EP3199859 - SUBMERSIBLE PUMP ASSEMBLY FOR DISPENSING LIQUEFIED GAS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 02.04.2022 Database last updated on 19.07.2024 | |
Former | The patent has been granted Status updated on 23.04.2021 | ||
Former | Grant of patent is intended Status updated on 11.01.2021 | ||
Former | Examination is in progress Status updated on 18.05.2019 | ||
Former | Request for examination was made Status updated on 09.02.2018 | ||
Former | The application has been published Status updated on 04.07.2017 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states Cryostar SAS 2 Rue de l'Industrie, ZI BP 48 68220 Hesingue / FR | [2021/21] |
Former [2017/31] | For all designated states Cryostar SAS 2 Rue de l'Industrie, ZI BP 48 68220 Hesingue / FR | Inventor(s) | 01 /
OURY, Simon 6, rue du Jura 68300 Saint-Louis / FR | [2017/31] | Representative(s) | Meilinger, Claudia Sabine, et al Linde GmbH Intellectual Property EMEA Dr.-Carl-von-Linde-Straße 6-14 82049 Pullach / DE | [2021/21] |
Former [2017/31] | Cabinet Plasseraud 66 rue de la Chaussée d'Antin 75440 Paris Cedex 09 / FR | Application number, filing date | 16305092.5 | 29.01.2016 | [2017/31] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3199859 | Date: | 02.08.2017 | Language: | EN | [2017/31] | Type: | B1 Patent specification | No.: | EP3199859 | Date: | 26.05.2021 | Language: | EN | [2021/21] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 01.07.2016 | Classification | IPC: | F17C9/00 | [2017/31] | CPC: |
F17C9/00 (EP,RU,US);
F17C6/00 (EP,US);
F17C2201/0109 (EP,US);
F17C2201/035 (EP,US);
F17C2201/054 (EP,US);
F17C2205/0332 (EP,US);
F17C2221/011 (EP,US);
F17C2221/012 (EP,US);
F17C2221/014 (EP,US);
F17C2221/017 (EP,US);
F17C2221/033 (EP,US);
F17C2221/035 (EP,US);
F17C2223/0153 (EP,US);
F17C2223/0161 (EP,US);
F17C2223/033 (EP,US);
F17C2223/043 (EP,US);
F17C2223/047 (EP,US);
F17C2225/0153 (EP,US);
F17C2225/0161 (EP,US);
F17C2225/033 (EP,US);
F17C2225/035 (EP,US);
F17C2227/015 (EP,US);
F17C2227/0178 (EP,US);
F17C2227/0304 (EP,US);
F17C2227/0309 (EP,US);
F17C2227/0341 (EP,US);
F17C2227/0379 (EP,US);
F17C2227/039 (EP,US);
F17C2250/032 (EP,US);
F17C2250/043 (EP,US);
F17C2250/0439 (EP,US);
F17C2250/0443 (EP,US);
F17C2250/0491 (EP,US);
F17C2250/0626 (EP,US);
F17C2250/0631 (EP,US);
F17C2250/0636 (EP,US);
F17C2260/035 (EP,US);
F17C2265/061 (EP,US);
F17C2265/065 (EP,US);
F17C2265/066 (EP,US);
F17C2270/0105 (EP,US);
F17C2270/0139 (EP,US);
F17C2270/0168 (EP,US);
F17C2270/0171 (EP,US);
F17C2270/0173 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/11] |
Former [2017/31] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | TAUCHPUMPE ZUR ABGABE VON VERFLÜSSIGTEM GAS | [2017/31] | English: | SUBMERSIBLE PUMP ASSEMBLY FOR DISPENSING LIQUEFIED GAS | [2017/31] | French: | POMP SUBMERSIBLE POUR LA DISTRIBUTION DE GAZ LIQUÉFIÉ | [2017/31] | Examination procedure | 29.01.2016 | Date on which the examining division has become responsible | 02.02.2018 | Amendment by applicant (claims and/or description) | 02.02.2018 | Examination requested [2018/11] | 22.05.2019 | Despatch of a communication from the examining division (Time limit: M04) | 15.07.2019 | Reply to a communication from the examining division | 18.05.2020 | Despatch of a communication from the examining division (Time limit: M04) | 22.09.2020 | Reply to a communication from the examining division | 12.01.2021 | Communication of intention to grant the patent | 20.04.2021 | Fee for grant paid | 20.04.2021 | Fee for publishing/printing paid | 20.04.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 01.03.2022 | No opposition filed within time limit [2022/18] | Fees paid | Renewal fee | 15.01.2018 | Renewal fee patent year 03 | 15.01.2019 | Renewal fee patent year 04 | 23.01.2020 | Renewal fee patent year 05 | 21.01.2021 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 29.01.2016 | AL | 26.05.2021 | CY | 26.05.2021 | DK | 26.05.2021 | EE | 26.05.2021 | HR | 26.05.2021 | LT | 26.05.2021 | LV | 26.05.2021 | MC | 26.05.2021 | MK | 26.05.2021 | RO | 26.05.2021 | RS | 26.05.2021 | SI | 26.05.2021 | SK | 26.05.2021 | SM | 26.05.2021 | BG | 26.08.2021 | NO | 26.08.2021 | GR | 27.08.2021 | IS | 26.09.2021 | IE | 29.01.2022 | [2024/22] |
Former [2024/20] | HU | 29.01.2016 | |
AL | 26.05.2021 | ||
CY | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
IE | 29.01.2022 | ||
Former [2024/18] | HU | 29.01.2016 | |
AL | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
IE | 29.01.2022 | ||
Former [2023/09] | AL | 26.05.2021 | |
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
IE | 29.01.2022 | ||
Former [2022/39] | AL | 26.05.2021 | |
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
Former [2022/29] | AL | 26.05.2021 | |
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
Former [2022/26] | AL | 26.05.2021 | |
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
Former [2022/23] | DK | 26.05.2021 | |
EE | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
Former [2022/10] | DK | 26.05.2021 | |
EE | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 22.12.2021 | ||
Former [2022/08] | DK | 26.05.2021 | |
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
RS | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
Former [2022/07] | HR | 26.05.2021 | |
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
RS | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
Former [2021/51] | HR | 26.05.2021 | |
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
RS | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
Former [2021/49] | HR | 26.05.2021 | |
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
Former [2021/47] | LT | 26.05.2021 | |
BG | 26.08.2021 | ||
Former [2021/46] | LT | 26.05.2021 | Documents cited: | Search | [A]GB1016555 (BRITISH OXYGEN CO LTD) [A] 1-18* fig.1, (6), (13), (18)-(20); p.2, l.52-79 *; | [A]EP0222233 (KLEIN SCHANZLIN & BECKER AG [DE]) [A] 1-18 * fig.2, (1), (4), (11); Column 3, lines 12-19;; claim 1 *; | [A]US5865605 (WEIDLEIN GLENN L [US]) [A] 1-18 * fig.1, (32), (30), (40), (20), (48), (58) *; | [Y]EP1018601 (AIR PROD & CHEM [US]) [Y] 1-18 * fig.1, (44); [0047], [0049] *; | [Y]US2008156382 (CHO HYUN [US]) [Y] 1-18 * fig.1, (10), (20), (30), (40), (150); fig.8, (480); [0005], [0006] *; | [A]WO2015077784 (CHART INC [US]) [A] 1-18 * fig.1, (105), (110), (115); fig.2, (110), (220), (205) *; | [A]US2015276130 (HALL IVAN KEITH [US], et al) [A] 1-18 * fig.1, (116), (118), (120), (114), (128), (110) * | Examination | US7293418 | US2009129946 |