EP3277204 - ACETABULAR GUIDE SYSTEM FOR PLACING A GUIDE PIN [Right-click to bookmark this link] | |||
Former [2018/06] | ACETABULAR GUIDE SYSTEM AND METHOD FOR PLACING A GUIDE PIN | ||
[2020/14] | Status | No opposition filed within time limit Status updated on 30.07.2021 Database last updated on 20.05.2024 | |
Former | The patent has been granted Status updated on 21.08.2020 | ||
Former | Grant of patent is intended Status updated on 31.03.2020 | ||
Former | Request for examination was made Status updated on 05.01.2018 | ||
Former | The international publication has been made Status updated on 30.10.2017 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states Biomet Manufacturing, LLC 56 East Bell Drive Warsaw, IN 46582 / US | [2018/06] | Inventor(s) | 01 /
WITT, Tyler D. 4379 Basswood Drive Warsaw, Indiana 46582 / US | 02 /
DAVENPORT, Austen 2736 N. 50 W. Columbia City, Indiana 46725 / US | [2018/06] | Representative(s) | Mays, Julie, et al Venner Shipley LLP 200 Aldersgate London, EC1A 4HD / GB | [2018/06] | Application number, filing date | 16714729.7 | 29.03.2016 | [2018/06] | WO2016US24685 | Priority number, date | US201514673230 | 30.03.2015 Original published format: US201514673230 | [2018/06] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016160788 | Date: | 06.10.2016 | Language: | EN | [2016/40] | Type: | A1 Application with search report | No.: | EP3277204 | Date: | 07.02.2018 | Language: | EN | The application published by WIPO in one of the EPO official languages on 06.10.2016 takes the place of the publication of the European patent application. | [2018/06] | Type: | B1 Patent specification | No.: | EP3277204 | Date: | 23.09.2020 | Language: | EN | [2020/39] | Search report(s) | International search report - published on: | EP | 06.10.2016 | Classification | IPC: | A61B17/17, A61B17/88 | [2018/06] | CPC: |
A61B17/8872 (EP,CN,US);
A61F2/34 (CN,US);
A61F2/4609 (CN,US);
A61B17/1746 (EP,CN,US);
A61B17/8897 (CN,US);
A61B2017/568 (EP,CN,US);
A61B2034/108 (EP,CN,US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/06] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | HÜFTGELENKFÜHRUNGSSYSTEM ZUM PLATZIEREN EINES FÜHRUNGSSTIFTS | [2020/14] | English: | ACETABULAR GUIDE SYSTEM FOR PLACING A GUIDE PIN | [2020/14] | French: | SYSTÈME DE GUIDE ACÉTABULAIRE POUR PLACER UNE BROCHE DE GUIDAGE | [2020/14] |
Former [2018/06] | HÜFTGELENKFÜHRUNGSSYSTEM UND VERFAHREN ZUM PLATZIEREN EINES FÜHRUNGSSTIFTS | ||
Former [2018/06] | ACETABULAR GUIDE SYSTEM AND METHOD FOR PLACING A GUIDE PIN | ||
Former [2018/06] | SYSTÈME DE GUIDE ACÉTABULAIRE ET PROCÉDÉ POUR PLACER UNE BROCHE DE GUIDAGE | Entry into regional phase | 30.10.2017 | National basic fee paid | 30.10.2017 | Designation fee(s) paid | 30.10.2017 | Examination fee paid | Examination procedure | 30.10.2017 | Examination requested [2018/06] | 30.10.2017 | Date on which the examining division has become responsible | 18.06.2018 | Amendment by applicant (claims and/or description) | 01.04.2020 | Communication of intention to grant the patent | 11.08.2020 | Fee for grant paid | 11.08.2020 | Fee for publishing/printing paid | 11.08.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 24.06.2021 | No opposition filed within time limit [2021/35] | Fees paid | Renewal fee | 13.03.2018 | Renewal fee patent year 03 | 11.03.2019 | Renewal fee patent year 04 | 03.03.2020 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 29.03.2016 | AL | 23.09.2020 | AT | 23.09.2020 | CY | 23.09.2020 | CZ | 23.09.2020 | DK | 23.09.2020 | EE | 23.09.2020 | ES | 23.09.2020 | FI | 23.09.2020 | HR | 23.09.2020 | IT | 23.09.2020 | LT | 23.09.2020 | LV | 23.09.2020 | MC | 23.09.2020 | MK | 23.09.2020 | NL | 23.09.2020 | PL | 23.09.2020 | RO | 23.09.2020 | RS | 23.09.2020 | SE | 23.09.2020 | SI | 23.09.2020 | SK | 23.09.2020 | SM | 23.09.2020 | BG | 23.12.2020 | NO | 23.12.2020 | GR | 24.12.2020 | IS | 23.01.2021 | PT | 25.01.2021 | IE | 29.03.2021 | LU | 29.03.2021 | BE | 31.03.2021 | [2024/22] |
Former [2023/33] | HU | 29.03.2016 | |
AL | 23.09.2020 | ||
AT | 23.09.2020 | ||
CY | 23.09.2020 | ||
CZ | 23.09.2020 | ||
DK | 23.09.2020 | ||
EE | 23.09.2020 | ||
ES | 23.09.2020 | ||
FI | 23.09.2020 | ||
HR | 23.09.2020 | ||
IT | 23.09.2020 | ||
LT | 23.09.2020 | ||
LV | 23.09.2020 | ||
MC | 23.09.2020 | ||
NL | 23.09.2020 | ||
PL | 23.09.2020 | ||
RO | 23.09.2020 | ||
RS | 23.09.2020 | ||
SE | 23.09.2020 | ||
SI | 23.09.2020 | ||
SK | 23.09.2020 | ||
SM | 23.09.2020 | ||
BG | 23.12.2020 | ||
NO | 23.12.2020 | ||
GR | 24.12.2020 | ||
IS | 23.01.2021 | ||
PT | 25.01.2021 | ||
IE | 29.03.2021 | ||
LU | 29.03.2021 | ||
BE | 31.03.2021 | ||
Former [2023/30] | AL | 23.09.2020 | |
AT | 23.09.2020 | ||
CY | 23.09.2020 | ||
CZ | 23.09.2020 | ||
DK | 23.09.2020 | ||
EE | 23.09.2020 | ||
ES | 23.09.2020 | ||
FI | 23.09.2020 | ||
HR | 23.09.2020 | ||
IT | 23.09.2020 | ||
LT | 23.09.2020 | ||
LV | 23.09.2020 | ||
MC | 23.09.2020 | ||
NL | 23.09.2020 | ||
PL | 23.09.2020 | ||
RO | 23.09.2020 | ||
RS | 23.09.2020 | ||
SE | 23.09.2020 | ||
SI | 23.09.2020 | ||
SK | 23.09.2020 | ||
SM | 23.09.2020 | ||
BG | 23.12.2020 | ||
NO | 23.12.2020 | ||
GR | 24.12.2020 | ||
IS | 23.01.2021 | ||
PT | 25.01.2021 | ||
IE | 29.03.2021 | ||
LU | 29.03.2021 | ||
BE | 31.03.2021 | ||
Former [2023/29] | AL | 23.09.2020 | |
AT | 23.09.2020 | ||
CZ | 23.09.2020 | ||
DK | 23.09.2020 | ||
EE | 23.09.2020 | ||
ES | 23.09.2020 | ||
FI | 23.09.2020 | ||
HR | 23.09.2020 | ||
IT | 23.09.2020 | ||
LT | 23.09.2020 | ||
LV | 23.09.2020 | ||
MC | 23.09.2020 | ||
NL | 23.09.2020 | ||
PL | 23.09.2020 | ||
RO | 23.09.2020 | ||
RS | 23.09.2020 | ||
SE | 23.09.2020 | ||
SI | 23.09.2020 | ||
SK | 23.09.2020 | ||
SM | 23.09.2020 | ||
BG | 23.12.2020 | ||
NO | 23.12.2020 | ||
GR | 24.12.2020 | ||
IS | 23.01.2021 | ||
PT | 25.01.2021 | ||
IE | 29.03.2021 | ||
LU | 29.03.2021 | ||
BE | 31.03.2021 | ||
Former [2022/34] | AL | 23.09.2020 | |
AT | 23.09.2020 | ||
CZ | 23.09.2020 | ||
DK | 23.09.2020 | ||
EE | 23.09.2020 | ||
ES | 23.09.2020 | ||
FI | 23.09.2020 | ||
HR | 23.09.2020 | ||
IT | 23.09.2020 | ||
LT | 23.09.2020 | ||
LV | 23.09.2020 | ||
MC | 23.09.2020 | ||
PL | 23.09.2020 | ||
RO | 23.09.2020 | ||
RS | 23.09.2020 | ||
SE | 23.09.2020 | ||
SI | 23.09.2020 | ||
SK | 23.09.2020 | ||
SM | 23.09.2020 | ||
BG | 23.12.2020 | ||
NO | 23.12.2020 | ||
GR | 24.12.2020 | ||
IS | 23.01.2021 | ||
PT | 25.01.2021 | ||
IE | 29.03.2021 | ||
LU | 29.03.2021 | ||
BE | 31.03.2021 | ||
Former [2022/09] | AL | 23.09.2020 | |
AT | 23.09.2020 | ||
CZ | 23.09.2020 | ||
DK | 23.09.2020 | ||
EE | 23.09.2020 | ||
ES | 23.09.2020 | ||
FI | 23.09.2020 | ||
HR | 23.09.2020 | ||
IT | 23.09.2020 | ||
LT | 23.09.2020 | ||
LV | 23.09.2020 | ||
MC | 23.09.2020 | ||
PL | 23.09.2020 | ||
RO | 23.09.2020 | ||
RS | 23.09.2020 | ||
SE | 23.09.2020 | ||
SI | 23.09.2020 | ||
SK | 23.09.2020 | ||
SM | 23.09.2020 | ||
BG | 23.12.2020 | ||
NO | 23.12.2020 | ||
GR | 24.12.2020 | ||
IS | 23.01.2021 | ||
PT | 25.01.2021 | ||
IE | 29.03.2021 | ||
LU | 29.03.2021 | ||
Former [2022/07] | AL | 23.09.2020 | |
AT | 23.09.2020 | ||
CZ | 23.09.2020 | ||
DK | 23.09.2020 | ||
EE | 23.09.2020 | ||
ES | 23.09.2020 | ||
FI | 23.09.2020 | ||
HR | 23.09.2020 | ||
IT | 23.09.2020 | ||
LT | 23.09.2020 | ||
LV | 23.09.2020 | ||
MC | 23.09.2020 | ||
PL | 23.09.2020 | ||
RO | 23.09.2020 | ||
RS | 23.09.2020 | ||
SE | 23.09.2020 | ||
SI | 23.09.2020 | ||
SK | 23.09.2020 | ||
SM | 23.09.2020 | ||
BG | 23.12.2020 | ||
NO | 23.12.2020 | ||
GR | 24.12.2020 | ||
IS | 23.01.2021 | ||
PT | 25.01.2021 | ||
IE | 29.03.2021 | ||
Former [2021/48] | AL | 23.09.2020 | |
AT | 23.09.2020 | ||
CZ | 23.09.2020 | ||
DK | 23.09.2020 | ||
EE | 23.09.2020 | ||
ES | 23.09.2020 | ||
FI | 23.09.2020 | ||
HR | 23.09.2020 | ||
IT | 23.09.2020 | ||
LT | 23.09.2020 | ||
LV | 23.09.2020 | ||
MC | 23.09.2020 | ||
PL | 23.09.2020 | ||
RO | 23.09.2020 | ||
RS | 23.09.2020 | ||
SE | 23.09.2020 | ||
SI | 23.09.2020 | ||
SK | 23.09.2020 | ||
SM | 23.09.2020 | ||
BG | 23.12.2020 | ||
NO | 23.12.2020 | ||
GR | 24.12.2020 | ||
IS | 23.01.2021 | ||
PT | 25.01.2021 | ||
Former [2021/45] | AL | 23.09.2020 | |
AT | 23.09.2020 | ||
CZ | 23.09.2020 | ||
DK | 23.09.2020 | ||
EE | 23.09.2020 | ||
ES | 23.09.2020 | ||
FI | 23.09.2020 | ||
HR | 23.09.2020 | ||
LT | 23.09.2020 | ||
LV | 23.09.2020 | ||
MC | 23.09.2020 | ||
PL | 23.09.2020 | ||
RO | 23.09.2020 | ||
RS | 23.09.2020 | ||
SE | 23.09.2020 | ||
SI | 23.09.2020 | ||
SK | 23.09.2020 | ||
SM | 23.09.2020 | ||
BG | 23.12.2020 | ||
NO | 23.12.2020 | ||
GR | 24.12.2020 | ||
IS | 23.01.2021 | ||
PT | 25.01.2021 | ||
Former [2021/37] | AL | 23.09.2020 | |
AT | 23.09.2020 | ||
CZ | 23.09.2020 | ||
DK | 23.09.2020 | ||
EE | 23.09.2020 | ||
ES | 23.09.2020 | ||
FI | 23.09.2020 | ||
HR | 23.09.2020 | ||
LT | 23.09.2020 | ||
LV | 23.09.2020 | ||
PL | 23.09.2020 | ||
RO | 23.09.2020 | ||
RS | 23.09.2020 | ||
SE | 23.09.2020 | ||
SI | 23.09.2020 | ||
SK | 23.09.2020 | ||
SM | 23.09.2020 | ||
BG | 23.12.2020 | ||
NO | 23.12.2020 | ||
GR | 24.12.2020 | ||
IS | 23.01.2021 | ||
PT | 25.01.2021 | ||
Former [2021/36] | AL | 23.09.2020 | |
AT | 23.09.2020 | ||
CZ | 23.09.2020 | ||
EE | 23.09.2020 | ||
ES | 23.09.2020 | ||
FI | 23.09.2020 | ||
HR | 23.09.2020 | ||
LT | 23.09.2020 | ||
LV | 23.09.2020 | ||
PL | 23.09.2020 | ||
RO | 23.09.2020 | ||
RS | 23.09.2020 | ||
SE | 23.09.2020 | ||
SI | 23.09.2020 | ||
SK | 23.09.2020 | ||
SM | 23.09.2020 | ||
BG | 23.12.2020 | ||
NO | 23.12.2020 | ||
GR | 24.12.2020 | ||
IS | 23.01.2021 | ||
PT | 25.01.2021 | ||
Former [2021/28] | AL | 23.09.2020 | |
AT | 23.09.2020 | ||
CZ | 23.09.2020 | ||
EE | 23.09.2020 | ||
ES | 23.09.2020 | ||
FI | 23.09.2020 | ||
HR | 23.09.2020 | ||
LT | 23.09.2020 | ||
LV | 23.09.2020 | ||
PL | 23.09.2020 | ||
RO | 23.09.2020 | ||
RS | 23.09.2020 | ||
SE | 23.09.2020 | ||
SK | 23.09.2020 | ||
SM | 23.09.2020 | ||
BG | 23.12.2020 | ||
NO | 23.12.2020 | ||
GR | 24.12.2020 | ||
IS | 23.01.2021 | ||
PT | 25.01.2021 | ||
Former [2021/25] | AL | 23.09.2020 | |
AT | 23.09.2020 | ||
CZ | 23.09.2020 | ||
EE | 23.09.2020 | ||
ES | 23.09.2020 | ||
FI | 23.09.2020 | ||
HR | 23.09.2020 | ||
LT | 23.09.2020 | ||
LV | 23.09.2020 | ||
PL | 23.09.2020 | ||
RO | 23.09.2020 | ||
RS | 23.09.2020 | ||
SE | 23.09.2020 | ||
SM | 23.09.2020 | ||
BG | 23.12.2020 | ||
NO | 23.12.2020 | ||
GR | 24.12.2020 | ||
IS | 23.01.2021 | ||
PT | 25.01.2021 | ||
Former [2021/23] | AT | 23.09.2020 | |
CZ | 23.09.2020 | ||
EE | 23.09.2020 | ||
FI | 23.09.2020 | ||
HR | 23.09.2020 | ||
LT | 23.09.2020 | ||
LV | 23.09.2020 | ||
RO | 23.09.2020 | ||
RS | 23.09.2020 | ||
SE | 23.09.2020 | ||
SM | 23.09.2020 | ||
BG | 23.12.2020 | ||
NO | 23.12.2020 | ||
GR | 24.12.2020 | ||
PT | 25.01.2021 | ||
Former [2021/22] | CZ | 23.09.2020 | |
EE | 23.09.2020 | ||
FI | 23.09.2020 | ||
HR | 23.09.2020 | ||
LT | 23.09.2020 | ||
LV | 23.09.2020 | ||
RO | 23.09.2020 | ||
RS | 23.09.2020 | ||
SE | 23.09.2020 | ||
BG | 23.12.2020 | ||
NO | 23.12.2020 | ||
GR | 24.12.2020 | ||
PT | 25.01.2021 | ||
Former [2021/21] | FI | 23.09.2020 | |
HR | 23.09.2020 | ||
LT | 23.09.2020 | ||
LV | 23.09.2020 | ||
RS | 23.09.2020 | ||
SE | 23.09.2020 | ||
BG | 23.12.2020 | ||
NO | 23.12.2020 | ||
GR | 24.12.2020 | ||
PT | 25.01.2021 | ||
Former [2021/20] | FI | 23.09.2020 | |
HR | 23.09.2020 | ||
LT | 23.09.2020 | ||
LV | 23.09.2020 | ||
RS | 23.09.2020 | ||
SE | 23.09.2020 | ||
BG | 23.12.2020 | ||
NO | 23.12.2020 | ||
GR | 24.12.2020 | ||
Former [2021/10] | FI | 23.09.2020 | |
HR | 23.09.2020 | ||
LV | 23.09.2020 | ||
RS | 23.09.2020 | ||
SE | 23.09.2020 | ||
BG | 23.12.2020 | ||
NO | 23.12.2020 | ||
GR | 24.12.2020 | ||
Former [2021/08] | FI | 23.09.2020 | |
SE | 23.09.2020 | ||
BG | 23.12.2020 | ||
NO | 23.12.2020 | ||
Former [2021/07] | FI | 23.09.2020 | |
NO | 23.12.2020 | Cited in | International search | [A]WO2011080260 (MOBELIFE NV [BE], et al) [A] 1 * page 33, line 34 - page 35, line 7; figures 1,2C-4 *; | [A]WO2013153401 (IMP INNOVATIONS LTD [GB]) [A] 1* the whole document *; | [A]US2014163565 (BOLLINGER MARK A [US]) [A] 1-8 * paragraphs [0041] - [0043]; figures 1A-4,12A-14 *; | [A]US2014243831 (WITT TYLER [US]) [A] 1 * paragraph [0041]; figures 2,3,4,4a *; | [A]US2014276870 (EASH CHRISTOPHER [US]) [A] 1 * the whole document * | by applicant | US2008114370 | US2009024131 | US2011184419 | US2011224674 | US8070752 | US8092465 | US8133234 | US2012226283 | US8298237 | US2014276873 |