blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3177698

EP3177698 - APPARATUS AND METHOD FOR THE CATALYTIC PRESSURE-FREE DEPOLYMERISATION [Right-click to bookmark this link]
Former [2017/24]CATALYTIC PRESSURE-LESS DEPOLYMERIZATION DEVICE AND METHOD
[2018/52]
StatusNo opposition filed within time limit
Status updated on  17.04.2020
Database last updated on 11.09.2024
FormerThe patent has been granted
Status updated on  10.05.2019
FormerGrant of patent is intended
Status updated on  06.01.2019
FormerExamination is in progress
Status updated on  04.08.2017
FormerRequest for examination was made
Status updated on  12.05.2017
FormerThe international publication has been made
Status updated on  08.03.2017
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
Innoil AG
Wingertliweg 1
7204 Untervaz / CH
[2019/17]
Former [2017/24]For all designated states
Leaves AG
Ignius
7172 Rabius / CH
Inventor(s)01 / BÖHME, Kurt
Hof Erliacker 63/Buus
4462 Rickenbach / CH
 [2017/24]
Representative(s)Sperling, Thomas
Sperling, Fischer & Heyner
Patentanwälte
Tolkewitzer Straße 22
01277 Dresden / DE
[2017/24]
Application number, filing date16702889.320.01.2016
[2017/24]
WO2016EP51079
Priority number, dateDE20151010093822.01.2015         Original published format: DE102015100938
[2017/24]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2016116484
Date:28.07.2016
Language:DE
[2016/30]
Type: A1 Application with search report 
No.:EP3177698
Date:14.06.2017
Language:DE
The application published by WIPO in one of the EPO official languages on 28.07.2016 takes the place of the publication of the European patent application.
[2017/24]
Type: B1 Patent specification 
No.:EP3177698
Date:12.06.2019
Language:DE
[2019/24]
Search report(s)International search report - published on:EP28.07.2016
ClassificationIPC:C10G1/08, C10G1/10
[2017/24]
CPC:
C10G1/10 (EP); C10G1/083 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/24]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:VORRICHTUNG UND VERFAHREN ZUR KATALYTISCH DRUCKLOSEN VERÖLUNG[2017/24]
English:APPARATUS AND METHOD FOR THE CATALYTIC PRESSURE-FREE DEPOLYMERISATION[2018/52]
French:DISPOSITIF ET PROCÉDÉ DE DÉPOLYMÉRISATION CATALYTIQUE SANS PRESSION[2017/24]
Former [2017/24]CATALYTIC PRESSURE-LESS DEPOLYMERIZATION DEVICE AND METHOD
Entry into regional phase08.03.2017National basic fee paid 
08.03.2017Designation fee(s) paid 
08.03.2017Examination fee paid 
Examination procedure08.03.2017Amendment by applicant (claims and/or description)
08.03.2017Examination requested  [2017/24]
08.03.2017Date on which the examining division has become responsible
03.08.2017Despatch of a communication from the examining division (Time limit: M04)
01.12.2017Reply to a communication from the examining division
20.02.2018Despatch of a communication from the examining division (Time limit: M04)
19.06.2018Reply to a communication from the examining division
29.08.2018Despatch of a communication from the examining division (Time limit: M02)
24.10.2018Reply to a communication from the examining division
07.01.2019Communication of intention to grant the patent
03.05.2019Fee for grant paid
03.05.2019Fee for publishing/printing paid
03.05.2019Receipt of the translation of the claim(s)
Opposition(s)13.03.2020No opposition filed within time limit [2020/21]
Fees paidRenewal fee
17.01.2018Renewal fee patent year 03
10.01.2019Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU20.01.2016
AL12.06.2019
CY12.06.2019
CZ12.06.2019
DK12.06.2019
EE12.06.2019
FI12.06.2019
LT12.06.2019
LV12.06.2019
MC12.06.2019
MK12.06.2019
MT12.06.2019
NL12.06.2019
PL12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SI12.06.2019
SK12.06.2019
SM12.06.2019
TR12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
IS12.10.2019
PT14.10.2019
GB20.01.2020
IE20.01.2020
LU20.01.2020
BE31.01.2020
FR31.01.2020
[2022/32]
Former [2022/28]HU20.01.2016
AL12.06.2019
CY12.06.2019
CZ12.06.2019
DK12.06.2019
EE12.06.2019
FI12.06.2019
LT12.06.2019
LV12.06.2019
MC12.06.2019
MT12.06.2019
NL12.06.2019
PL12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SI12.06.2019
SK12.06.2019
SM12.06.2019
TR12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
IS12.10.2019
PT14.10.2019
GB20.01.2020
IE20.01.2020
LU20.01.2020
BE31.01.2020
FR31.01.2020
Former [2021/08]AL12.06.2019
CZ12.06.2019
DK12.06.2019
EE12.06.2019
FI12.06.2019
LT12.06.2019
LV12.06.2019
MC12.06.2019
NL12.06.2019
PL12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SI12.06.2019
SK12.06.2019
SM12.06.2019
TR12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
IS12.10.2019
PT14.10.2019
GB20.01.2020
IE20.01.2020
LU20.01.2020
BE31.01.2020
FR31.01.2020
Former [2020/51]AL12.06.2019
CZ12.06.2019
DK12.06.2019
EE12.06.2019
FI12.06.2019
LT12.06.2019
LV12.06.2019
MC12.06.2019
NL12.06.2019
PL12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SI12.06.2019
SK12.06.2019
SM12.06.2019
TR12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
IS12.10.2019
PT14.10.2019
GB20.01.2020
LU20.01.2020
BE31.01.2020
FR31.01.2020
Former [2020/48]AL12.06.2019
CZ12.06.2019
DK12.06.2019
EE12.06.2019
FI12.06.2019
LT12.06.2019
LV12.06.2019
MC12.06.2019
NL12.06.2019
PL12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SI12.06.2019
SK12.06.2019
SM12.06.2019
TR12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
IS12.10.2019
PT14.10.2019
GB20.01.2020
LU20.01.2020
FR31.01.2020
Former [2020/46]AL12.06.2019
CZ12.06.2019
DK12.06.2019
EE12.06.2019
FI12.06.2019
LT12.06.2019
LV12.06.2019
MC12.06.2019
NL12.06.2019
PL12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SI12.06.2019
SK12.06.2019
SM12.06.2019
TR12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
IS12.10.2019
PT14.10.2019
LU20.01.2020
Former [2020/39]AL12.06.2019
CZ12.06.2019
DK12.06.2019
EE12.06.2019
FI12.06.2019
LT12.06.2019
LV12.06.2019
MC12.06.2019
NL12.06.2019
PL12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SI12.06.2019
SK12.06.2019
SM12.06.2019
TR12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
IS12.10.2019
PT14.10.2019
Former [2020/36]AL12.06.2019
CZ12.06.2019
DK12.06.2019
EE12.06.2019
FI12.06.2019
LT12.06.2019
LV12.06.2019
NL12.06.2019
PL12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SI12.06.2019
SK12.06.2019
SM12.06.2019
TR12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
IS12.10.2019
PT14.10.2019
Former [2020/24]AL12.06.2019
CZ12.06.2019
DK12.06.2019
EE12.06.2019
FI12.06.2019
LT12.06.2019
LV12.06.2019
NL12.06.2019
PL12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SI12.06.2019
SK12.06.2019
SM12.06.2019
TR12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
PT14.10.2019
IS24.02.2020
Former [2020/22]AL12.06.2019
CZ12.06.2019
DK12.06.2019
EE12.06.2019
FI12.06.2019
LT12.06.2019
LV12.06.2019
NL12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SK12.06.2019
SM12.06.2019
TR12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
IS12.10.2019
PT14.10.2019
Former [2020/17]AL12.06.2019
CZ12.06.2019
EE12.06.2019
FI12.06.2019
LT12.06.2019
LV12.06.2019
NL12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SK12.06.2019
SM12.06.2019
TR12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
IS12.10.2019
PT14.10.2019
Former [2020/14]AL12.06.2019
CZ12.06.2019
EE12.06.2019
FI12.06.2019
LT12.06.2019
LV12.06.2019
NL12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SK12.06.2019
SM12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
IS12.10.2019
PT14.10.2019
Former [2020/12]AL12.06.2019
CZ12.06.2019
EE12.06.2019
FI12.06.2019
LT12.06.2019
LV12.06.2019
NL12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SK12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
IS12.10.2019
PT14.10.2019
Former [2020/11]AL12.06.2019
CZ12.06.2019
EE12.06.2019
FI12.06.2019
LT12.06.2019
LV12.06.2019
NL12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SK12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
PT14.10.2019
Former [2020/10]AL12.06.2019
CZ12.06.2019
FI12.06.2019
LT12.06.2019
LV12.06.2019
NL12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
PT14.10.2019
Former [2020/09]AL12.06.2019
CZ12.06.2019
FI12.06.2019
LT12.06.2019
LV12.06.2019
NL12.06.2019
RS12.06.2019
SE12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
Former [2020/07]AL12.06.2019
FI12.06.2019
LT12.06.2019
LV12.06.2019
NL12.06.2019
RS12.06.2019
SE12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
Former [2019/51]AL12.06.2019
FI12.06.2019
LT12.06.2019
LV12.06.2019
RS12.06.2019
SE12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
Former [2019/50]AL12.06.2019
FI12.06.2019
LT12.06.2019
LV12.06.2019
RS12.06.2019
SE12.06.2019
NO12.09.2019
GR13.09.2019
Former [2019/49]AL12.06.2019
FI12.06.2019
LT12.06.2019
SE12.06.2019
NO12.09.2019
Former [2019/48]FI12.06.2019
LT12.06.2019
SE12.06.2019
NO12.09.2019
Former [2019/47]FI12.06.2019
LT12.06.2019
NO12.09.2019
Cited inInternational search[X]WO2009095888  (VUZETA BREVETTI S R L [IT], et al) [X] 1-14 * page 3, line 10 - page 4, line 33; figure 1; claims 1,2,6 * * page 5, line 34 - page 6, line 15 *;
 [X]DE102010060675  (HERMANN KAY [DE], et al) [X] 1-14* paragraphs [0015] , [0016] , [0025] , [0027] , [0028]; figure 1; claims 1-5,7 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.