blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3278500

EP3278500 - PROCESSING DATA ITEMS IN A COMMUNICATIONS NETWORK [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  18.09.2020
Database last updated on 02.08.2024
FormerThe patent has been granted
Status updated on  11.10.2019
FormerGrant of patent is intended
Status updated on  10.06.2019
FormerRequest for examination was made
Status updated on  05.01.2018
FormerThe international publication has been made
Status updated on  20.09.2017
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
British Telecommunications public limited company
81 Newgate Street
London EC1A 7AJ / GB
[2018/06]
Inventor(s)01 / BURBRIDGE, Trevor
81 Newgate Street
London EC1A 7AJ / GB
02 / SMITH, Alan
PP: C5A BT Centre
London EC1A 7AJ / GB
03 / EARDLEY, Philip
81 Newgate Street
London London EC1A 7AJ / GB
 [2018/06]
Representative(s)British Telecommunications public limited company Intellectual Property Department
9th Floor
One Braham
Braham Street
London E1 8EE / GB
[N/P]
Former [2018/06]British Telecommunications public limited company Intellectual Property Department
Ground Floor, Faraday Building
1 Knightrider Street
London EC4V 5BT / GB
Application number, filing date16709446.511.03.2016
[2018/06]
WO2016EP55261
Priority number, dateEP2015027509330.03.2015         Original published format: EP 15275093
[2018/06]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2016156014
Date:06.10.2016
Language:EN
[2016/40]
Type: A1 Application with search report 
No.:EP3278500
Date:07.02.2018
Language:EN
The application published by WIPO in one of the EPO official languages on 06.10.2016 takes the place of the publication of the European patent application.
[2018/06]
Type: B1 Patent specification 
No.:EP3278500
Date:13.11.2019
Language:EN
[2019/46]
Search report(s)International search report - published on:EP06.10.2016
ClassificationIPC:H04L12/24, H04L12/26, H04L12/14, H04L12/721, H04L12/707, H04L12/851, H04L12/841, H04L12/833, H04L29/06
[2019/26]
CPC:
H04L43/0864 (EP,US); H04L47/2441 (US); H04L43/10 (EP,US);
H04L45/38 (US); H04L47/283 (US); H04L69/22 (US);
H04L12/14 (US); H04L43/0829 (EP,US); H04L43/0876 (EP,US);
H04L43/0888 (EP,US); H04L43/16 (EP,US); H04L45/14 (US);
H04L45/22 (US); H04L45/26 (US); H04L45/70 (US);
H04L47/31 (US) (-)
Former IPC [2018/06]H04L12/24, H04L12/26
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/06]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:VERARBEITUNG VON DATENPOSTEN IN EINEM KOMMUNIKATIONSNETZ[2018/06]
English:PROCESSING DATA ITEMS IN A COMMUNICATIONS NETWORK[2018/06]
French:TRAITEMENT D'ARTICLES DE DONNÉES DANS UN RÉSEAU DE COMMUNICATION[2019/26]
Former [2018/06]ÉLÉMENTS DE TRAITEMENT DE DONNÉES DANS UN RÉSEAU DE COMMUNICATION
Entry into regional phase20.09.2017National basic fee paid 
20.09.2017Designation fee(s) paid 
20.09.2017Examination fee paid 
Examination procedure20.09.2017Amendment by applicant (claims and/or description)
20.09.2017Examination requested  [2018/06]
20.09.2017Date on which the examining division has become responsible
11.06.2019Communication of intention to grant the patent
03.10.2019Fee for grant paid
03.10.2019Fee for publishing/printing paid
03.10.2019Receipt of the translation of the claim(s)
Opposition(s)14.08.2020No opposition filed within time limit [2020/43]
Fees paidRenewal fee
01.01.2018Renewal fee patent year 03
31.12.2018Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU11.03.2016
AL13.11.2019
AT13.11.2019
CY13.11.2019
CZ13.11.2019
DK13.11.2019
EE13.11.2019
ES13.11.2019
FI13.11.2019
HR13.11.2019
IT13.11.2019
LT13.11.2019
LV13.11.2019
MC13.11.2019
MK13.11.2019
MT13.11.2019
NL13.11.2019
PL13.11.2019
RO13.11.2019
RS13.11.2019
SE13.11.2019
SI13.11.2019
SK13.11.2019
SM13.11.2019
TR13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
IE11.03.2020
LU11.03.2020
IS13.03.2020
PT13.03.2020
BE31.03.2020
CH31.03.2020
LI31.03.2020
[2022/32]
Former [2022/27]HU11.03.2016
AL13.11.2019
AT13.11.2019
CY13.11.2019
CZ13.11.2019
DK13.11.2019
EE13.11.2019
ES13.11.2019
FI13.11.2019
HR13.11.2019
IT13.11.2019
LT13.11.2019
LV13.11.2019
MC13.11.2019
MT13.11.2019
NL13.11.2019
PL13.11.2019
RO13.11.2019
RS13.11.2019
SE13.11.2019
SI13.11.2019
SK13.11.2019
SM13.11.2019
TR13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
IE11.03.2020
LU11.03.2020
IS13.03.2020
PT13.03.2020
BE31.03.2020
CH31.03.2020
LI31.03.2020
Former [2021/10]AL13.11.2019
AT13.11.2019
CZ13.11.2019
DK13.11.2019
EE13.11.2019
ES13.11.2019
FI13.11.2019
HR13.11.2019
IT13.11.2019
LT13.11.2019
LV13.11.2019
MC13.11.2019
NL13.11.2019
PL13.11.2019
RO13.11.2019
RS13.11.2019
SE13.11.2019
SI13.11.2019
SK13.11.2019
SM13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
IE11.03.2020
LU11.03.2020
IS13.03.2020
PT13.03.2020
BE31.03.2020
CH31.03.2020
LI31.03.2020
Former [2021/08]AL13.11.2019
AT13.11.2019
CZ13.11.2019
DK13.11.2019
EE13.11.2019
ES13.11.2019
FI13.11.2019
HR13.11.2019
LT13.11.2019
LV13.11.2019
MC13.11.2019
NL13.11.2019
PL13.11.2019
RO13.11.2019
RS13.11.2019
SE13.11.2019
SI13.11.2019
SK13.11.2019
SM13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
IE11.03.2020
LU11.03.2020
IS13.03.2020
PT13.03.2020
CH31.03.2020
LI31.03.2020
Former [2021/04]AL13.11.2019
AT13.11.2019
CZ13.11.2019
DK13.11.2019
EE13.11.2019
ES13.11.2019
FI13.11.2019
HR13.11.2019
LT13.11.2019
LV13.11.2019
MC13.11.2019
NL13.11.2019
PL13.11.2019
RO13.11.2019
RS13.11.2019
SE13.11.2019
SI13.11.2019
SK13.11.2019
SM13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
LU11.03.2020
IS13.03.2020
PT13.03.2020
Former [2020/50]AL13.11.2019
AT13.11.2019
CZ13.11.2019
DK13.11.2019
EE13.11.2019
ES13.11.2019
FI13.11.2019
HR13.11.2019
LT13.11.2019
LV13.11.2019
MC13.11.2019
NL13.11.2019
PL13.11.2019
RO13.11.2019
RS13.11.2019
SE13.11.2019
SI13.11.2019
SK13.11.2019
SM13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
IS13.03.2020
PT13.03.2020
Former [2020/37]AL13.11.2019
CZ13.11.2019
DK13.11.2019
EE13.11.2019
ES13.11.2019
FI13.11.2019
HR13.11.2019
LT13.11.2019
LV13.11.2019
NL13.11.2019
PL13.11.2019
RO13.11.2019
RS13.11.2019
SE13.11.2019
SK13.11.2019
SM13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
IS13.03.2020
PT13.03.2020
Former [2020/36]AL13.11.2019
CZ13.11.2019
DK13.11.2019
EE13.11.2019
ES13.11.2019
FI13.11.2019
HR13.11.2019
LT13.11.2019
LV13.11.2019
NL13.11.2019
PL13.11.2019
RO13.11.2019
RS13.11.2019
SE13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
IS13.03.2020
PT13.03.2020
Former [2020/35]AL13.11.2019
CZ13.11.2019
ES13.11.2019
FI13.11.2019
HR13.11.2019
LT13.11.2019
LV13.11.2019
NL13.11.2019
PL13.11.2019
RO13.11.2019
RS13.11.2019
SE13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
IS13.03.2020
PT13.03.2020
Former [2020/34]AL13.11.2019
ES13.11.2019
FI13.11.2019
HR13.11.2019
LT13.11.2019
LV13.11.2019
NL13.11.2019
PL13.11.2019
RS13.11.2019
SE13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
IS13.03.2020
PT13.03.2020
Former [2020/32]AL13.11.2019
FI13.11.2019
HR13.11.2019
LT13.11.2019
LV13.11.2019
NL13.11.2019
PL13.11.2019
RS13.11.2019
SE13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
IS13.03.2020
PT13.03.2020
Former [2020/25]FI13.11.2019
HR13.11.2019
LT13.11.2019
LV13.11.2019
NL13.11.2019
PL13.11.2019
RS13.11.2019
SE13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
IS13.03.2020
PT13.03.2020
Former [2020/24]FI13.11.2019
LT13.11.2019
LV13.11.2019
NL13.11.2019
PL13.11.2019
SE13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
IS13.03.2020
PT13.03.2020
Former [2020/23]FI13.11.2019
LT13.11.2019
LV13.11.2019
NL13.11.2019
PL13.11.2019
SE13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
PT13.03.2020
Former [2020/22]FI13.11.2019
LT13.11.2019
SE13.11.2019
BG13.02.2020
NO13.02.2020
PT13.03.2020
Former [2020/21]NO13.02.2020
Cited inInternational search[Y]US2002009072  (HALME MATTI [FI]) [Y] 1-15 * paragraph [0047] - paragraph [0055] *;
 [A]GB2426886  (AGILENT TECHNOLOGIES INC [US]) [A] 1-15* paragraph [0004] *;
 [Y]US7933268  (MELMAN DAVID [IL], et al) [Y] 1-15 * column 1, line 40 - line 50 * * column 4, line 62 - column 5, line 16 * * column 6, line 20 - line 27 * * column 9, line 32 - line 51 * * column 9, line 55 - column 10, line 2 *;
 [Y]WO2013100752  (MIMOS BERHAD [MY], et al) [Y] 1-15 * page 3, line 3 - line 12 *
by applicantUS7933268
 US2011116373
 US2013088955
 WO2013100752
    - MATHIS ET AL., "The Macroscopic Behavior of the TCP Congestion Avoidance Algorithm", COMPUTER COMMUNICATION REVIEW, ACM SIGCOMM, (199707), vol. 27, no. 3
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.