EP3239089 - WIND TURBINE WITH ELEVATOR SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 15.11.2019 Database last updated on 12.07.2024 | |
Former | The patent has been granted Status updated on 07.12.2018 | ||
Former | Grant of patent is intended Status updated on 24.07.2018 | ||
Former | Request for examination was made Status updated on 11.05.2018 | ||
Former | The application has been published Status updated on 29.09.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Alimak Group Management AB Brunkebergstorg 5 111 51 Stockholm / SE | [2019/45] |
Former [2017/44] | For all designated states AIP APS Høgevej 19 3400 Hillerød / DK | Inventor(s) | 01 /
SACRAMENTO GARCÍA, Germán Manuel Los Angeles 88, Nave 1 50198 LA MUELA / ES | 02 /
COLOMA CALVO, Jesús Angel Los Angeles 88, Nave 1 50198 LA MUELA / ES | [2017/44] | Representative(s) | ZBM Patents - Zea, Barlocci & Markvardsen Rambla Catalunya, 123 08008 Barcelona / ES | [N/P] |
Former [2017/44] | ZBM Patents ApS Symbion Box:33 Fruebjergvej 3 2100 Copenhagen Ø / DK | Application number, filing date | 16382184.6 | 27.04.2016 | [2017/44] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3239089 | Date: | 01.11.2017 | Language: | EN | [2017/44] | Type: | B1 Patent specification | No.: | EP3239089 | Date: | 09.01.2019 | Language: | EN | [2019/02] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 10.10.2016 | Classification | IPC: | B66B7/06, B66B9/187 | [2017/44] | CPC: |
B66B7/064 (EP,US);
B66B5/02 (US);
B66B7/02 (US);
B66B7/08 (US);
B66B9/187 (EP,US);
F03D13/20 (US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/24] |
Former [2017/44] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | WINDRAD MIT AUFZUGSANLAGE | [2017/44] | English: | WIND TURBINE WITH ELEVATOR SYSTEM | [2017/44] | French: | TURBINE ÉOLIENNE PRÉSENTANT UN SYSTÈME D'ASCENSEUR | [2017/44] | Examination procedure | 27.04.2016 | Date on which the examining division has become responsible | 01.05.2018 | Amendment by applicant (claims and/or description) | 01.05.2018 | Examination requested [2018/24] | 25.07.2018 | Communication of intention to grant the patent | 27.11.2018 | Fee for grant paid | 27.11.2018 | Fee for publishing/printing paid | 27.11.2018 | Receipt of the translation of the claim(s) | Opposition(s) | 10.10.2019 | No opposition filed within time limit [2019/51] | Fees paid | Renewal fee | 26.04.2018 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 27.04.2016 | AL | 09.01.2019 | AT | 09.01.2019 | CY | 09.01.2019 | CZ | 09.01.2019 | EE | 09.01.2019 | ES | 09.01.2019 | FI | 09.01.2019 | HR | 09.01.2019 | IT | 09.01.2019 | LT | 09.01.2019 | LV | 09.01.2019 | MC | 09.01.2019 | MK | 09.01.2019 | MT | 09.01.2019 | PL | 09.01.2019 | RO | 09.01.2019 | RS | 09.01.2019 | SE | 09.01.2019 | SI | 09.01.2019 | SK | 09.01.2019 | SM | 09.01.2019 | TR | 09.01.2019 | BG | 09.04.2019 | NO | 09.04.2019 | GR | 10.04.2019 | IE | 27.04.2019 | LU | 27.04.2019 | CH | 30.04.2019 | LI | 30.04.2019 | IS | 09.05.2019 | PT | 09.05.2019 | [2022/32] |
Former [2021/34] | HU | 27.04.2016 | |
AL | 09.01.2019 | ||
AT | 09.01.2019 | ||
CY | 09.01.2019 | ||
CZ | 09.01.2019 | ||
EE | 09.01.2019 | ||
ES | 09.01.2019 | ||
FI | 09.01.2019 | ||
HR | 09.01.2019 | ||
IT | 09.01.2019 | ||
LT | 09.01.2019 | ||
LV | 09.01.2019 | ||
MC | 09.01.2019 | ||
MT | 09.01.2019 | ||
PL | 09.01.2019 | ||
RO | 09.01.2019 | ||
RS | 09.01.2019 | ||
SE | 09.01.2019 | ||
SI | 09.01.2019 | ||
SK | 09.01.2019 | ||
SM | 09.01.2019 | ||
TR | 09.01.2019 | ||
BG | 09.04.2019 | ||
NO | 09.04.2019 | ||
GR | 10.04.2019 | ||
IE | 27.04.2019 | ||
LU | 27.04.2019 | ||
CH | 30.04.2019 | ||
LI | 30.04.2019 | ||
IS | 09.05.2019 | ||
PT | 09.05.2019 | ||
Former [2021/32] | HU | 27.04.2016 | |
AL | 09.01.2019 | ||
AT | 09.01.2019 | ||
CY | 09.01.2019 | ||
CZ | 09.01.2019 | ||
EE | 09.01.2019 | ||
ES | 09.01.2019 | ||
FI | 09.01.2019 | ||
HR | 09.01.2019 | ||
IT | 09.01.2019 | ||
LT | 09.01.2019 | ||
LV | 09.01.2019 | ||
MC | 09.01.2019 | ||
PL | 09.01.2019 | ||
RO | 09.01.2019 | ||
RS | 09.01.2019 | ||
SE | 09.01.2019 | ||
SI | 09.01.2019 | ||
SK | 09.01.2019 | ||
SM | 09.01.2019 | ||
TR | 09.01.2019 | ||
BG | 09.04.2019 | ||
NO | 09.04.2019 | ||
GR | 10.04.2019 | ||
IE | 27.04.2019 | ||
LU | 27.04.2019 | ||
CH | 30.04.2019 | ||
LI | 30.04.2019 | ||
IS | 09.05.2019 | ||
PT | 09.05.2019 | ||
Former [2021/31] | AL | 09.01.2019 | |
AT | 09.01.2019 | ||
CY | 09.01.2019 | ||
CZ | 09.01.2019 | ||
EE | 09.01.2019 | ||
ES | 09.01.2019 | ||
FI | 09.01.2019 | ||
HR | 09.01.2019 | ||
IT | 09.01.2019 | ||
LT | 09.01.2019 | ||
LV | 09.01.2019 | ||
MC | 09.01.2019 | ||
PL | 09.01.2019 | ||
RO | 09.01.2019 | ||
RS | 09.01.2019 | ||
SE | 09.01.2019 | ||
SI | 09.01.2019 | ||
SK | 09.01.2019 | ||
SM | 09.01.2019 | ||
TR | 09.01.2019 | ||
BG | 09.04.2019 | ||
NO | 09.04.2019 | ||
GR | 10.04.2019 | ||
IE | 27.04.2019 | ||
LU | 27.04.2019 | ||
CH | 30.04.2019 | ||
LI | 30.04.2019 | ||
IS | 09.05.2019 | ||
PT | 09.05.2019 | ||
Former [2021/26] | AL | 09.01.2019 | |
AT | 09.01.2019 | ||
CY | 09.01.2019 | ||
CZ | 09.01.2019 | ||
EE | 09.01.2019 | ||
ES | 09.01.2019 | ||
FI | 09.01.2019 | ||
HR | 09.01.2019 | ||
IT | 09.01.2019 | ||
LT | 09.01.2019 | ||
LV | 09.01.2019 | ||
MC | 09.01.2019 | ||
PL | 09.01.2019 | ||
RO | 09.01.2019 | ||
RS | 09.01.2019 | ||
SE | 09.01.2019 | ||
SI | 09.01.2019 | ||
SK | 09.01.2019 | ||
TR | 09.01.2019 | ||
BG | 09.04.2019 | ||
NO | 09.04.2019 | ||
GR | 10.04.2019 | ||
IE | 27.04.2019 | ||
LU | 27.04.2019 | ||
CH | 30.04.2019 | ||
LI | 30.04.2019 | ||
IS | 09.05.2019 | ||
PT | 09.05.2019 | ||
Former [2020/21] | AL | 09.01.2019 | |
AT | 09.01.2019 | ||
CZ | 09.01.2019 | ||
EE | 09.01.2019 | ||
ES | 09.01.2019 | ||
FI | 09.01.2019 | ||
HR | 09.01.2019 | ||
IT | 09.01.2019 | ||
LT | 09.01.2019 | ||
LV | 09.01.2019 | ||
MC | 09.01.2019 | ||
PL | 09.01.2019 | ||
RO | 09.01.2019 | ||
RS | 09.01.2019 | ||
SE | 09.01.2019 | ||
SI | 09.01.2019 | ||
SK | 09.01.2019 | ||
TR | 09.01.2019 | ||
BG | 09.04.2019 | ||
NO | 09.04.2019 | ||
GR | 10.04.2019 | ||
IE | 27.04.2019 | ||
LU | 27.04.2019 | ||
CH | 30.04.2019 | ||
LI | 30.04.2019 | ||
IS | 09.05.2019 | ||
PT | 09.05.2019 | ||
Former [2020/17] | AL | 09.01.2019 | |
AT | 09.01.2019 | ||
CZ | 09.01.2019 | ||
EE | 09.01.2019 | ||
ES | 09.01.2019 | ||
FI | 09.01.2019 | ||
HR | 09.01.2019 | ||
IT | 09.01.2019 | ||
LT | 09.01.2019 | ||
LV | 09.01.2019 | ||
MC | 09.01.2019 | ||
PL | 09.01.2019 | ||
RO | 09.01.2019 | ||
RS | 09.01.2019 | ||
SE | 09.01.2019 | ||
SI | 09.01.2019 | ||
SK | 09.01.2019 | ||
TR | 09.01.2019 | ||
BG | 09.04.2019 | ||
NO | 09.04.2019 | ||
GR | 10.04.2019 | ||
LU | 27.04.2019 | ||
CH | 30.04.2019 | ||
LI | 30.04.2019 | ||
IS | 09.05.2019 | ||
PT | 09.05.2019 | ||
Former [2020/11] | AL | 09.01.2019 | |
AT | 09.01.2019 | ||
CZ | 09.01.2019 | ||
EE | 09.01.2019 | ||
ES | 09.01.2019 | ||
FI | 09.01.2019 | ||
HR | 09.01.2019 | ||
IT | 09.01.2019 | ||
LT | 09.01.2019 | ||
LV | 09.01.2019 | ||
MC | 09.01.2019 | ||
PL | 09.01.2019 | ||
RO | 09.01.2019 | ||
RS | 09.01.2019 | ||
SE | 09.01.2019 | ||
SI | 09.01.2019 | ||
SK | 09.01.2019 | ||
BG | 09.04.2019 | ||
NO | 09.04.2019 | ||
GR | 10.04.2019 | ||
LU | 27.04.2019 | ||
CH | 30.04.2019 | ||
LI | 30.04.2019 | ||
IS | 09.05.2019 | ||
PT | 09.05.2019 | ||
Former [2020/04] | AL | 09.01.2019 | |
AT | 09.01.2019 | ||
CZ | 09.01.2019 | ||
EE | 09.01.2019 | ||
ES | 09.01.2019 | ||
FI | 09.01.2019 | ||
HR | 09.01.2019 | ||
IT | 09.01.2019 | ||
LT | 09.01.2019 | ||
LV | 09.01.2019 | ||
MC | 09.01.2019 | ||
PL | 09.01.2019 | ||
RO | 09.01.2019 | ||
RS | 09.01.2019 | ||
SE | 09.01.2019 | ||
SK | 09.01.2019 | ||
BG | 09.04.2019 | ||
NO | 09.04.2019 | ||
GR | 10.04.2019 | ||
LU | 27.04.2019 | ||
IS | 09.05.2019 | ||
PT | 09.05.2019 | ||
Former [2020/02] | AL | 09.01.2019 | |
AT | 09.01.2019 | ||
CZ | 09.01.2019 | ||
EE | 09.01.2019 | ||
ES | 09.01.2019 | ||
FI | 09.01.2019 | ||
HR | 09.01.2019 | ||
IT | 09.01.2019 | ||
LT | 09.01.2019 | ||
LV | 09.01.2019 | ||
MC | 09.01.2019 | ||
PL | 09.01.2019 | ||
RO | 09.01.2019 | ||
RS | 09.01.2019 | ||
SE | 09.01.2019 | ||
SK | 09.01.2019 | ||
BG | 09.04.2019 | ||
NO | 09.04.2019 | ||
GR | 10.04.2019 | ||
IS | 09.05.2019 | ||
PT | 09.05.2019 | ||
Former [2019/49] | AL | 09.01.2019 | |
AT | 09.01.2019 | ||
CZ | 09.01.2019 | ||
EE | 09.01.2019 | ||
ES | 09.01.2019 | ||
FI | 09.01.2019 | ||
HR | 09.01.2019 | ||
IT | 09.01.2019 | ||
LT | 09.01.2019 | ||
LV | 09.01.2019 | ||
PL | 09.01.2019 | ||
RO | 09.01.2019 | ||
RS | 09.01.2019 | ||
SE | 09.01.2019 | ||
SK | 09.01.2019 | ||
BG | 09.04.2019 | ||
NO | 09.04.2019 | ||
GR | 10.04.2019 | ||
IS | 09.05.2019 | ||
PT | 09.05.2019 | ||
Former [2019/46] | AT | 09.01.2019 | |
ES | 09.01.2019 | ||
FI | 09.01.2019 | ||
HR | 09.01.2019 | ||
IT | 09.01.2019 | ||
LT | 09.01.2019 | ||
LV | 09.01.2019 | ||
PL | 09.01.2019 | ||
RS | 09.01.2019 | ||
SE | 09.01.2019 | ||
BG | 09.04.2019 | ||
NO | 09.04.2019 | ||
GR | 10.04.2019 | ||
IS | 09.05.2019 | ||
PT | 09.05.2019 | ||
Former [2019/39] | ES | 09.01.2019 | |
FI | 09.01.2019 | ||
HR | 09.01.2019 | ||
LT | 09.01.2019 | ||
LV | 09.01.2019 | ||
PL | 09.01.2019 | ||
RS | 09.01.2019 | ||
SE | 09.01.2019 | ||
BG | 09.04.2019 | ||
NO | 09.04.2019 | ||
GR | 10.04.2019 | ||
IS | 09.05.2019 | ||
PT | 09.05.2019 | ||
Former [2019/38] | ES | 09.01.2019 | |
FI | 09.01.2019 | ||
LT | 09.01.2019 | ||
PL | 09.01.2019 | ||
SE | 09.01.2019 | ||
BG | 09.04.2019 | ||
NO | 09.04.2019 | ||
GR | 10.04.2019 | ||
PT | 09.05.2019 | ||
Former [2019/37] | ES | 09.01.2019 | |
FI | 09.01.2019 | ||
LT | 09.01.2019 | ||
PL | 09.01.2019 | ||
SE | 09.01.2019 | ||
NO | 09.04.2019 | ||
GR | 10.04.2019 | ||
PT | 09.05.2019 | ||
Former [2019/35] | ES | 09.01.2019 | |
FI | 09.01.2019 | ||
LT | 09.01.2019 | ||
PL | 09.01.2019 | ||
SE | 09.01.2019 | ||
NO | 09.04.2019 | ||
PT | 09.05.2019 | ||
Former [2019/34] | FI | 09.01.2019 | |
LT | 09.01.2019 | ||
SE | 09.01.2019 | ||
NO | 09.04.2019 | ||
PT | 09.05.2019 | ||
Former [2019/33] | FI | 09.01.2019 | |
LT | 09.01.2019 | ||
NO | 09.04.2019 | ||
PT | 09.05.2019 | Documents cited: | Search | [Y]JPS6078370U (TOSHIBA CORPORATION) [Y] 1,8,13-15* figures 1-4 *; | [YD]US2003196857 (TINER JAMES L [US]) [YD] 1,8,13-15 * abstract * * paragraphs [0051] - [0053] *; | [YA]US2012279805 (MEYER HERMANN [DE], et al) [Y] 1,2,8-15 * abstract * * paragraphs [0029] - [0032] * * claim 8 * [A] 3-7; | [Y]WO2013001639 (MITSUBISHI ELECTRIC CORP [JP], et al) [Y] 1,2,8-15 * abstract * * paragraphs [0011] - [0039] *; | [YA]EP2826742 (AIP APS [DK]) [Y] 1,2,8-15 * abstract * * paragraphs [0001] , [0 23] - [0040] * [A] 3-7 | by applicant | US2003196857 |