EP3249815 - CIRCUIT ARRANGEMENT FOR FAST TURN-OFF OF BI-DIRECTIONAL SWITCHING DEVICE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 10.07.2020 Database last updated on 12.06.2024 | |
Former | The patent has been granted Status updated on 26.07.2019 | ||
Former | Grant of patent is intended Status updated on 04.07.2019 | ||
Former | Request for examination was made Status updated on 14.06.2019 | ||
Former | Grant of patent is intended Status updated on 22.04.2019 | ||
Former | Request for examination was made Status updated on 01.06.2018 | ||
Former | The application has been published Status updated on 27.10.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states NXP USA, Inc. 6501 William Cannon Drive West Austin TX 78735 / US | [2017/48] | Inventor(s) | 01 /
STEFANOV, Evgueniy Nikolov NPX B.V. High Tech Campus 60 5656 AG Eindhoven / NL | 02 /
GUILLOT, Laurent NPX B.V. High Tech Campus 60 5656 AG Eindhoven / NL | [2017/48] | Representative(s) | Hardingham, Christopher Mark, et al NXP Semiconductors Intellectual Property Group Abbey House 25 Clarendon Road Redhill, Surrey RH1 1QZ / GB | [N/P] |
Former [2017/48] | Pomper, Till NXP Semiconductors Germany GmbH Schatzbogen 7 81829 München / DE | Application number, filing date | 16305587.4 | 23.05.2016 | [2017/48] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3249815 | Date: | 29.11.2017 | Language: | EN | [2017/48] | Type: | B1 Patent specification | No.: | EP3249815 | Date: | 28.08.2019 | Language: | EN | [2019/35] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 07.11.2016 | Classification | IPC: | H03K17/10, H01L27/06, H01L29/78 | [2017/48] | CPC: |
H03K17/04106 (EP,US);
H01L27/04 (CN);
H01L27/0617 (CN);
H01L27/0727 (US);
H01L29/086 (EP,US);
H01L29/0865 (EP,US);
H01L29/402 (US);
H01L29/407 (EP,US);
H01L29/7802 (US);
H01L29/7813 (EP,US);
H03K17/102 (EP,US);
H03K5/08 (EP,US);
H03K2217/0009 (EP,US);
H03K2217/0018 (EP,US);
H03K2217/0054 (EP,US);
Y02B70/10 (EP)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/27] |
Former [2017/48] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | SCHALTUNGSANORDNUNG ZUM SCHNELLEN ABSCHALTEN EINER BIDIREKTIONALEN SCHALTVORRICHTUNG | [2017/48] | English: | CIRCUIT ARRANGEMENT FOR FAST TURN-OFF OF BI-DIRECTIONAL SWITCHING DEVICE | [2017/48] | French: | AGENCEMENT DE CIRCUIT DE MISE HORS TENSION RAPIDE DE DISPOSITIF DE COMMUTATION BIDIRECTIONNEL | [2017/48] | Examination procedure | 23.05.2016 | Date on which the examining division has become responsible | 28.02.2017 | Amendment by applicant (claims and/or description) | 29.05.2018 | Examination requested [2018/27] | 23.04.2019 | Communication of intention to grant the patent | 10.06.2019 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 05.07.2019 | Communication of intention to grant the patent | 18.07.2019 | Fee for grant paid | 18.07.2019 | Fee for publishing/printing paid | 18.07.2019 | Receipt of the translation of the claim(s) | Opposition(s) | 03.06.2020 | No opposition filed within time limit [2020/33] | Fees paid | Renewal fee | 01.06.2018 | Renewal fee patent year 03 | 31.05.2019 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 23.05.2016 | AL | 28.08.2019 | AT | 28.08.2019 | CY | 28.08.2019 | CZ | 28.08.2019 | DK | 28.08.2019 | EE | 28.08.2019 | ES | 28.08.2019 | FI | 28.08.2019 | HR | 28.08.2019 | IT | 28.08.2019 | LT | 28.08.2019 | LV | 28.08.2019 | MC | 28.08.2019 | MK | 28.08.2019 | MT | 28.08.2019 | NL | 28.08.2019 | PL | 28.08.2019 | RO | 28.08.2019 | RS | 28.08.2019 | SE | 28.08.2019 | SI | 28.08.2019 | SK | 28.08.2019 | SM | 28.08.2019 | TR | 28.08.2019 | BG | 28.11.2019 | NO | 28.11.2019 | GR | 29.11.2019 | IS | 28.12.2019 | PT | 30.12.2019 | GB | 23.05.2020 | IE | 23.05.2020 | LU | 23.05.2020 | BE | 31.05.2020 | CH | 31.05.2020 | FR | 31.05.2020 | LI | 31.05.2020 | [2022/32] |
Former [2022/28] | HU | 23.05.2016 | |
AL | 28.08.2019 | ||
AT | 28.08.2019 | ||
CY | 28.08.2019 | ||
CZ | 28.08.2019 | ||
DK | 28.08.2019 | ||
EE | 28.08.2019 | ||
ES | 28.08.2019 | ||
FI | 28.08.2019 | ||
HR | 28.08.2019 | ||
IT | 28.08.2019 | ||
LT | 28.08.2019 | ||
LV | 28.08.2019 | ||
MC | 28.08.2019 | ||
MT | 28.08.2019 | ||
NL | 28.08.2019 | ||
PL | 28.08.2019 | ||
RO | 28.08.2019 | ||
RS | 28.08.2019 | ||
SE | 28.08.2019 | ||
SI | 28.08.2019 | ||
SK | 28.08.2019 | ||
SM | 28.08.2019 | ||
TR | 28.08.2019 | ||
BG | 28.11.2019 | ||
NO | 28.11.2019 | ||
GR | 29.11.2019 | ||
IS | 28.12.2019 | ||
PT | 30.12.2019 | ||
GB | 23.05.2020 | ||
IE | 23.05.2020 | ||
LU | 23.05.2020 | ||
BE | 31.05.2020 | ||
CH | 31.05.2020 | ||
FR | 31.05.2020 | ||
LI | 31.05.2020 | ||
Former [2021/23] | AL | 28.08.2019 | |
AT | 28.08.2019 | ||
CZ | 28.08.2019 | ||
DK | 28.08.2019 | ||
EE | 28.08.2019 | ||
ES | 28.08.2019 | ||
FI | 28.08.2019 | ||
HR | 28.08.2019 | ||
IT | 28.08.2019 | ||
LT | 28.08.2019 | ||
LV | 28.08.2019 | ||
MC | 28.08.2019 | ||
NL | 28.08.2019 | ||
PL | 28.08.2019 | ||
RO | 28.08.2019 | ||
RS | 28.08.2019 | ||
SE | 28.08.2019 | ||
SI | 28.08.2019 | ||
SK | 28.08.2019 | ||
SM | 28.08.2019 | ||
TR | 28.08.2019 | ||
BG | 28.11.2019 | ||
NO | 28.11.2019 | ||
GR | 29.11.2019 | ||
IS | 28.12.2019 | ||
PT | 30.12.2019 | ||
GB | 23.05.2020 | ||
IE | 23.05.2020 | ||
LU | 23.05.2020 | ||
BE | 31.05.2020 | ||
CH | 31.05.2020 | ||
FR | 31.05.2020 | ||
LI | 31.05.2020 | ||
Former [2021/22] | AL | 28.08.2019 | |
AT | 28.08.2019 | ||
CZ | 28.08.2019 | ||
DK | 28.08.2019 | ||
EE | 28.08.2019 | ||
ES | 28.08.2019 | ||
FI | 28.08.2019 | ||
HR | 28.08.2019 | ||
IT | 28.08.2019 | ||
LT | 28.08.2019 | ||
LV | 28.08.2019 | ||
MC | 28.08.2019 | ||
NL | 28.08.2019 | ||
PL | 28.08.2019 | ||
RO | 28.08.2019 | ||
RS | 28.08.2019 | ||
SE | 28.08.2019 | ||
SI | 28.08.2019 | ||
SK | 28.08.2019 | ||
SM | 28.08.2019 | ||
TR | 28.08.2019 | ||
BG | 28.11.2019 | ||
NO | 28.11.2019 | ||
GR | 29.11.2019 | ||
IS | 28.12.2019 | ||
PT | 30.12.2019 | ||
GB | 23.05.2020 | ||
IE | 23.05.2020 | ||
LU | 23.05.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
Former [2021/20] | AL | 28.08.2019 | |
AT | 28.08.2019 | ||
CZ | 28.08.2019 | ||
DK | 28.08.2019 | ||
EE | 28.08.2019 | ||
ES | 28.08.2019 | ||
FI | 28.08.2019 | ||
HR | 28.08.2019 | ||
IT | 28.08.2019 | ||
LT | 28.08.2019 | ||
LV | 28.08.2019 | ||
MC | 28.08.2019 | ||
NL | 28.08.2019 | ||
PL | 28.08.2019 | ||
RO | 28.08.2019 | ||
RS | 28.08.2019 | ||
SE | 28.08.2019 | ||
SI | 28.08.2019 | ||
SK | 28.08.2019 | ||
SM | 28.08.2019 | ||
TR | 28.08.2019 | ||
BG | 28.11.2019 | ||
NO | 28.11.2019 | ||
GR | 29.11.2019 | ||
IS | 28.12.2019 | ||
PT | 30.12.2019 | ||
IE | 23.05.2020 | ||
LU | 23.05.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
Former [2021/15] | AL | 28.08.2019 | |
AT | 28.08.2019 | ||
CZ | 28.08.2019 | ||
DK | 28.08.2019 | ||
EE | 28.08.2019 | ||
ES | 28.08.2019 | ||
FI | 28.08.2019 | ||
HR | 28.08.2019 | ||
IT | 28.08.2019 | ||
LT | 28.08.2019 | ||
LV | 28.08.2019 | ||
MC | 28.08.2019 | ||
NL | 28.08.2019 | ||
PL | 28.08.2019 | ||
RO | 28.08.2019 | ||
RS | 28.08.2019 | ||
SE | 28.08.2019 | ||
SI | 28.08.2019 | ||
SK | 28.08.2019 | ||
SM | 28.08.2019 | ||
TR | 28.08.2019 | ||
BG | 28.11.2019 | ||
NO | 28.11.2019 | ||
GR | 29.11.2019 | ||
IS | 28.12.2019 | ||
PT | 30.12.2019 | ||
LU | 23.05.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
Former [2021/12] | AL | 28.08.2019 | |
AT | 28.08.2019 | ||
CZ | 28.08.2019 | ||
DK | 28.08.2019 | ||
EE | 28.08.2019 | ||
ES | 28.08.2019 | ||
FI | 28.08.2019 | ||
HR | 28.08.2019 | ||
IT | 28.08.2019 | ||
LT | 28.08.2019 | ||
LV | 28.08.2019 | ||
MC | 28.08.2019 | ||
NL | 28.08.2019 | ||
PL | 28.08.2019 | ||
RO | 28.08.2019 | ||
RS | 28.08.2019 | ||
SE | 28.08.2019 | ||
SI | 28.08.2019 | ||
SK | 28.08.2019 | ||
SM | 28.08.2019 | ||
TR | 28.08.2019 | ||
BG | 28.11.2019 | ||
NO | 28.11.2019 | ||
GR | 29.11.2019 | ||
IS | 28.12.2019 | ||
PT | 30.12.2019 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
Former [2021/08] | AL | 28.08.2019 | |
AT | 28.08.2019 | ||
CZ | 28.08.2019 | ||
DK | 28.08.2019 | ||
EE | 28.08.2019 | ||
ES | 28.08.2019 | ||
FI | 28.08.2019 | ||
HR | 28.08.2019 | ||
IT | 28.08.2019 | ||
LT | 28.08.2019 | ||
LV | 28.08.2019 | ||
NL | 28.08.2019 | ||
PL | 28.08.2019 | ||
RO | 28.08.2019 | ||
RS | 28.08.2019 | ||
SE | 28.08.2019 | ||
SI | 28.08.2019 | ||
SK | 28.08.2019 | ||
SM | 28.08.2019 | ||
TR | 28.08.2019 | ||
BG | 28.11.2019 | ||
NO | 28.11.2019 | ||
GR | 29.11.2019 | ||
IS | 28.12.2019 | ||
PT | 30.12.2019 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
Former [2020/37] | AL | 28.08.2019 | |
AT | 28.08.2019 | ||
CZ | 28.08.2019 | ||
DK | 28.08.2019 | ||
EE | 28.08.2019 | ||
ES | 28.08.2019 | ||
FI | 28.08.2019 | ||
HR | 28.08.2019 | ||
IT | 28.08.2019 | ||
LT | 28.08.2019 | ||
LV | 28.08.2019 | ||
NL | 28.08.2019 | ||
PL | 28.08.2019 | ||
RO | 28.08.2019 | ||
RS | 28.08.2019 | ||
SE | 28.08.2019 | ||
SI | 28.08.2019 | ||
SK | 28.08.2019 | ||
SM | 28.08.2019 | ||
TR | 28.08.2019 | ||
BG | 28.11.2019 | ||
NO | 28.11.2019 | ||
GR | 29.11.2019 | ||
IS | 28.12.2019 | ||
PT | 30.12.2019 | ||
Former [2020/36] | AL | 28.08.2019 | |
AT | 28.08.2019 | ||
CZ | 28.08.2019 | ||
DK | 28.08.2019 | ||
EE | 28.08.2019 | ||
ES | 28.08.2019 | ||
FI | 28.08.2019 | ||
HR | 28.08.2019 | ||
IT | 28.08.2019 | ||
LT | 28.08.2019 | ||
LV | 28.08.2019 | ||
NL | 28.08.2019 | ||
PL | 28.08.2019 | ||
RO | 28.08.2019 | ||
RS | 28.08.2019 | ||
SE | 28.08.2019 | ||
SK | 28.08.2019 | ||
SM | 28.08.2019 | ||
TR | 28.08.2019 | ||
BG | 28.11.2019 | ||
NO | 28.11.2019 | ||
GR | 29.11.2019 | ||
IS | 28.12.2019 | ||
PT | 30.12.2019 | ||
Former [2020/27] | AL | 28.08.2019 | |
AT | 28.08.2019 | ||
CZ | 28.08.2019 | ||
DK | 28.08.2019 | ||
EE | 28.08.2019 | ||
ES | 28.08.2019 | ||
FI | 28.08.2019 | ||
HR | 28.08.2019 | ||
IT | 28.08.2019 | ||
LT | 28.08.2019 | ||
LV | 28.08.2019 | ||
NL | 28.08.2019 | ||
PL | 28.08.2019 | ||
RO | 28.08.2019 | ||
RS | 28.08.2019 | ||
SE | 28.08.2019 | ||
SK | 28.08.2019 | ||
SM | 28.08.2019 | ||
TR | 28.08.2019 | ||
BG | 28.11.2019 | ||
NO | 28.11.2019 | ||
GR | 29.11.2019 | ||
PT | 30.12.2019 | ||
IS | 24.02.2020 | ||
Former [2020/25] | AL | 28.08.2019 | |
AT | 28.08.2019 | ||
CZ | 28.08.2019 | ||
DK | 28.08.2019 | ||
EE | 28.08.2019 | ||
ES | 28.08.2019 | ||
FI | 28.08.2019 | ||
HR | 28.08.2019 | ||
IT | 28.08.2019 | ||
LT | 28.08.2019 | ||
LV | 28.08.2019 | ||
NL | 28.08.2019 | ||
PL | 28.08.2019 | ||
RO | 28.08.2019 | ||
RS | 28.08.2019 | ||
SE | 28.08.2019 | ||
SK | 28.08.2019 | ||
TR | 28.08.2019 | ||
BG | 28.11.2019 | ||
NO | 28.11.2019 | ||
GR | 29.11.2019 | ||
PT | 30.12.2019 | ||
IS | 24.02.2020 | ||
Former [2020/24] | AL | 28.08.2019 | |
AT | 28.08.2019 | ||
DK | 28.08.2019 | ||
EE | 28.08.2019 | ||
ES | 28.08.2019 | ||
FI | 28.08.2019 | ||
HR | 28.08.2019 | ||
IT | 28.08.2019 | ||
LT | 28.08.2019 | ||
LV | 28.08.2019 | ||
NL | 28.08.2019 | ||
PL | 28.08.2019 | ||
RO | 28.08.2019 | ||
RS | 28.08.2019 | ||
SE | 28.08.2019 | ||
TR | 28.08.2019 | ||
BG | 28.11.2019 | ||
NO | 28.11.2019 | ||
GR | 29.11.2019 | ||
PT | 30.12.2019 | ||
IS | 24.02.2020 | ||
Former [2020/23] | AL | 28.08.2019 | |
AT | 28.08.2019 | ||
DK | 28.08.2019 | ||
EE | 28.08.2019 | ||
ES | 28.08.2019 | ||
FI | 28.08.2019 | ||
HR | 28.08.2019 | ||
IT | 28.08.2019 | ||
LT | 28.08.2019 | ||
LV | 28.08.2019 | ||
NL | 28.08.2019 | ||
PL | 28.08.2019 | ||
RO | 28.08.2019 | ||
RS | 28.08.2019 | ||
SE | 28.08.2019 | ||
TR | 28.08.2019 | ||
BG | 28.11.2019 | ||
NO | 28.11.2019 | ||
GR | 29.11.2019 | ||
IS | 28.12.2019 | ||
PT | 30.12.2019 | ||
Former [2020/22] | AL | 28.08.2019 | |
DK | 28.08.2019 | ||
EE | 28.08.2019 | ||
ES | 28.08.2019 | ||
FI | 28.08.2019 | ||
HR | 28.08.2019 | ||
LT | 28.08.2019 | ||
LV | 28.08.2019 | ||
NL | 28.08.2019 | ||
RS | 28.08.2019 | ||
SE | 28.08.2019 | ||
TR | 28.08.2019 | ||
BG | 28.11.2019 | ||
NO | 28.11.2019 | ||
GR | 29.11.2019 | ||
IS | 28.12.2019 | ||
PT | 30.12.2019 | ||
Former [2020/17] | AL | 28.08.2019 | |
ES | 28.08.2019 | ||
FI | 28.08.2019 | ||
HR | 28.08.2019 | ||
LT | 28.08.2019 | ||
LV | 28.08.2019 | ||
NL | 28.08.2019 | ||
RS | 28.08.2019 | ||
SE | 28.08.2019 | ||
TR | 28.08.2019 | ||
BG | 28.11.2019 | ||
NO | 28.11.2019 | ||
GR | 29.11.2019 | ||
IS | 28.12.2019 | ||
PT | 30.12.2019 | ||
Former [2020/15] | AL | 28.08.2019 | |
ES | 28.08.2019 | ||
FI | 28.08.2019 | ||
HR | 28.08.2019 | ||
LT | 28.08.2019 | ||
LV | 28.08.2019 | ||
NL | 28.08.2019 | ||
RS | 28.08.2019 | ||
SE | 28.08.2019 | ||
BG | 28.11.2019 | ||
NO | 28.11.2019 | ||
GR | 29.11.2019 | ||
IS | 28.12.2019 | ||
PT | 30.12.2019 | ||
Former [2020/12] | ES | 28.08.2019 | |
FI | 28.08.2019 | ||
HR | 28.08.2019 | ||
LT | 28.08.2019 | ||
LV | 28.08.2019 | ||
NL | 28.08.2019 | ||
RS | 28.08.2019 | ||
SE | 28.08.2019 | ||
BG | 28.11.2019 | ||
NO | 28.11.2019 | ||
GR | 29.11.2019 | ||
IS | 28.12.2019 | ||
PT | 30.12.2019 | ||
Former [2020/10] | FI | 28.08.2019 | |
LT | 28.08.2019 | ||
NL | 28.08.2019 | ||
SE | 28.08.2019 | ||
BG | 28.11.2019 | ||
NO | 28.11.2019 | ||
PT | 30.12.2019 | ||
Former [2020/09] | FI | 28.08.2019 | |
LT | 28.08.2019 | ||
NL | 28.08.2019 | ||
NO | 28.11.2019 | ||
Former [2020/08] | LT | 28.08.2019 | |
NO | 28.11.2019 | Documents cited: | Search | [Y]WO0019540 (KONINKL PHILIPS ELECTRONICS NV [NL]) [Y] 3 * figures 1, 2 *; | [A]WO2007008934 (PEREGRINE SEMICONDUCTOR CORP [US], et al) [A] 1-10 * figures 4C, 4E *; | [IAY]US2007205431 (ROBB FRANCINE Y [US], et al) [I] 1,2 * figure 1 * [A] 4-10 [Y] 3; | [A]EP1887698 (SEMIKRON ELEKTRONIK GMBH [DE]) [A] 1-10 * figure 1a *; | [A]EP2533246 (LINEAR TECHN INC [US]) [A] 1-10* figures 15-24 *; | [A]EP2779455 (NXP BV [NL]) [A] 1-10 * paragraph [0036]; figures 4, 5 * |