EP3245191 - QUINOLINES AND PROCESS FOR THE PREPARATION THEREOF [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 06.08.2021 Database last updated on 14.06.2024 | |
Former | The patent has been granted Status updated on 28.08.2020 | ||
Former | Grant of patent is intended Status updated on 28.04.2020 | ||
Former | Examination is in progress Status updated on 05.03.2019 | ||
Former | Request for examination was made Status updated on 20.10.2017 | ||
Former | The international publication has been made Status updated on 14.07.2017 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Council of Scientific & Industrial Research Anusandhan Bhawan 2, Rafi Marg New Delhi 110001 / IN | [2017/47] | Inventor(s) | 01 /
EKAMBARAM, Balaraman National Chemical Laboratory Pune Maharashtra 411008 / IN | 02 /
LANDGE, Vinod Gokulkrishna National Chemical Laboratory Pune Maharashtra 411008 / IN | [2017/47] | Representative(s) | Hoffmann Eitle Patent- und Rechtsanwälte PartmbB Arabellastraße 30 81925 München / DE | [2017/47] | Application number, filing date | 16711357.0 | 15.01.2016 | [2017/47] | WO2016IN50014 | Priority number, date | IN2015DEL127 | 15.01.2015 Original published format: IN 127DE2015 | [2017/47] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016113759 | Date: | 21.07.2016 | Language: | EN | [2016/29] | Type: | A1 Application with search report | No.: | EP3245191 | Date: | 22.11.2017 | Language: | EN | The application published by WIPO in one of the EPO official languages on 21.07.2016 takes the place of the publication of the European patent application. | [2017/47] | Type: | B1 Patent specification | No.: | EP3245191 | Date: | 30.09.2020 | Language: | EN | [2020/40] | Search report(s) | International search report - published on: | EP | 21.07.2016 | Classification | IPC: | C07D215/04, C07D215/12, C07D215/18, C07D215/20, C07D215/38 | [2017/47] | CPC: |
C07D215/38 (EP,US);
B01J31/04 (US);
B01J31/181 (US);
C07D215/04 (EP,US);
C07D215/12 (EP,US);
C07D215/18 (EP,US);
C07D215/20 (EP,US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/47] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | CHINOLINE UND VERFAHREN ZUR HERSTELLUNG DAVON | [2017/47] | English: | QUINOLINES AND PROCESS FOR THE PREPARATION THEREOF | [2017/47] | French: | QUINOLINES ET PROCÉDÉ POUR LEUR PRÉPARATION | [2017/47] | Entry into regional phase | 14.07.2017 | National basic fee paid | 14.07.2017 | Designation fee(s) paid | 14.07.2017 | Examination fee paid | Examination procedure | 14.07.2017 | Examination requested [2017/47] | 14.07.2017 | Date on which the examining division has become responsible | 01.03.2018 | Amendment by applicant (claims and/or description) | 08.03.2019 | Despatch of a communication from the examining division (Time limit: M04) | 01.07.2019 | Reply to a communication from the examining division | 19.11.2019 | Despatch of a communication from the examining division (Time limit: M04) | 13.03.2020 | Reply to a communication from the examining division | 29.04.2020 | Communication of intention to grant the patent | 25.08.2020 | Fee for grant paid | 25.08.2020 | Fee for publishing/printing paid | 25.08.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 01.07.2021 | No opposition filed within time limit [2021/36] | Fees paid | Renewal fee | 23.01.2018 | Renewal fee patent year 03 | 22.01.2019 | Renewal fee patent year 04 | 21.01.2020 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 15.01.2016 | AL | 30.09.2020 | AT | 30.09.2020 | CY | 30.09.2020 | CZ | 30.09.2020 | DK | 30.09.2020 | EE | 30.09.2020 | ES | 30.09.2020 | FI | 30.09.2020 | HR | 30.09.2020 | IT | 30.09.2020 | LT | 30.09.2020 | LV | 30.09.2020 | MC | 30.09.2020 | MK | 30.09.2020 | NL | 30.09.2020 | PL | 30.09.2020 | RO | 30.09.2020 | RS | 30.09.2020 | SE | 30.09.2020 | SI | 30.09.2020 | SK | 30.09.2020 | SM | 30.09.2020 | TR | 30.09.2020 | BG | 30.12.2020 | NO | 30.12.2020 | GR | 31.12.2020 | GB | 15.01.2021 | IE | 15.01.2021 | LU | 15.01.2021 | IS | 30.01.2021 | BE | 31.01.2021 | CH | 31.01.2021 | FR | 31.01.2021 | LI | 31.01.2021 | PT | 01.02.2021 | [2024/29] |
Former [2024/22] | HU | 15.01.2016 | |
AL | 30.09.2020 | ||
AT | 30.09.2020 | ||
CY | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
MK | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
GB | 15.01.2021 | ||
IE | 15.01.2021 | ||
LU | 15.01.2021 | ||
IS | 30.01.2021 | ||
BE | 31.01.2021 | ||
CH | 31.01.2021 | ||
FR | 31.01.2021 | ||
LI | 31.01.2021 | ||
PT | 01.02.2021 | ||
Former [2023/30] | HU | 15.01.2016 | |
AL | 30.09.2020 | ||
AT | 30.09.2020 | ||
CY | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
GB | 15.01.2021 | ||
IE | 15.01.2021 | ||
LU | 15.01.2021 | ||
IS | 30.01.2021 | ||
BE | 31.01.2021 | ||
CH | 31.01.2021 | ||
FR | 31.01.2021 | ||
LI | 31.01.2021 | ||
PT | 01.02.2021 | ||
Former [2023/27] | HU | 15.01.2016 | |
AL | 30.09.2020 | ||
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
GB | 15.01.2021 | ||
IE | 15.01.2021 | ||
LU | 15.01.2021 | ||
IS | 30.01.2021 | ||
BE | 31.01.2021 | ||
CH | 31.01.2021 | ||
FR | 31.01.2021 | ||
LI | 31.01.2021 | ||
PT | 01.02.2021 | ||
Former [2022/34] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
GB | 15.01.2021 | ||
IE | 15.01.2021 | ||
LU | 15.01.2021 | ||
IS | 30.01.2021 | ||
BE | 31.01.2021 | ||
CH | 31.01.2021 | ||
FR | 31.01.2021 | ||
LI | 31.01.2021 | ||
PT | 01.02.2021 | ||
Former [2022/23] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
GB | 15.01.2021 | ||
IE | 15.01.2021 | ||
LU | 15.01.2021 | ||
IS | 30.01.2021 | ||
CH | 31.01.2021 | ||
FR | 31.01.2021 | ||
LI | 31.01.2021 | ||
PT | 01.02.2021 | ||
Former [2022/10] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
GB | 15.01.2021 | ||
IE | 15.01.2021 | ||
LU | 15.01.2021 | ||
CH | 31.01.2021 | ||
FR | 31.01.2021 | ||
LI | 31.01.2021 | ||
PT | 01.02.2021 | ||
Former [2022/07] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
GB | 15.01.2021 | ||
IE | 15.01.2021 | ||
LU | 15.01.2021 | ||
IS | 30.01.2021 | ||
CH | 31.01.2021 | ||
FR | 31.01.2021 | ||
LI | 31.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/52] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
GB | 15.01.2021 | ||
LU | 15.01.2021 | ||
IS | 30.01.2021 | ||
CH | 31.01.2021 | ||
FR | 31.01.2021 | ||
LI | 31.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/50] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
GB | 15.01.2021 | ||
LU | 15.01.2021 | ||
IS | 30.01.2021 | ||
FR | 31.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/49] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
GB | 15.01.2021 | ||
LU | 15.01.2021 | ||
IS | 30.01.2021 | ||
FR | 31.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/48] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
LU | 15.01.2021 | ||
IS | 30.01.2021 | ||
FR | 31.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/43] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
LU | 15.01.2021 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/40] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/37] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/28] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/25] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/24] | AT | 30.09.2020 | |
CZ | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
NL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
PT | 01.02.2021 | ||
Former [2021/23] | CZ | 30.09.2020 | |
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
NL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
PT | 01.02.2021 | ||
Former [2021/22] | CZ | 30.09.2020 | |
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
NL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
PT | 01.02.2021 | ||
Former [2021/21] | FI | 30.09.2020 | |
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
NL | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
PT | 01.02.2021 | ||
Former [2021/20] | FI | 30.09.2020 | |
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
Former [2021/10] | FI | 30.09.2020 | |
HR | 30.09.2020 | ||
LV | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
Former [2021/08] | FI | 30.09.2020 | |
SE | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
Former [2021/07] | FI | 30.09.2020 | |
NO | 30.12.2020 | Cited in | International search | [XP] - VINOD G. LANDGE ET AL, ") complexes for ligand-enabled C(sp 3 )-alkynylation", DALTON TRANSACTIONS: THE INTERNATIONAL JOURNAL FOR INORGANIC, ORGANOMETALLIC AND BIOINORGANIC CHEMISTRY, GB, (20150722), vol. 44, no. 35, doi:10.1039/C5DT02772A, ISSN 1477-9226, pages 15382 - 15386, XP055267934 [XP] 1-9 * abstract * * Scheme I * * tables 1-3 * DOI: http://dx.doi.org/10.1039/C5DT02772A | [YA] - F, Anne Staubitz ET AL, "Expeditious Functionalization of Quinolines in Positions 2 and 8 via Polyfunctional Aryl-and Heteroarylmagnesium Intermediates", Synthesis, no. 2, doi:10.1055/s-2003-36834, (20030101), pages 1437 - 210, URL: https://www.thieme-connect.com/products/ejournals/html/10.1055/s-2003-36834, XP055267946 [Y] 1,2,9 * Schemes 1-5 * * abstract * * Entry 6;; table 1 * [A] 3-8 | [YA] - BINGXIAN LIU ET AL, "Rhodium(III)-Catalyzed Alkenylation Reactions of 8-Methylquinolines with Alkynes by C(sp 3 )�H Activation", ANGEWANDTE CHEMIE, DE, (20140414), vol. 126, no. 16, doi:10.1002/ange.201310711, ISSN 0044-8249, pages 4275 - 4279, XP055268018 [Y] 1,2,9 * Scheme 1 * * tables 1-3 * [A] 3-8 DOI: http://dx.doi.org/10.1002/ange.201310711 | [YDA] - YUSUKE ANO ET AL, "Palladium-Catalyzed Direct Ethynylation of C(sp 3 )-H Bonds in Aliphatic Carboxylic Acid Derivatives", JOURNAL OF THE AMERICAN CHEMICAL SOCIETY, (20110824), vol. 133, no. 33, doi:10.1021/ja206002m, ISSN 0002-7863, pages 12984 - 12986, XP055059389 [YD] 1,2,9 * page 12984, paragraph 1 * * scheme * * page 12985; table 1 * [A] 3-8 DOI: http://dx.doi.org/10.1021/ja206002m | by applicant | - Y B LIU ET AL., "Rhodium(III)-catalyzed alkenylation reactions of 8-methylquinolines with alkynes by C(sp3)-H activation", ANGEW CHEM INT ED ENGL., (2014), vol. 53, no. 16, pages 4191 - 4195 | - Y ANO ET AL., "Palladium-Catalyzed Direct Ethynylation of C(sp3)- Bonds in Aliphatic Carboxylic Acid Derivatives", J. AM. CHEM. SOC., (2011), vol. 133, no. 33, pages 12984 - 12986 | - J HE ET AL., "Palladium(0)-Catalyzed Alkynylation of C(sp3)-H Bonds", J AM. CHEM. SOC., (2013), vol. 135, no. 9, pages 3387 - 3390 | - Y GU ET AL., "Direct palladium-catalyzed C-3 alkynylation of indoles", TETRAHEDRON LETTERS, (2009), vol. 50, no. 7, pages 763 - 766 | - IV SEREGIN ET AL., "Direct Palladium-Catalyzed Alkynylation of N-Fused Heterocycles", J. AM. CHEM. SOC., (2007), vol. 129, no. 25, pages 7742 - 7743 | - D' SHABASHOV ET AL., "Catalytic Coupling of C-H and C-1 Bonds Using Pyridine As a Directing Group", ORG. LETT., (2005), vol. 7, no. 17, pages 3657 - 3659 |