blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3286448

EP3286448 - ACTUATION BEARING [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  10.07.2020
Database last updated on 24.08.2024
FormerThe patent has been granted
Status updated on  31.05.2019
FormerGrant of patent is intended
Status updated on  19.02.2019
FormerRequest for examination was made
Status updated on  26.01.2018
FormerThe international publication has been made
Status updated on  24.11.2017
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
Schaeffler Technologies AG & Co. KG
Industriestrasse 1-3
91074 Herzogenaurach / DE
[2018/09]
Inventor(s)01 / BATALHA, Tiago
João Ramalho 39
13309 045 Itu / BR
02 / CURY, Rudoniel Correa
Mmdc Street 539
Apartment 11
05510-021 Sao Paulo / BR
 [2019/27]
Former [2018/33]01 / BATALHA, Tiago
João Ramalho 39
13309 045 Itu / BR
02 / CURY, Rudoniel Correa
Ana Rosa Alves Carriel, 1
18103-518 Sorocaba / BR
Former [2018/09]01 / BATALHA, Tiago
João Ramalho 39
13309 045 Itu / BR
02 / CURY, Rudoniel
Ana alves carriel Nr. 1
18080-100 Brazilian / BR
Application number, filing date16718848.116.03.2016
[2018/09]
WO2016DE200142
Priority number, dateDE20151020707720.04.2015         Original published format: DE102015207077
[2018/09]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2016169558
Date:27.10.2016
Language:DE
[2016/43]
Type: A1 Application with search report 
No.:EP3286448
Date:28.02.2018
Language:DE
The application published by WIPO in one of the EPO official languages on 27.10.2016 takes the place of the publication of the European patent application.
[2018/09]
Type: B1 Patent specification 
No.:EP3286448
Date:03.07.2019
Language:DE
[2019/27]
Search report(s)International search report - published on:EP27.10.2016
ClassificationIPC:F16D23/14, F16D25/08, F16D25/12
[2018/09]
CPC:
F16D25/083 (EP); F16C25/06 (EP); F16D23/14 (EP);
F16D25/12 (EP); F16C19/163 (EP); F16C2361/43 (EP);
F16D2300/18 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/09]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:BETÄTIGUNGSLAGER[2018/09]
English:ACTUATION BEARING[2018/09]
French:PALIER D'ACTIONNEMENT[2018/09]
Entry into regional phase20.11.2017National basic fee paid 
20.11.2017Designation fee(s) paid 
20.11.2017Examination fee paid 
Examination procedure12.10.2017Date on which the examining division has become responsible
20.11.2017Examination requested  [2018/09]
11.04.2018Amendment by applicant (claims and/or description)
20.02.2019Communication of intention to grant the patent
23.05.2019Fee for grant paid
23.05.2019Fee for publishing/printing paid
23.05.2019Receipt of the translation of the claim(s)
Opposition(s)03.06.2020No opposition filed within time limit [2020/33]
Fees paidRenewal fee
09.04.2018Renewal fee patent year 03
01.04.2019Renewal fee patent year 04
Penalty fee
Additional fee for renewal fee
31.03.201803   M06   Fee paid on   01.10.2018
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU16.03.2016
AL03.07.2019
CY03.07.2019
CZ03.07.2019
DK03.07.2019
EE03.07.2019
ES03.07.2019
FI03.07.2019
HR03.07.2019
IT03.07.2019
LT03.07.2019
LV03.07.2019
MC03.07.2019
MK03.07.2019
MT03.07.2019
NL03.07.2019
PL03.07.2019
RO03.07.2019
RS03.07.2019
SE03.07.2019
SI03.07.2019
SK03.07.2019
SM03.07.2019
TR03.07.2019
BG03.10.2019
NO03.10.2019
GR04.10.2019
IS03.11.2019
PT04.11.2019
GB16.03.2020
IE16.03.2020
LU16.03.2020
BE31.03.2020
CH31.03.2020
FR31.03.2020
LI31.03.2020
[2022/32]
Former [2022/28]HU16.03.2016
AL03.07.2019
CY03.07.2019
CZ03.07.2019
DK03.07.2019
EE03.07.2019
ES03.07.2019
FI03.07.2019
HR03.07.2019
IT03.07.2019
LT03.07.2019
LV03.07.2019
MC03.07.2019
MT03.07.2019
NL03.07.2019
PL03.07.2019
RO03.07.2019
RS03.07.2019
SE03.07.2019
SI03.07.2019
SK03.07.2019
SM03.07.2019
TR03.07.2019
BG03.10.2019
NO03.10.2019
GR04.10.2019
IS03.11.2019
PT04.11.2019
GB16.03.2020
IE16.03.2020
LU16.03.2020
BE31.03.2020
CH31.03.2020
FR31.03.2020
LI31.03.2020
Former [2021/22]AL03.07.2019
CZ03.07.2019
DK03.07.2019
EE03.07.2019
ES03.07.2019
FI03.07.2019
HR03.07.2019
IT03.07.2019
LT03.07.2019
LV03.07.2019
MC03.07.2019
NL03.07.2019
PL03.07.2019
RO03.07.2019
RS03.07.2019
SE03.07.2019
SI03.07.2019
SK03.07.2019
SM03.07.2019
TR03.07.2019
BG03.10.2019
NO03.10.2019
GR04.10.2019
IS03.11.2019
PT04.11.2019
GB16.03.2020
IE16.03.2020
LU16.03.2020
BE31.03.2020
CH31.03.2020
FR31.03.2020
LI31.03.2020
Former [2021/13]AL03.07.2019
CZ03.07.2019
DK03.07.2019
EE03.07.2019
ES03.07.2019
FI03.07.2019
HR03.07.2019
IT03.07.2019
LT03.07.2019
LV03.07.2019
MC03.07.2019
NL03.07.2019
PL03.07.2019
RO03.07.2019
RS03.07.2019
SE03.07.2019
SI03.07.2019
SK03.07.2019
SM03.07.2019
TR03.07.2019
BG03.10.2019
NO03.10.2019
GR04.10.2019
IS03.11.2019
PT04.11.2019
IE16.03.2020
LU16.03.2020
BE31.03.2020
CH31.03.2020
FR31.03.2020
LI31.03.2020
Former [2021/07]AL03.07.2019
CZ03.07.2019
DK03.07.2019
EE03.07.2019
ES03.07.2019
FI03.07.2019
HR03.07.2019
IT03.07.2019
LT03.07.2019
LV03.07.2019
MC03.07.2019
NL03.07.2019
PL03.07.2019
RO03.07.2019
RS03.07.2019
SE03.07.2019
SI03.07.2019
SK03.07.2019
SM03.07.2019
TR03.07.2019
BG03.10.2019
NO03.10.2019
GR04.10.2019
IS03.11.2019
PT04.11.2019
IE16.03.2020
LU16.03.2020
CH31.03.2020
FR31.03.2020
LI31.03.2020
Former [2021/04]AL03.07.2019
CZ03.07.2019
DK03.07.2019
EE03.07.2019
ES03.07.2019
FI03.07.2019
HR03.07.2019
IT03.07.2019
LT03.07.2019
LV03.07.2019
MC03.07.2019
NL03.07.2019
PL03.07.2019
RO03.07.2019
RS03.07.2019
SE03.07.2019
SI03.07.2019
SK03.07.2019
SM03.07.2019
TR03.07.2019
BG03.10.2019
NO03.10.2019
GR04.10.2019
IS03.11.2019
PT04.11.2019
LU16.03.2020
Former [2020/50]AL03.07.2019
CZ03.07.2019
DK03.07.2019
EE03.07.2019
ES03.07.2019
FI03.07.2019
HR03.07.2019
IT03.07.2019
LT03.07.2019
LV03.07.2019
MC03.07.2019
NL03.07.2019
PL03.07.2019
RO03.07.2019
RS03.07.2019
SE03.07.2019
SI03.07.2019
SK03.07.2019
SM03.07.2019
TR03.07.2019
BG03.10.2019
NO03.10.2019
GR04.10.2019
IS03.11.2019
PT04.11.2019
Former [2020/37]AL03.07.2019
CZ03.07.2019
DK03.07.2019
EE03.07.2019
ES03.07.2019
FI03.07.2019
HR03.07.2019
IT03.07.2019
LT03.07.2019
LV03.07.2019
NL03.07.2019
PL03.07.2019
RO03.07.2019
RS03.07.2019
SE03.07.2019
SI03.07.2019
SK03.07.2019
SM03.07.2019
TR03.07.2019
BG03.10.2019
NO03.10.2019
GR04.10.2019
IS03.11.2019
PT04.11.2019
Former [2020/36]AL03.07.2019
CZ03.07.2019
DK03.07.2019
EE03.07.2019
ES03.07.2019
FI03.07.2019
HR03.07.2019
IT03.07.2019
LT03.07.2019
LV03.07.2019
NL03.07.2019
PL03.07.2019
RO03.07.2019
RS03.07.2019
SE03.07.2019
SK03.07.2019
SM03.07.2019
TR03.07.2019
BG03.10.2019
NO03.10.2019
GR04.10.2019
IS03.11.2019
PT04.11.2019
Former [2020/27]AL03.07.2019
CZ03.07.2019
DK03.07.2019
EE03.07.2019
ES03.07.2019
FI03.07.2019
HR03.07.2019
IT03.07.2019
LT03.07.2019
LV03.07.2019
NL03.07.2019
PL03.07.2019
RO03.07.2019
RS03.07.2019
SE03.07.2019
SK03.07.2019
SM03.07.2019
TR03.07.2019
BG03.10.2019
NO03.10.2019
GR04.10.2019
PT04.11.2019
IS24.02.2020
Former [2020/25]AL03.07.2019
CZ03.07.2019
DK03.07.2019
EE03.07.2019
ES03.07.2019
FI03.07.2019
HR03.07.2019
IT03.07.2019
LT03.07.2019
LV03.07.2019
NL03.07.2019
PL03.07.2019
RO03.07.2019
RS03.07.2019
SE03.07.2019
SK03.07.2019
TR03.07.2019
BG03.10.2019
NO03.10.2019
GR04.10.2019
PT04.11.2019
IS24.02.2020
Former [2020/24]AL03.07.2019
CZ03.07.2019
DK03.07.2019
EE03.07.2019
ES03.07.2019
FI03.07.2019
HR03.07.2019
IT03.07.2019
LT03.07.2019
LV03.07.2019
NL03.07.2019
PL03.07.2019
RO03.07.2019
RS03.07.2019
SE03.07.2019
TR03.07.2019
BG03.10.2019
NO03.10.2019
GR04.10.2019
PT04.11.2019
IS24.02.2020
Former [2020/23]AL03.07.2019
CZ03.07.2019
DK03.07.2019
EE03.07.2019
ES03.07.2019
FI03.07.2019
HR03.07.2019
IT03.07.2019
LT03.07.2019
LV03.07.2019
NL03.07.2019
PL03.07.2019
RO03.07.2019
RS03.07.2019
SE03.07.2019
TR03.07.2019
BG03.10.2019
NO03.10.2019
GR04.10.2019
IS03.11.2019
PT04.11.2019
Former [2020/22]AL03.07.2019
CZ03.07.2019
DK03.07.2019
EE03.07.2019
ES03.07.2019
FI03.07.2019
HR03.07.2019
LT03.07.2019
LV03.07.2019
NL03.07.2019
RS03.07.2019
SE03.07.2019
TR03.07.2019
BG03.10.2019
NO03.10.2019
GR04.10.2019
IS03.11.2019
PT04.11.2019
Former [2020/17]AL03.07.2019
CZ03.07.2019
ES03.07.2019
FI03.07.2019
HR03.07.2019
LT03.07.2019
LV03.07.2019
NL03.07.2019
RS03.07.2019
SE03.07.2019
TR03.07.2019
BG03.10.2019
NO03.10.2019
GR04.10.2019
IS03.11.2019
PT04.11.2019
Former [2020/15]AL03.07.2019
CZ03.07.2019
ES03.07.2019
FI03.07.2019
HR03.07.2019
LT03.07.2019
LV03.07.2019
NL03.07.2019
RS03.07.2019
SE03.07.2019
BG03.10.2019
NO03.10.2019
GR04.10.2019
IS03.11.2019
PT04.11.2019
Former [2020/12]CZ03.07.2019
ES03.07.2019
FI03.07.2019
HR03.07.2019
LT03.07.2019
LV03.07.2019
NL03.07.2019
RS03.07.2019
SE03.07.2019
BG03.10.2019
NO03.10.2019
GR04.10.2019
IS03.11.2019
PT04.11.2019
Former [2020/10]CZ03.07.2019
FI03.07.2019
LT03.07.2019
NL03.07.2019
SE03.07.2019
BG03.10.2019
NO03.10.2019
PT04.11.2019
Former [2020/09]CZ03.07.2019
FI03.07.2019
LT03.07.2019
NL03.07.2019
NO03.10.2019
Former [2020/08]LT03.07.2019
NL03.07.2019
NO03.10.2019
Former [2020/07]NL03.07.2019
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.