EP3303062 - ARRANGEMENT FOR FIXING A STRIP-SHAPED ATTACHEMENT [Right-click to bookmark this link] | |||
Former [2018/15] | ARRANGEMENT FOR FASTENING A RAIL-SHAPED ATTACHMENT PART | ||
[2018/52] | Status | No opposition filed within time limit Status updated on 09.10.2020 Database last updated on 11.05.2024 | |
Former | The patent has been granted Status updated on 01.11.2019 | ||
Former | Grant of patent is intended Status updated on 27.06.2019 | ||
Former | Request for examination was made Status updated on 15.04.2019 | ||
Former | Grant of patent is intended Status updated on 11.12.2018 | ||
Former | Request for examination was made Status updated on 09.03.2018 | ||
Former | The international publication has been made Status updated on 09.12.2016 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Volkswagen Aktiengesellschaft Berliner Ring 2 38440 Wolfsburg / DE | [2019/49] |
Former [2018/15] | For all designated states Volkswagen Aktiengesellschaft Berliner Ring 2 38440 Wolfsburg / DE | Inventor(s) | 01 /
JUNGA, Jan Suhlgarten 8 38440 Wolfsburg / DE | [2018/15] | Representative(s) | Clarenbach, Carl-Philipp, et al Gleiss Große Schrell und Partner mbB Patentanwälte Rechtsanwälte Leitzstraße 45 70469 Stuttgart / DE | [2019/49] | Application number, filing date | 16714876.6 | 05.04.2016 | [2018/15] | WO2016EP57451 | Priority number, date | DE201510209997 | 29.05.2015 Original published format: DE102015209997 | [2018/15] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2016192872 | Date: | 08.12.2016 | Language: | DE | [2016/49] | Type: | A1 Application with search report | No.: | EP3303062 | Date: | 11.04.2018 | Language: | DE | The application published by WIPO in one of the EPO official languages on 08.12.2016 takes the place of the publication of the European patent application. | [2018/15] | Type: | B1 Patent specification | No.: | EP3303062 | Date: | 04.12.2019 | Language: | DE | [2019/49] | Search report(s) | International search report - published on: | EP | 08.12.2016 | Classification | IPC: | B60R13/04 | [2018/15] | CPC: |
B60R13/04 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/15] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | ANORDNUNG ZUR BEFESTIGUNG EINES LEISTENFÖRMIGEN ANBAUTEILS | [2018/15] | English: | ARRANGEMENT FOR FIXING A STRIP-SHAPED ATTACHEMENT | [2019/25] | French: | ARRANGEMENT POUR LA FIXATION D'UN ELEMENT EN FORME DE REGLETTE | [2019/25] |
Former [2018/15] | ARRANGEMENT FOR FASTENING A RAIL-SHAPED ATTACHMENT PART | ||
Former [2018/15] | SYSTÈME DE FIXATION D'UNE PIÈCE RAPPORTÉE EN FORME DE BAGUETTE | Entry into regional phase | 02.01.2018 | National basic fee paid | 02.01.2018 | Designation fee(s) paid | 02.01.2018 | Examination fee paid | Examination procedure | 20.09.2017 | Date on which the examining division has become responsible | 02.01.2018 | Examination requested [2018/15] | 18.07.2018 | Amendment by applicant (claims and/or description) | 12.12.2018 | Communication of intention to grant the patent | 12.04.2019 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 28.06.2019 | Communication of intention to grant the patent | 24.10.2019 | Fee for grant paid | 24.10.2019 | Fee for publishing/printing paid | 24.10.2019 | Receipt of the translation of the claim(s) | Opposition(s) | 07.09.2020 | No opposition filed within time limit [2020/46] | Fees paid | Renewal fee | 30.04.2018 | Renewal fee patent year 03 | 30.04.2019 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 05.04.2016 | AL | 04.12.2019 | CY | 04.12.2019 | CZ | 04.12.2019 | DK | 04.12.2019 | EE | 04.12.2019 | ES | 04.12.2019 | FI | 04.12.2019 | HR | 04.12.2019 | IT | 04.12.2019 | LT | 04.12.2019 | LV | 04.12.2019 | MC | 04.12.2019 | MK | 04.12.2019 | MT | 04.12.2019 | NL | 04.12.2019 | PL | 04.12.2019 | RO | 04.12.2019 | RS | 04.12.2019 | SE | 04.12.2019 | SI | 04.12.2019 | SK | 04.12.2019 | SM | 04.12.2019 | TR | 04.12.2019 | BG | 04.03.2020 | NO | 04.03.2020 | GR | 05.03.2020 | IS | 04.04.2020 | GB | 05.04.2020 | IE | 05.04.2020 | LU | 05.04.2020 | PT | 29.04.2020 | BE | 30.04.2020 | CH | 30.04.2020 | LI | 30.04.2020 | [2022/32] |
Former [2022/27] | HU | 05.04.2016 | |
AL | 04.12.2019 | ||
CY | 04.12.2019 | ||
CZ | 04.12.2019 | ||
DK | 04.12.2019 | ||
EE | 04.12.2019 | ||
ES | 04.12.2019 | ||
FI | 04.12.2019 | ||
HR | 04.12.2019 | ||
IT | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
MC | 04.12.2019 | ||
MT | 04.12.2019 | ||
NL | 04.12.2019 | ||
PL | 04.12.2019 | ||
RO | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
SI | 04.12.2019 | ||
SK | 04.12.2019 | ||
SM | 04.12.2019 | ||
TR | 04.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
IS | 04.04.2020 | ||
GB | 05.04.2020 | ||
IE | 05.04.2020 | ||
LU | 05.04.2020 | ||
PT | 29.04.2020 | ||
BE | 30.04.2020 | ||
CH | 30.04.2020 | ||
LI | 30.04.2020 | ||
Former [2021/22] | AL | 04.12.2019 | |
CZ | 04.12.2019 | ||
DK | 04.12.2019 | ||
EE | 04.12.2019 | ||
ES | 04.12.2019 | ||
FI | 04.12.2019 | ||
HR | 04.12.2019 | ||
IT | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
MC | 04.12.2019 | ||
NL | 04.12.2019 | ||
PL | 04.12.2019 | ||
RO | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
SI | 04.12.2019 | ||
SK | 04.12.2019 | ||
SM | 04.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
IS | 04.04.2020 | ||
GB | 05.04.2020 | ||
IE | 05.04.2020 | ||
LU | 05.04.2020 | ||
PT | 29.04.2020 | ||
BE | 30.04.2020 | ||
CH | 30.04.2020 | ||
LI | 30.04.2020 | ||
Former [2021/20] | AL | 04.12.2019 | |
CZ | 04.12.2019 | ||
DK | 04.12.2019 | ||
EE | 04.12.2019 | ||
ES | 04.12.2019 | ||
FI | 04.12.2019 | ||
HR | 04.12.2019 | ||
IT | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
MC | 04.12.2019 | ||
NL | 04.12.2019 | ||
PL | 04.12.2019 | ||
RO | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
SI | 04.12.2019 | ||
SK | 04.12.2019 | ||
SM | 04.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
IS | 04.04.2020 | ||
IE | 05.04.2020 | ||
LU | 05.04.2020 | ||
PT | 29.04.2020 | ||
BE | 30.04.2020 | ||
CH | 30.04.2020 | ||
LI | 30.04.2020 | ||
Former [2021/10] | AL | 04.12.2019 | |
CZ | 04.12.2019 | ||
DK | 04.12.2019 | ||
EE | 04.12.2019 | ||
ES | 04.12.2019 | ||
FI | 04.12.2019 | ||
HR | 04.12.2019 | ||
IT | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
MC | 04.12.2019 | ||
NL | 04.12.2019 | ||
PL | 04.12.2019 | ||
RO | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
SI | 04.12.2019 | ||
SK | 04.12.2019 | ||
SM | 04.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
IS | 04.04.2020 | ||
LU | 05.04.2020 | ||
PT | 29.04.2020 | ||
BE | 30.04.2020 | ||
CH | 30.04.2020 | ||
LI | 30.04.2020 | ||
Former [2021/08] | AL | 04.12.2019 | |
CZ | 04.12.2019 | ||
DK | 04.12.2019 | ||
EE | 04.12.2019 | ||
ES | 04.12.2019 | ||
FI | 04.12.2019 | ||
HR | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
MC | 04.12.2019 | ||
NL | 04.12.2019 | ||
PL | 04.12.2019 | ||
RO | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
SI | 04.12.2019 | ||
SK | 04.12.2019 | ||
SM | 04.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
IS | 04.04.2020 | ||
LU | 05.04.2020 | ||
PT | 29.04.2020 | ||
CH | 30.04.2020 | ||
LI | 30.04.2020 | ||
Former [2020/52] | AL | 04.12.2019 | |
CZ | 04.12.2019 | ||
DK | 04.12.2019 | ||
EE | 04.12.2019 | ||
ES | 04.12.2019 | ||
FI | 04.12.2019 | ||
HR | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
MC | 04.12.2019 | ||
NL | 04.12.2019 | ||
PL | 04.12.2019 | ||
RO | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
SI | 04.12.2019 | ||
SK | 04.12.2019 | ||
SM | 04.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
IS | 04.04.2020 | ||
PT | 29.04.2020 | ||
Former [2020/51] | AL | 04.12.2019 | |
CZ | 04.12.2019 | ||
DK | 04.12.2019 | ||
EE | 04.12.2019 | ||
ES | 04.12.2019 | ||
FI | 04.12.2019 | ||
HR | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
NL | 04.12.2019 | ||
PL | 04.12.2019 | ||
RO | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
SI | 04.12.2019 | ||
SK | 04.12.2019 | ||
SM | 04.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
IS | 04.04.2020 | ||
PT | 29.04.2020 | ||
Former [2020/47] | AL | 04.12.2019 | |
CZ | 04.12.2019 | ||
DK | 04.12.2019 | ||
EE | 04.12.2019 | ||
ES | 04.12.2019 | ||
FI | 04.12.2019 | ||
HR | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
NL | 04.12.2019 | ||
RO | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
SK | 04.12.2019 | ||
SM | 04.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
IS | 04.04.2020 | ||
PT | 29.04.2020 | ||
Former [2020/40] | AL | 04.12.2019 | |
CZ | 04.12.2019 | ||
EE | 04.12.2019 | ||
ES | 04.12.2019 | ||
FI | 04.12.2019 | ||
HR | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
NL | 04.12.2019 | ||
RO | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
SK | 04.12.2019 | ||
SM | 04.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
IS | 04.04.2020 | ||
PT | 29.04.2020 | ||
Former [2020/37] | AL | 04.12.2019 | |
CZ | 04.12.2019 | ||
EE | 04.12.2019 | ||
ES | 04.12.2019 | ||
FI | 04.12.2019 | ||
HR | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
NL | 04.12.2019 | ||
RO | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
SK | 04.12.2019 | ||
SM | 04.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
PT | 29.04.2020 | ||
Former [2020/36] | AL | 04.12.2019 | |
CZ | 04.12.2019 | ||
EE | 04.12.2019 | ||
ES | 04.12.2019 | ||
FI | 04.12.2019 | ||
HR | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
NL | 04.12.2019 | ||
RO | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
PT | 29.04.2020 | ||
Former [2020/35] | AL | 04.12.2019 | |
CZ | 04.12.2019 | ||
ES | 04.12.2019 | ||
FI | 04.12.2019 | ||
HR | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
NL | 04.12.2019 | ||
RO | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
Former [2020/34] | AL | 04.12.2019 | |
ES | 04.12.2019 | ||
FI | 04.12.2019 | ||
HR | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
NL | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
Former [2020/32] | AL | 04.12.2019 | |
FI | 04.12.2019 | ||
HR | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
NL | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
Former [2020/26] | FI | 04.12.2019 | |
HR | 04.12.2019 | ||
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
RS | 04.12.2019 | ||
SE | 04.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
Former [2020/23] | FI | 04.12.2019 | |
LT | 04.12.2019 | ||
LV | 04.12.2019 | ||
SE | 04.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
GR | 05.03.2020 | ||
Former [2020/22] | FI | 04.12.2019 | |
LT | 04.12.2019 | ||
SE | 04.12.2019 | ||
BG | 04.03.2020 | ||
NO | 04.03.2020 | ||
Former [2020/21] | NO | 04.03.2020 | Cited in | International search | [XY]DE1430924 (DAIMLER BENZ AG) [X] 1,4 * page 3, line 15 - line 18; figure 2 *[Y] 2; | [XY]FR2887598 (REHAU SA [FR]) [X] 1,4,7 * figures 18,19 * [Y] 2 | by applicant | DE9006548U | DE19803402 | DE10303365 |