blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3245570

EP3245570 - DEVICE, METHOD AND SYSTEM FOR DETECTING AND RESOLVING TIME INFORMATION OF DIFFERENT ADMINISTRATIVE DOMAINS [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  02.10.2020
Database last updated on 24.08.2024
FormerThe patent has been granted
Status updated on  25.10.2019
FormerGrant of patent is intended
Status updated on  07.07.2019
FormerExamination is in progress
Status updated on  19.04.2019
FormerRequest for examination was made
Status updated on  20.10.2017
FormerThe international publication has been made
Status updated on  01.09.2017
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
Siemens Aktiengesellschaft
Werner-von-Siemens-Straße 1
80333 München / DE
[2017/47]
Inventor(s)01 / FALK, Rainer
Primelweg 9
85586 Poing / DE
02 / FISCHER, Kai
Heinrich-Marschner-Straße 74
85598 Baldham / DE
03 / FRIES, Steffen
Eberweg 3
85598 Baldham / DE
04 / KLASEN, Wolfgang
Brennerstraße 26
85521 Ottobrunn / DE
 [2017/47]
Application number, filing date16714270.217.03.2016
[2017/47]
WO2016EP55813
Priority number, dateDE20151020540625.03.2015         Original published format: DE102015205406
[2017/47]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2016150814
Date:29.09.2016
Language:DE
[2016/39]
Type: A1 Application with search report 
No.:EP3245570
Date:22.11.2017
Language:DE
The application published by WIPO in one of the EPO official languages on 29.09.2016 takes the place of the publication of the European patent application.
[2017/47]
Type: B1 Patent specification 
No.:EP3245570
Date:27.11.2019
Language:DE
[2019/48]
Search report(s)International search report - published on:EP29.09.2016
ClassificationIPC:G06F1/14
[2017/47]
CPC:
G06F1/14 (EP,CN,US); H04J3/0638 (EP,US); H04J3/0664 (US);
H04J3/0667 (US); H04J3/0673 (US); H04J3/0644 (US);
H04L41/50 (US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/47]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:VORRICHTUNG, VERFAHREN UND SYSTEM ZUR ERFASSUNG UND AUFLÖSUNG VON ZEITINFORMATIONEN UNTERSCHIEDLICHER ADMINISTRATIVER DOMÄNEN[2017/47]
English:DEVICE, METHOD AND SYSTEM FOR DETECTING AND RESOLVING TIME INFORMATION OF DIFFERENT ADMINISTRATIVE DOMAINS[2017/47]
French:DISPOSITIF, PROCÉDÉ ET SYSTÈME PERMETTANT DE DÉTERMINER ET DE RÉSOUDRE DES INFORMATIONS TEMPORELLES DE DIFFÉRENTS DOMAINES ADMINISTRATIFS[2017/47]
Entry into regional phase18.08.2017National basic fee paid 
18.08.2017Designation fee(s) paid 
18.08.2017Examination fee paid 
Examination procedure17.08.2017Date on which the examining division has become responsible
18.08.2017Examination requested  [2017/47]
13.11.2017Amendment by applicant (claims and/or description)
30.04.2019Despatch of a communication from the examining division (Time limit: M02)
15.05.2019Reply to a communication from the examining division
08.07.2019Communication of intention to grant the patent
17.10.2019Receipt of the translation of the claim(s)
18.10.2019Fee for grant paid
18.10.2019Fee for publishing/printing paid
Opposition(s)28.08.2020No opposition filed within time limit [2020/45]
Fees paidRenewal fee
19.03.2018Renewal fee patent year 03
19.03.2019Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU17.03.2016
AL27.11.2019
CY27.11.2019
CZ27.11.2019
DK27.11.2019
EE27.11.2019
ES27.11.2019
FI27.11.2019
HR27.11.2019
LT27.11.2019
LV27.11.2019
MC27.11.2019
MK27.11.2019
MT27.11.2019
NL27.11.2019
PL27.11.2019
RO27.11.2019
RS27.11.2019
SE27.11.2019
SI27.11.2019
SK27.11.2019
SM27.11.2019
TR27.11.2019
BG27.02.2020
NO27.02.2020
GR28.02.2020
IE17.03.2020
LU17.03.2020
IS27.03.2020
BE31.03.2020
CH31.03.2020
LI31.03.2020
PT19.04.2020
[2022/32]
Former [2022/27]HU17.03.2016
AL27.11.2019
CY27.11.2019
CZ27.11.2019
DK27.11.2019
EE27.11.2019
ES27.11.2019
FI27.11.2019
HR27.11.2019
LT27.11.2019
LV27.11.2019
MC27.11.2019
MT27.11.2019
NL27.11.2019
PL27.11.2019
RO27.11.2019
RS27.11.2019
SE27.11.2019
SI27.11.2019
SK27.11.2019
SM27.11.2019
TR27.11.2019
BG27.02.2020
NO27.02.2020
GR28.02.2020
IE17.03.2020
LU17.03.2020
IS27.03.2020
BE31.03.2020
CH31.03.2020
LI31.03.2020
PT19.04.2020
Former [2021/13]AL27.11.2019
CZ27.11.2019
DK27.11.2019
EE27.11.2019
ES27.11.2019
FI27.11.2019
HR27.11.2019
LT27.11.2019
LV27.11.2019
MC27.11.2019
NL27.11.2019
PL27.11.2019
RO27.11.2019
RS27.11.2019
SE27.11.2019
SI27.11.2019
SK27.11.2019
SM27.11.2019
BG27.02.2020
NO27.02.2020
GR28.02.2020
IE17.03.2020
LU17.03.2020
IS27.03.2020
BE31.03.2020
CH31.03.2020
LI31.03.2020
PT19.04.2020
Former [2021/08]AL27.11.2019
CZ27.11.2019
DK27.11.2019
EE27.11.2019
ES27.11.2019
FI27.11.2019
HR27.11.2019
LT27.11.2019
LV27.11.2019
MC27.11.2019
NL27.11.2019
PL27.11.2019
RO27.11.2019
RS27.11.2019
SE27.11.2019
SI27.11.2019
SK27.11.2019
SM27.11.2019
BG27.02.2020
NO27.02.2020
GR28.02.2020
IE17.03.2020
LU17.03.2020
IS27.03.2020
CH31.03.2020
LI31.03.2020
PT19.04.2020
Former [2021/04]AL27.11.2019
CZ27.11.2019
DK27.11.2019
EE27.11.2019
ES27.11.2019
FI27.11.2019
HR27.11.2019
LT27.11.2019
LV27.11.2019
MC27.11.2019
NL27.11.2019
PL27.11.2019
RO27.11.2019
RS27.11.2019
SE27.11.2019
SI27.11.2019
SK27.11.2019
SM27.11.2019
BG27.02.2020
NO27.02.2020
GR28.02.2020
LU17.03.2020
IS27.03.2020
PT19.04.2020
Former [2020/51]AL27.11.2019
CZ27.11.2019
DK27.11.2019
EE27.11.2019
ES27.11.2019
FI27.11.2019
HR27.11.2019
LT27.11.2019
LV27.11.2019
MC27.11.2019
NL27.11.2019
PL27.11.2019
RO27.11.2019
RS27.11.2019
SE27.11.2019
SI27.11.2019
SK27.11.2019
SM27.11.2019
BG27.02.2020
NO27.02.2020
GR28.02.2020
IS27.03.2020
PT19.04.2020
Former [2020/50]AL27.11.2019
CZ27.11.2019
DK27.11.2019
EE27.11.2019
ES27.11.2019
FI27.11.2019
HR27.11.2019
LT27.11.2019
LV27.11.2019
MC27.11.2019
NL27.11.2019
RO27.11.2019
RS27.11.2019
SE27.11.2019
SI27.11.2019
SK27.11.2019
SM27.11.2019
BG27.02.2020
NO27.02.2020
GR28.02.2020
IS27.03.2020
PT19.04.2020
Former [2020/37]AL27.11.2019
CZ27.11.2019
DK27.11.2019
EE27.11.2019
ES27.11.2019
FI27.11.2019
HR27.11.2019
LT27.11.2019
LV27.11.2019
NL27.11.2019
RO27.11.2019
RS27.11.2019
SE27.11.2019
SK27.11.2019
SM27.11.2019
BG27.02.2020
NO27.02.2020
GR28.02.2020
IS27.03.2020
PT19.04.2020
Former [2020/36]AL27.11.2019
CZ27.11.2019
DK27.11.2019
EE27.11.2019
ES27.11.2019
FI27.11.2019
HR27.11.2019
LT27.11.2019
LV27.11.2019
NL27.11.2019
RO27.11.2019
RS27.11.2019
SE27.11.2019
BG27.02.2020
NO27.02.2020
GR28.02.2020
IS27.03.2020
PT19.04.2020
Former [2020/35]AL27.11.2019
CZ27.11.2019
ES27.11.2019
FI27.11.2019
HR27.11.2019
LT27.11.2019
LV27.11.2019
NL27.11.2019
RO27.11.2019
RS27.11.2019
SE27.11.2019
BG27.02.2020
NO27.02.2020
GR28.02.2020
IS27.03.2020
Former [2020/34]AL27.11.2019
ES27.11.2019
FI27.11.2019
HR27.11.2019
LT27.11.2019
LV27.11.2019
NL27.11.2019
RS27.11.2019
SE27.11.2019
BG27.02.2020
NO27.02.2020
GR28.02.2020
IS27.03.2020
Former [2020/32]AL27.11.2019
FI27.11.2019
HR27.11.2019
LT27.11.2019
LV27.11.2019
NL27.11.2019
RS27.11.2019
SE27.11.2019
BG27.02.2020
NO27.02.2020
GR28.02.2020
IS27.03.2020
Former [2020/26]FI27.11.2019
HR27.11.2019
LT27.11.2019
LV27.11.2019
NL27.11.2019
RS27.11.2019
SE27.11.2019
BG27.02.2020
NO27.02.2020
GR28.02.2020
IS27.03.2020
Former [2020/24]FI27.11.2019
LT27.11.2019
LV27.11.2019
NL27.11.2019
SE27.11.2019
BG27.02.2020
NO27.02.2020
GR28.02.2020
IS27.03.2020
Former [2020/23]FI27.11.2019
LT27.11.2019
LV27.11.2019
NL27.11.2019
SE27.11.2019
BG27.02.2020
NO27.02.2020
GR28.02.2020
Former [2020/22]FI27.11.2019
LT27.11.2019
SE27.11.2019
BG27.02.2020
NO27.02.2020
Former [2020/21]NO27.02.2020
Cited inInternational search[XI]US2013326088  (UCHIDA YASUHIKO [JP]) [X] 15 * paragraphs [0028] - [0036] * * paragraphs [0045] - [0052]; figures 2,3 * * paragraphs [0076] - [0093]; figures 4,5 * [I] 1-14;
 [A]  - PAOLO FERRARI ET AL, "Architecture of an embedded time gateway between PTP and SNTP", INDUSTRIAL EMBEDDED SYSTEMS (SIES), 2011 6TH IEEE INTERNATIONAL SYMPOSIUM ON, IEEE, (20110615), doi:10.1109/SIES.2011.5953683, ISBN 978-1-61284-818-1, pages 71 - 74, XP031893734 [A] 11,12,14 * abstract * * paragraphs [000I] - [0III] *

DOI:   http://dx.doi.org/10.1109/SIES.2011.5953683
 [A]  - FERRARI P ET AL, "On the Seamless Interconnection of IEEE1588-Based Devices Using a PROFINET IO Infrastructure", IEEE TRANSACTIONS ON INDUSTRIAL INFORMATICS, IEEE SERVICE CENTER, NEW YORK, NY, US, (20100801), vol. 6, no. 3, doi:10.1109/TII.2010.2051954, ISSN 1551-3203, pages 381 - 392, XP011334330 [A] 1-15 * abstract * * paragraphs [00II] - [0III] *

DOI:   http://dx.doi.org/10.1109/TII.2010.2051954
 [A]  - ESTRELA PEDRO V ET AL, "Using a multi-source NTP watchdog to increase the robustness of PTPv2 in financial industry networks", 2014 IEEE INTERNATIONAL SYMPOSIUM ON PRECISION CLOCK SYNCHRONIZATION FOR MEASUREMENT, CONTROL, AND COMMUNICATION (ISPCS), IEEE, (20140922), doi:10.1109/ISPCS.2014.6948697, pages 87 - 92, XP032677602 [A] 1-15 * paragraph [IV.B] *

DOI:   http://dx.doi.org/10.1109/ISPCS.2014.6948697
 [A]  - GOETZ FRANZ-JOSEF ET AL, "Dual Time Scale in Factory & Energy Automation", IEEE DRAFT; AS-GOETZ-IND-REQ-0712-V2, IEEE-SA, PISCATAWAY, NJ USA, (20120716), vol. 802.1, no. v2, pages 1 - 26, XP068008500 [A] 1-15 * page 1 * * page 4 * * page 7 * * paragraph [05.3] *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.