EP3339219 - METHOD FOR TRANSFERRING BLISTER PACKS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 15.01.2021 Database last updated on 21.05.2024 | |
Former | The patent has been granted Status updated on 07.02.2020 | ||
Former | Grant of patent is intended Status updated on 01.10.2019 | ||
Former | Request for examination was made Status updated on 03.08.2018 | ||
Former | The application has been published Status updated on 25.05.2018 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Uhlmann Pac-Systeme GmbH & Co. KG Uhlmannstraße 14-18 88471 Laupheim / DE | [2020/13] |
Former [2018/26] | For all designated states UHLMANN PAC-SYSTEME GmbH & Co. KG Uhlmannstrasse 14-18 88471 Laupheim / DE | Inventor(s) | 01 /
Hähnel, Bernd Grünewaldstraße 4 76297 Stutensee / DE | [2018/26] | Representative(s) | Wächter, Jochen, et al Kroher-Strobel Rechts- und Patentanwälte PartmbB Bavariaring 20 80336 München / DE | [2018/26] | Application number, filing date | 16205613.9 | 21.12.2016 | [2018/26] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3339219 | Date: | 27.06.2018 | Language: | DE | [2018/26] | Type: | B1 Patent specification | No.: | EP3339219 | Date: | 11.03.2020 | Language: | DE | [2020/11] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 07.07.2017 | Classification | IPC: | B65G47/32, B65G47/28, B65G47/29, B65B35/36, B65B35/16 | [2018/26] | CPC: |
B65G47/915 (EP);
B65G47/904 (CN);
A61J1/035 (CN);
B65B35/18 (EP);
B65B35/24 (EP);
B65B59/04 (EP);
B65G47/918 (EP)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/36] |
Former [2018/26] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VERFAHREN ZUM ÜBERGEBEN VON BLISTERPACKUNGEN | [2018/26] | English: | METHOD FOR TRANSFERRING BLISTER PACKS | [2018/26] | French: | PROCÉDÉ DE TRANSFERT DE BLISTER | [2018/26] | Examination procedure | 21.12.2016 | Date on which the examining division has become responsible | 30.07.2018 | Amendment by applicant (claims and/or description) | 30.07.2018 | Examination requested [2018/36] | 02.10.2019 | Communication of intention to grant the patent | 27.12.2019 | Fee for grant paid | 27.12.2019 | Fee for publishing/printing paid | 27.12.2019 | Receipt of the translation of the claim(s) | Opposition(s) | 14.12.2020 | No opposition filed within time limit [2021/07] | Fees paid | Renewal fee | 21.12.2018 | Renewal fee patent year 03 | 18.12.2019 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 21.12.2016 | AL | 11.03.2020 | CY | 11.03.2020 | CZ | 11.03.2020 | DK | 11.03.2020 | EE | 11.03.2020 | ES | 11.03.2020 | FI | 11.03.2020 | HR | 11.03.2020 | LT | 11.03.2020 | LV | 11.03.2020 | MC | 11.03.2020 | MK | 11.03.2020 | MT | 11.03.2020 | NL | 11.03.2020 | PL | 11.03.2020 | RO | 11.03.2020 | RS | 11.03.2020 | SE | 11.03.2020 | SI | 11.03.2020 | SK | 11.03.2020 | SM | 11.03.2020 | TR | 11.03.2020 | BG | 11.06.2020 | NO | 11.06.2020 | GR | 12.06.2020 | IS | 11.07.2020 | PT | 05.08.2020 | [2022/31] |
Former [2022/30] | HU | 21.12.2016 | |
AL | 11.03.2020 | ||
CY | 11.03.2020 | ||
CZ | 11.03.2020 | ||
DK | 11.03.2020 | ||
EE | 11.03.2020 | ||
ES | 11.03.2020 | ||
FI | 11.03.2020 | ||
HR | 11.03.2020 | ||
LT | 11.03.2020 | ||
LV | 11.03.2020 | ||
MC | 11.03.2020 | ||
MT | 11.03.2020 | ||
NL | 11.03.2020 | ||
PL | 11.03.2020 | ||
RO | 11.03.2020 | ||
RS | 11.03.2020 | ||
SE | 11.03.2020 | ||
SI | 11.03.2020 | ||
SK | 11.03.2020 | ||
SM | 11.03.2020 | ||
TR | 11.03.2020 | ||
BG | 11.06.2020 | ||
NO | 11.06.2020 | ||
GR | 12.06.2020 | ||
IS | 11.07.2020 | ||
PT | 05.08.2020 | ||
Former [2022/27] | HU | 21.12.2016 | |
CY | 11.03.2020 | ||
CZ | 11.03.2020 | ||
DK | 11.03.2020 | ||
EE | 11.03.2020 | ||
ES | 11.03.2020 | ||
FI | 11.03.2020 | ||
HR | 11.03.2020 | ||
LT | 11.03.2020 | ||
LV | 11.03.2020 | ||
MC | 11.03.2020 | ||
MT | 11.03.2020 | ||
NL | 11.03.2020 | ||
PL | 11.03.2020 | ||
RO | 11.03.2020 | ||
RS | 11.03.2020 | ||
SE | 11.03.2020 | ||
SI | 11.03.2020 | ||
SK | 11.03.2020 | ||
SM | 11.03.2020 | ||
TR | 11.03.2020 | ||
BG | 11.06.2020 | ||
NO | 11.06.2020 | ||
GR | 12.06.2020 | ||
IS | 11.07.2020 | ||
PT | 05.08.2020 | ||
Former [2021/40] | CZ | 11.03.2020 | |
DK | 11.03.2020 | ||
EE | 11.03.2020 | ||
ES | 11.03.2020 | ||
FI | 11.03.2020 | ||
HR | 11.03.2020 | ||
LT | 11.03.2020 | ||
LV | 11.03.2020 | ||
MC | 11.03.2020 | ||
NL | 11.03.2020 | ||
PL | 11.03.2020 | ||
RO | 11.03.2020 | ||
RS | 11.03.2020 | ||
SE | 11.03.2020 | ||
SI | 11.03.2020 | ||
SK | 11.03.2020 | ||
SM | 11.03.2020 | ||
BG | 11.06.2020 | ||
NO | 11.06.2020 | ||
GR | 12.06.2020 | ||
IS | 11.07.2020 | ||
PT | 05.08.2020 | ||
Former [2021/13] | CZ | 11.03.2020 | |
DK | 11.03.2020 | ||
EE | 11.03.2020 | ||
ES | 11.03.2020 | ||
FI | 11.03.2020 | ||
HR | 11.03.2020 | ||
LT | 11.03.2020 | ||
LV | 11.03.2020 | ||
NL | 11.03.2020 | ||
PL | 11.03.2020 | ||
RO | 11.03.2020 | ||
RS | 11.03.2020 | ||
SE | 11.03.2020 | ||
SI | 11.03.2020 | ||
SK | 11.03.2020 | ||
SM | 11.03.2020 | ||
BG | 11.06.2020 | ||
NO | 11.06.2020 | ||
GR | 12.06.2020 | ||
IS | 11.07.2020 | ||
PT | 05.08.2020 | ||
Former [2021/08] | CZ | 11.03.2020 | |
DK | 11.03.2020 | ||
EE | 11.03.2020 | ||
ES | 11.03.2020 | ||
FI | 11.03.2020 | ||
HR | 11.03.2020 | ||
LT | 11.03.2020 | ||
LV | 11.03.2020 | ||
NL | 11.03.2020 | ||
RO | 11.03.2020 | ||
RS | 11.03.2020 | ||
SE | 11.03.2020 | ||
SK | 11.03.2020 | ||
SM | 11.03.2020 | ||
BG | 11.06.2020 | ||
NO | 11.06.2020 | ||
GR | 12.06.2020 | ||
IS | 11.07.2020 | ||
PT | 05.08.2020 | ||
Former [2020/50] | CZ | 11.03.2020 | |
EE | 11.03.2020 | ||
FI | 11.03.2020 | ||
HR | 11.03.2020 | ||
LT | 11.03.2020 | ||
LV | 11.03.2020 | ||
NL | 11.03.2020 | ||
RO | 11.03.2020 | ||
RS | 11.03.2020 | ||
SE | 11.03.2020 | ||
SK | 11.03.2020 | ||
SM | 11.03.2020 | ||
BG | 11.06.2020 | ||
NO | 11.06.2020 | ||
GR | 12.06.2020 | ||
IS | 11.07.2020 | ||
PT | 05.08.2020 | ||
Former [2020/49] | CZ | 11.03.2020 | |
FI | 11.03.2020 | ||
HR | 11.03.2020 | ||
LT | 11.03.2020 | ||
LV | 11.03.2020 | ||
NL | 11.03.2020 | ||
RO | 11.03.2020 | ||
RS | 11.03.2020 | ||
SE | 11.03.2020 | ||
SK | 11.03.2020 | ||
SM | 11.03.2020 | ||
BG | 11.06.2020 | ||
NO | 11.06.2020 | ||
GR | 12.06.2020 | ||
IS | 11.07.2020 | ||
PT | 05.08.2020 | ||
Former [2020/48] | FI | 11.03.2020 | |
HR | 11.03.2020 | ||
LT | 11.03.2020 | ||
LV | 11.03.2020 | ||
NL | 11.03.2020 | ||
RO | 11.03.2020 | ||
RS | 11.03.2020 | ||
SE | 11.03.2020 | ||
SM | 11.03.2020 | ||
BG | 11.06.2020 | ||
NO | 11.06.2020 | ||
GR | 12.06.2020 | ||
IS | 11.07.2020 | ||
PT | 05.08.2020 | ||
Former [2020/47] | FI | 11.03.2020 | |
HR | 11.03.2020 | ||
LT | 11.03.2020 | ||
LV | 11.03.2020 | ||
NL | 11.03.2020 | ||
RS | 11.03.2020 | ||
SE | 11.03.2020 | ||
BG | 11.06.2020 | ||
NO | 11.06.2020 | ||
GR | 12.06.2020 | ||
IS | 11.07.2020 | ||
Former [2020/46] | FI | 11.03.2020 | |
HR | 11.03.2020 | ||
LV | 11.03.2020 | ||
NL | 11.03.2020 | ||
RS | 11.03.2020 | ||
SE | 11.03.2020 | ||
BG | 11.06.2020 | ||
NO | 11.06.2020 | ||
GR | 12.06.2020 | ||
IS | 11.07.2020 | ||
Former [2020/45] | FI | 11.03.2020 | |
HR | 11.03.2020 | ||
LV | 11.03.2020 | ||
NL | 11.03.2020 | ||
RS | 11.03.2020 | ||
SE | 11.03.2020 | ||
BG | 11.06.2020 | ||
NO | 11.06.2020 | ||
GR | 12.06.2020 | ||
Former [2020/39] | FI | 11.03.2020 | |
HR | 11.03.2020 | ||
LV | 11.03.2020 | ||
RS | 11.03.2020 | ||
SE | 11.03.2020 | ||
BG | 11.06.2020 | ||
NO | 11.06.2020 | ||
GR | 12.06.2020 | ||
Former [2020/38] | FI | 11.03.2020 | |
HR | 11.03.2020 | ||
LV | 11.03.2020 | ||
RS | 11.03.2020 | ||
SE | 11.03.2020 | ||
NO | 11.06.2020 | ||
GR | 12.06.2020 | ||
Former [2020/37] | FI | 11.03.2020 | |
HR | 11.03.2020 | ||
LV | 11.03.2020 | ||
RS | 11.03.2020 | ||
SE | 11.03.2020 | ||
NO | 11.06.2020 | ||
Former [2020/35] | FI | 11.03.2020 | |
NO | 11.06.2020 | Documents cited: | Search | [XA]EP1308388 (MARCHESINI GROUP SPA [IT]) [X] 1,2,5-9,12,13 * figures 1-10 * * paragraph [0025] - paragraph [0034] * * paragraph [0037] - paragraph [0043] * * paragraph [0046] * * paragraph [0054] - paragraph [0056] * [A] 3,4,10,11; | [XA]WO2014181307 (IMA SPA [IT]) [X] 1,3-8,10,12,13 * figures 1-7 * * page 4, line 13 - page 5, line 16 * * page 5, line 33 - page 6, line 6 * * page 7, line 10 - page 7, line 28 * * page 8, line 9 - page 8, line 22 *[A] 2,9,11 | by applicant | US8776984 |