EP3144259 - LIFT ASSEMBLY IN A SHAFT FRAME WITH A PHOTOVOLTAIC CONTROL [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 08.03.2024 Database last updated on 21.05.2024 | |
Former | The patent has been granted Status updated on 31.03.2023 | ||
Former | Grant of patent is intended Status updated on 19.12.2022 | ||
Former | Examination is in progress Status updated on 08.06.2020 | ||
Former | Request for examination was made Status updated on 08.09.2017 | ||
Former | The application has been published Status updated on 17.02.2017 | Most recent event Tooltip | 17.05.2024 | Lapse of the patent in a contracting state New state(s): LU | published on 19.06.2024 [2024/25] | Applicant(s) | For all designated states Aufzugswerke Schmitt & Sohn GmbH & Co. KG Hadermühle 9-15 90402 Nürnberg / DE | [2017/12] | Inventor(s) | 01 /
Kaldenhoff, Peter Bismarckstraße 120 90491 Nürnberg / DE | 02 /
Kipfstuhl, Michael Nürnberger Straße 5 91217 Hersbruck / DE | 03 /
Schmidt, Frank Egidienplatz 7 90402 Nürnberg / DE | [2017/12] | Representative(s) | Cöster, Enno Cöster & Partner Rechtsanwälte Theodorstrasse 9 90489 Nürnberg / DE | [2017/12] | Application number, filing date | 16401066.2 | 15.09.2016 | [2017/12] | Priority number, date | DE201510115844 | 18.09.2015 Original published format: DE102015115844 | [2017/12] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3144259 | Date: | 22.03.2017 | Language: | DE | [2017/12] | Type: | B1 Patent specification | No.: | EP3144259 | Date: | 03.05.2023 | Language: | DE | [2023/18] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 13.02.2017 | Classification | IPC: | B66B1/30, B66B11/00, E04F17/00 | [2017/12] | CPC: |
B66B1/302 (EP);
B66B11/0005 (EP);
E04F17/005 (EP);
Y02E10/50 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/41] |
Former [2017/12] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | AUFZUGSANLAGE IN EINEM SCHACHTGERÜST MIT EINER PHOTOVOLTAIK-STEUERUNG | [2017/12] | English: | LIFT ASSEMBLY IN A SHAFT FRAME WITH A PHOTOVOLTAIC CONTROL | [2017/12] | French: | ASCENSEUR DANS UNE STRUCTURE DE CAGE COMPRENANT UNE COMMANDE PHOTOVOLTAÏQUE | [2017/12] | Examination procedure | 15.09.2016 | Date on which the examining division has become responsible | 30.08.2017 | Amendment by applicant (claims and/or description) | 31.08.2017 | Examination requested [2017/41] | 12.06.2020 | Despatch of a communication from the examining division (Time limit: M04) | 15.10.2020 | Reply to a communication from the examining division | 11.11.2021 | Despatch of a communication from the examining division (Time limit: M04) | 10.03.2022 | Reply to a communication from the examining division | 25.04.2022 | Despatch of a communication from the examining division (Time limit: M04) | 10.06.2022 | Reply to a communication from the examining division | 15.07.2022 | Despatch of a communication from the examining division (Time limit: M04) | 19.10.2022 | Reply to a communication from the examining division | 20.12.2022 | Communication of intention to grant the patent | 20.03.2023 | Fee for grant paid | 20.03.2023 | Fee for publishing/printing paid | 20.03.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 06.02.2024 | No opposition filed within time limit [2024/15] | Fees paid | Renewal fee | 14.06.2018 | Renewal fee patent year 03 | 18.06.2019 | Renewal fee patent year 04 | 09.06.2020 | Renewal fee patent year 05 | 06.07.2021 | Renewal fee patent year 06 | 07.09.2022 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | DK | 03.05.2023 | EE | 03.05.2023 | ES | 03.05.2023 | FI | 03.05.2023 | HR | 03.05.2023 | LT | 03.05.2023 | LV | 03.05.2023 | NL | 03.05.2023 | PL | 03.05.2023 | RO | 03.05.2023 | RS | 03.05.2023 | SE | 03.05.2023 | SI | 03.05.2023 | SK | 03.05.2023 | SM | 03.05.2023 | NO | 03.08.2023 | GR | 04.08.2023 | IS | 03.09.2023 | LU | 15.09.2023 | [2024/25] |
Former [2024/24] | DK | 03.05.2023 | |
EE | 03.05.2023 | ||
ES | 03.05.2023 | ||
FI | 03.05.2023 | ||
HR | 03.05.2023 | ||
LT | 03.05.2023 | ||
LV | 03.05.2023 | ||
NL | 03.05.2023 | ||
PL | 03.05.2023 | ||
RO | 03.05.2023 | ||
RS | 03.05.2023 | ||
SE | 03.05.2023 | ||
SI | 03.05.2023 | ||
SK | 03.05.2023 | ||
SM | 03.05.2023 | ||
NO | 03.08.2023 | ||
GR | 04.08.2023 | ||
IS | 03.09.2023 | ||
Former [2024/10] | DK | 03.05.2023 | |
EE | 03.05.2023 | ||
ES | 03.05.2023 | ||
FI | 03.05.2023 | ||
HR | 03.05.2023 | ||
LT | 03.05.2023 | ||
LV | 03.05.2023 | ||
NL | 03.05.2023 | ||
PL | 03.05.2023 | ||
RO | 03.05.2023 | ||
RS | 03.05.2023 | ||
SE | 03.05.2023 | ||
SK | 03.05.2023 | ||
SM | 03.05.2023 | ||
NO | 03.08.2023 | ||
GR | 04.08.2023 | ||
IS | 03.09.2023 | ||
Former [2024/08] | ES | 03.05.2023 | |
FI | 03.05.2023 | ||
HR | 03.05.2023 | ||
LT | 03.05.2023 | ||
LV | 03.05.2023 | ||
NL | 03.05.2023 | ||
PL | 03.05.2023 | ||
RS | 03.05.2023 | ||
SE | 03.05.2023 | ||
SK | 03.05.2023 | ||
SM | 03.05.2023 | ||
NO | 03.08.2023 | ||
GR | 04.08.2023 | ||
IS | 03.09.2023 | ||
Former [2024/03] | ES | 03.05.2023 | |
FI | 03.05.2023 | ||
HR | 03.05.2023 | ||
LT | 03.05.2023 | ||
LV | 03.05.2023 | ||
NL | 03.05.2023 | ||
PL | 03.05.2023 | ||
RS | 03.05.2023 | ||
SE | 03.05.2023 | ||
NO | 03.08.2023 | ||
GR | 04.08.2023 | ||
IS | 03.09.2023 | ||
Former [2024/01] | ES | 03.05.2023 | |
HR | 03.05.2023 | ||
LT | 03.05.2023 | ||
LV | 03.05.2023 | ||
NL | 03.05.2023 | ||
PL | 03.05.2023 | ||
RS | 03.05.2023 | ||
SE | 03.05.2023 | ||
NO | 03.08.2023 | ||
GR | 04.08.2023 | ||
IS | 03.09.2023 | ||
Former [2023/51] | ES | 03.05.2023 | |
HR | 03.05.2023 | ||
NL | 03.05.2023 | ||
PL | 03.05.2023 | ||
RS | 03.05.2023 | ||
SE | 03.05.2023 | ||
NO | 03.08.2023 | ||
GR | 04.08.2023 | ||
IS | 03.09.2023 | ||
Former [2023/50] | ES | 03.05.2023 | |
NL | 03.05.2023 | ||
PL | 03.05.2023 | ||
SE | 03.05.2023 | ||
NO | 03.08.2023 | ||
GR | 04.08.2023 | ||
IS | 03.09.2023 | ||
Former [2023/48] | ES | 03.05.2023 | |
NL | 03.05.2023 | ||
SE | 03.05.2023 | ||
NO | 03.08.2023 | ||
Former [2023/46] | ES | 03.05.2023 | Documents cited: | Search | [XAYI]DE20302588U (ISOTECH GMBH [DE]) [X] 1,2 * page 8, line 1 - page 9, line 14 * * page 16, line 20 - page 18, line 22 * * figure 6 * [A] 10 [Y] 3,4,7-9,12-15 [I] 5,6,11; | [YA]DE102008004334 (NUTT NORBERT [DE]) [Y] 7-9 * abstract * * paragraph [0001] - paragraph [0006] * * figure 1 * [A] 1-6,10-15; | [YA]WO2010092231 (KONE CORP, et al) [Y] 3,4 * abstract * * page 1, line 7 - line 14 * * page 10, line 4 - page 12, line 23 * * figures 1-3 * [A] 1,2,5-15; | [YA]EP2500309 (INVENTIO AG [CH]) [Y] 12-15 * abstract * * paragraph [0016] - paragraph [0043] * * figures 1-3 *[A] 1-11 |