
MC23.10.2019
NL23.10.2019
PL23.10.2019
RO23.10.2019
RS23.10.2019
SK23.10.2019
SM23.10.2019
IE14.12.2019
LU14.12.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS23.02.2020
PT24.02.2020
Former [2020/39]AL23.10.2019
CZ23.10.2019
DK23.10.2019
EE23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
IT23.10.2019
LT23.10.2019
LV23.10.2019
MC23.10.2019
NL23.10.2019
PL23.10.2019
RO23.10.2019
RS23.10.2019
SK23.10.2019
SM23.10.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS23.02.2020
PT24.02.2020
Former [2020/38]AL23.10.2019
CZ23.10.2019
DK23.10.2019
EE23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
IT23.10.2019
LT23.10.2019
LV23.10.2019
NL23.10.2019
PL23.10.2019
RO23.10.2019
RS23.10.2019
SK23.10.2019
SM23.10.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS23.02.2020
PT24.02.2020
Former [2020/37]AL23.10.2019
CZ23.10.2019
DK23.10.2019
EE23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
LT23.10.2019
LV23.10.2019
NL23.10.2019
PL23.10.2019
RO23.10.2019
RS23.10.2019
SK23.10.2019
SM23.10.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS23.02.2020
PT24.02.2020
Former [2020/36]AL23.10.2019
CZ23.10.2019
DK23.10.2019
EE23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
LT23.10.2019
LV23.10.2019
NL23.10.2019
PL23.10.2019
RO23.10.2019
RS23.10.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS23.02.2020
PT24.02.2020
Former [2020/35]AL23.10.2019
CZ23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
LT23.10.2019
LV23.10.2019
NL23.10.2019
PL23.10.2019
RO23.10.2019
RS23.10.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS24.02.2020
PT24.02.2020
Former [2020/34]AL23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
LT23.10.2019
LV23.10.2019
NL23.10.2019
PL23.10.2019
RS23.10.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS24.02.2020
PT24.02.2020
Former [2020/32]AL23.10.2019
FI23.10.2019
HR23.10.2019
LT23.10.2019
LV23.10.2019
NL23.10.2019
PL23.10.2019
RS23.10.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS24.02.2020
PT24.02.2020
Former [2020/25]FI23.10.2019
HR23.10.2019
LT23.10.2019
LV23.10.2019
NL23.10.2019
PL23.10.2019
RS23.10.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS24.02.2020
PT24.02.2020
Former [2020/24]FI23.10.2019
LT23.10.2019
LV23.10.2019
NL23.10.2019
PL23.10.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS24.02.2020
PT24.02.2020
Former [2020/23]FI23.10.2019
LT23.10.2019
LV23.10.2019
NL23.10.2019
PL23.10.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
PT24.02.2020
Former [2020/22]FI23.10.2019
LT23.10.2019
NL23.10.2019
BG23.01.2020
NO23.01.2020
PT24.02.2020
Former [2020/21]NL23.10.2019
NO23.01.2020
Former [2020/20]NL23.10.2019
Documents cited:Search[A]JP2008089040  (JTEKT CORP) [A] 1,15 * figure 2 *;
 [A]EP2551554  (ARVINMERITOR TECHNOLOGY LLC [US]) [A] 1-15 * figures 4,5,8 *;
 [A]US2015354691  (KEENEY CHRISTOPHER [US], et al) [A] 1-15 * paragraph [0050]; figures 2,8 *;
 [AP]US2016290484  (LENCZEWSKI ADRIAN M [US], et al) [AP] 1* figure 3 *
by applicantUS2014243137
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.