blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3205434

EP3205434 - METHODS AND APPARATUS TO CONTROL A WELD CURRENT AMPERAGE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  28.05.2021
Database last updated on 06.07.2024
FormerThe patent has been granted
Status updated on  19.06.2020
FormerGrant of patent is intended
Status updated on  10.02.2020
FormerRequest for examination was made
Status updated on  14.07.2017
Most recent event   Tooltip15.07.2022Lapse of the patent in a contracting state
New state(s): BE
published on 17.08.2022  [2022/33]
Applicant(s)For all designated states
Illinois Tool Works, Inc.
155 Harlem Avenue
Glenview, Illinois 60025 / US
[2020/30]
Former [2017/33]For all designated states
Illinois Tool Works, Inc.
155 Harlem Avenue, Glenview
Illinois 60025 / US
Inventor(s)01 / ULRICH, James F.
155 Harlem Avenue
Glenview, Illinois, 60025 / US
02 / CASNER, Bruce A.
155 Harlem Avenue
Glenview, Illinois, 60025 / US
03 / STAPP, Zakary
155 Harlem Avenue
Glenview, Illinois, 60025 / US
 [2017/33]
Representative(s)Trinks, Ole
Meissner Bolte Patentanwälte
Rechtsanwälte Partnerschaft mbB
Postfach 10 26 05
86016 Augsburg / DE
[2017/33]
Application number, filing date16207451.230.12.2016
[2017/33]
Priority number, dateUS20161504063210.02.2016         Original published format: US201615040632
[2017/33]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3205434
Date:16.08.2017
Language:EN
[2017/33]
Type: B1 Patent specification 
No.:EP3205434
Date:22.07.2020
Language:EN
[2020/30]
Search report(s)(Supplementary) European search report - dispatched on:EP30.06.2017
ClassificationIPC:B23K9/095
[2017/33]
CPC:
B23K9/0953 (EP,CN,US); B23K9/013 (CN); B23K9/0956 (US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/33]
TitleGerman:VERFAHREN UND VORRICHTUNG ZUR STEUERUNG VON EINER SCHWEISSSTROMSTÄRKE[2017/33]
English:METHODS AND APPARATUS TO CONTROL A WELD CURRENT AMPERAGE[2017/33]
French:PROCÉDÉS ET APPAREIL DE COMMANDE DE L'INTENSITÉ D'UN COURANT DE SOUDAGE[2017/33]
Examination procedure30.12.2016Examination requested  [2017/33]
30.12.2016Date on which the examining division has become responsible
29.01.2018Amendment by applicant (claims and/or description)
11.02.2020Communication of intention to grant the patent
10.06.2020Fee for grant paid
10.06.2020Fee for publishing/printing paid
10.06.2020Receipt of the translation of the claim(s)
Opposition(s)23.04.2021No opposition filed within time limit [2021/26]
Fees paidRenewal fee
31.12.2018Renewal fee patent year 03
27.12.2019Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU30.12.2016
AL22.07.2020
AT22.07.2020
CY22.07.2020
CZ22.07.2020
DK22.07.2020
EE22.07.2020
ES22.07.2020
FI22.07.2020
HR22.07.2020
LT22.07.2020
LV22.07.2020
MC22.07.2020
MK22.07.2020
MT22.07.2020
NL22.07.2020
PL22.07.2020
RO22.07.2020
RS22.07.2020
SE22.07.2020
SI22.07.2020
SK22.07.2020
SM22.07.2020
TR22.07.2020
BG22.10.2020
NO22.10.2020
GR23.10.2020
IS22.11.2020
PT23.11.2020
IE30.12.2020
LU30.12.2020
BE31.12.2020
CH31.12.2020
FR31.12.2020
LI31.12.2020
[2022/33]
Former [2022/32]HU30.12.2016
AL22.07.2020
AT22.07.2020
CY22.07.2020
CZ22.07.2020
DK22.07.2020
EE22.07.2020
ES22.07.2020
FI22.07.2020
HR22.07.2020
LT22.07.2020
LV22.07.2020
MC22.07.2020
MK22.07.2020
MT22.07.2020
NL22.07.2020
PL22.07.2020
RO22.07.2020
RS22.07.2020
SE22.07.2020
SI22.07.2020
SK22.07.2020
SM22.07.2020
TR22.07.2020
BG22.10.2020
NO22.10.2020
GR23.10.2020
IS22.11.2020
PT23.11.2020
IE30.12.2020
LU30.12.2020
CH31.12.2020
FR31.12.2020
LI31.12.2020
Former [2022/27]HU30.12.2016
AL22.07.2020
AT22.07.2020
CY22.07.2020
CZ22.07.2020
DK22.07.2020
EE22.07.2020
ES22.07.2020
FI22.07.2020
HR22.07.2020
LT22.07.2020
LV22.07.2020
MC22.07.2020
MT22.07.2020
NL22.07.2020
PL22.07.2020
RO22.07.2020
RS22.07.2020
SE22.07.2020
SI22.07.2020
SK22.07.2020
SM22.07.2020
TR22.07.2020
BG22.10.2020
NO22.10.2020
GR23.10.2020
IS22.11.2020
PT23.11.2020
IE30.12.2020
LU30.12.2020
CH31.12.2020
FR31.12.2020
LI31.12.2020
Former [2021/52]AL22.07.2020
AT22.07.2020
CZ22.07.2020
DK22.07.2020
EE22.07.2020
ES22.07.2020
FI22.07.2020
HR22.07.2020
LT22.07.2020
LV22.07.2020
MC22.07.2020
NL22.07.2020
PL22.07.2020
RO22.07.2020
RS22.07.2020
SE22.07.2020
SI22.07.2020
SK22.07.2020
SM22.07.2020
BG22.10.2020
NO22.10.2020
GR23.10.2020
IS22.11.2020
PT23.11.2020
IE30.12.2020
LU30.12.2020
CH31.12.2020
FR31.12.2020
LI31.12.2020
Former [2021/48]AL22.07.2020
AT22.07.2020
CZ22.07.2020
DK22.07.2020
EE22.07.2020
ES22.07.2020
FI22.07.2020
HR22.07.2020
LT22.07.2020
LV22.07.2020
MC22.07.2020
NL22.07.2020
PL22.07.2020
RO22.07.2020
RS22.07.2020
SE22.07.2020
SI22.07.2020
SK22.07.2020
SM22.07.2020
BG22.10.2020
NO22.10.2020
GR23.10.2020
IS22.11.2020
PT23.11.2020
IE30.12.2020
LU30.12.2020
FR31.12.2020
Former [2021/46]AL22.07.2020
AT22.07.2020
CZ22.07.2020
DK22.07.2020
EE22.07.2020
ES22.07.2020
FI22.07.2020
HR22.07.2020
LT22.07.2020
LV22.07.2020
MC22.07.2020
NL22.07.2020
PL22.07.2020
RO22.07.2020
RS22.07.2020
SE22.07.2020
SI22.07.2020
SK22.07.2020
SM22.07.2020
BG22.10.2020
NO22.10.2020
GR23.10.2020
IS22.11.2020
PT23.11.2020
IE30.12.2020
LU30.12.2020
Former [2021/40]AL22.07.2020
AT22.07.2020
CZ22.07.2020
DK22.07.2020
EE22.07.2020
ES22.07.2020
FI22.07.2020
HR22.07.2020
LT22.07.2020
LV22.07.2020
MC22.07.2020
NL22.07.2020
PL22.07.2020
RO22.07.2020
RS22.07.2020
SE22.07.2020
SI22.07.2020
SK22.07.2020
SM22.07.2020
BG22.10.2020
NO22.10.2020
GR23.10.2020
IS22.11.2020
PT23.11.2020
Former [2021/36]AL22.07.2020
AT22.07.2020
CZ22.07.2020
DK22.07.2020
EE22.07.2020
ES22.07.2020
FI22.07.2020
HR22.07.2020
LT22.07.2020
LV22.07.2020
NL22.07.2020
PL22.07.2020
RO22.07.2020
RS22.07.2020
SE22.07.2020
SI22.07.2020
SK22.07.2020
SM22.07.2020
BG22.10.2020
NO22.10.2020
GR23.10.2020
IS22.11.2020
PT23.11.2020
Former [2021/28]AL22.07.2020
AT22.07.2020
CZ22.07.2020
DK22.07.2020
EE22.07.2020
ES22.07.2020
FI22.07.2020
HR22.07.2020
LT22.07.2020
LV22.07.2020
NL22.07.2020
PL22.07.2020
RO22.07.2020
RS22.07.2020
SE22.07.2020
SK22.07.2020
SM22.07.2020
BG22.10.2020
NO22.10.2020
GR23.10.2020
IS22.11.2020
PT23.11.2020
Former [2021/25]AL22.07.2020
AT22.07.2020
CZ22.07.2020
DK22.07.2020
EE22.07.2020
ES22.07.2020
FI22.07.2020
HR22.07.2020
LT22.07.2020
LV22.07.2020
NL22.07.2020
PL22.07.2020
RO22.07.2020
RS22.07.2020
SE22.07.2020
SM22.07.2020
BG22.10.2020
NO22.10.2020
GR23.10.2020
IS22.11.2020
PT23.11.2020
Former [2021/22]AT22.07.2020
CZ22.07.2020
DK22.07.2020
EE22.07.2020
ES22.07.2020
FI22.07.2020
HR22.07.2020
LT22.07.2020
LV22.07.2020
NL22.07.2020
PL22.07.2020
RO22.07.2020
RS22.07.2020
SE22.07.2020
SM22.07.2020
BG22.10.2020
NO22.10.2020
GR23.10.2020
IS22.11.2020
PT23.11.2020
Former [2021/21]AT22.07.2020
DK22.07.2020
ES22.07.2020
FI22.07.2020
HR22.07.2020
LT22.07.2020
LV22.07.2020
NL22.07.2020
PL22.07.2020
RS22.07.2020
SE22.07.2020
BG22.10.2020
NO22.10.2020
GR23.10.2020
IS22.11.2020
PT23.11.2020
Former [2021/17]AT22.07.2020
ES22.07.2020
FI22.07.2020
HR22.07.2020
LT22.07.2020
LV22.07.2020
NL22.07.2020
PL22.07.2020
RS22.07.2020
SE22.07.2020
BG22.10.2020
NO22.10.2020
GR23.10.2020
IS22.11.2020
PT23.11.2020
Former [2021/10]AT22.07.2020
ES22.07.2020
FI22.07.2020
HR22.07.2020
LT22.07.2020
LV22.07.2020
PL22.07.2020
RS22.07.2020
SE22.07.2020
BG22.10.2020
NO22.10.2020
GR23.10.2020
IS22.11.2020
PT23.11.2020
Former [2021/09]AT22.07.2020
ES22.07.2020
FI22.07.2020
LT22.07.2020
SE22.07.2020
BG22.10.2020
NO22.10.2020
GR23.10.2020
PT23.11.2020
Former [2021/08]ES22.07.2020
FI22.07.2020
LT22.07.2020
SE22.07.2020
BG22.10.2020
NO22.10.2020
PT23.11.2020
Former [2021/07]FI22.07.2020
LT22.07.2020
NO22.10.2020
Documents cited:Search[A]US6930280  (ZAUNER MICHAEL [AT], et al) [A] 1-15* abstract *;
 [A]EP1604767  (MATSUSHITA ELECTRIC IND CO LTD [JP]) [A] 1-15 * abstract *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.