blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3288848

EP3288848 - METHOD FOR PRODUCING A PACKAGE ASSEMBLY AND SUCH A PACKAGE ASSEMBLY [Right-click to bookmark this link]
Former [2018/10]METHOD FOR PRODUCING A PACKAGE ASSEMBLY, A PACKAGE ASSEMBLY AND A BLANK TO BE SHAPED INTO A SECONDARY PACKAGE
[2019/36]
StatusNo opposition filed within time limit
Status updated on  23.04.2021
Database last updated on 08.10.2024
FormerThe patent has been granted
Status updated on  15.05.2020
FormerGrant of patent is intended
Status updated on  06.01.2020
FormerRequest for examination was made
Status updated on  02.12.2019
FormerGrant of patent is intended
Status updated on  13.11.2019
FormerRequest for examination was made
Status updated on  02.02.2018
FormerThe international publication has been made
Status updated on  04.11.2016
Most recent event   Tooltip06.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 09.10.2024  [2024/41]
Applicant(s)For all designated states
Tetra Laval Holdings & Finance S.A.
70, Avenue Général-Guisan
1009 Pully / CH
[2018/10]
Inventor(s)01 / HÅKANSSON, Bengt
Bjärrödsbyaväg 209-23 Lerboda
275 95 Sjöbo / SE
02 / DAHL, Göran
Toftaröd 316
243 92 Höör / SE
03 / LUNDIN, Eric
Resedavägen 29
23253 Åkarp / SE
04 / NORDENSKJÖLD, Carl
Karlshamnsgatan 3
214 35 Malmö / SE
05 / BRINTJE, Jessica
Krageholmsgatan 8
SE 216 19 Malmö / SE
 [2018/10]
Representative(s)Tetra Pak - Patent Attorneys SE
c/o AB Tetra Pak
Legal Affairs - D&E
Ruben Rausings gata
221 86 Lund / SE
[2018/10]
Application number, filing date16720750.520.04.2016
[2018/10]
WO2016EP58803
Priority number, dateSE2015005054730.04.2015         Original published format: SE 1550547
[2018/10]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2016173907
Date:03.11.2016
Language:EN
[2016/44]
Type: A1 Application with search report 
No.:EP3288848
Date:07.03.2018
Language:EN
The application published by WIPO in one of the EPO official languages on 03.11.2016 takes the place of the publication of the European patent application.
[2018/10]
Type: B1 Patent specification 
No.:EP3288848
Date:17.06.2020
Language:EN
[2020/25]
Search report(s)International search report - published on:EP03.11.2016
ClassificationIPC:B65D77/04, B65D77/24, B65D77/28
[2018/10]
CPC:
B65D77/28 (EP,US); B65D5/064 (EP); B65D77/042 (EP);
B31B2105/00 (EP,US); B31B2120/50 (EP,US); B65D2577/043 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/10]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:VERFAHREN ZUR HERSTELLUNG EINER VERPACKUNG UND DERARTIGE VERPACKUNGSANORDNUNG[2019/36]
English:METHOD FOR PRODUCING A PACKAGE ASSEMBLY AND SUCH A PACKAGE ASSEMBLY[2019/36]
French:PROCÉDÉ DE FABRICATION D'UN ENSEMBLE D'EMBALLAGE ET ENSEMBLE D'EMBALLAGE[2019/36]
Former [2018/10]VERFAHREN ZUR HERSTELLUNG EINER VERPACKUNG, VERPACKUNGSANORDNUNG UND IN EINE SEKUNDÄRVERPACKUNG ZU FORMENDER ROHLING
Former [2018/10]METHOD FOR PRODUCING A PACKAGE ASSEMBLY, A PACKAGE ASSEMBLY AND A BLANK TO BE SHAPED INTO A SECONDARY PACKAGE
Former [2018/10]PROCÉDÉ DE FABRICATION D'UN ENSEMBLE D'EMBALLAGE, ENSEMBLE D'EMBALLAGE ET ÉBAUCHE DEVANT ÊTRE FAÇONNÉE EN UN EMBALLAGE SECONDAIRE
Entry into regional phase30.11.2017National basic fee paid 
30.11.2017Designation fee(s) paid 
30.11.2017Examination fee paid 
Examination procedure23.10.2017Date on which the examining division has become responsible
30.11.2017Examination requested  [2018/10]
11.06.2018Amendment by applicant (claims and/or description)
14.11.2019Communication of intention to grant the patent
25.11.2019Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
07.01.2020Communication of intention to grant the patent
05.05.2020Receipt of the translation of the claim(s)
06.05.2020Fee for grant paid
06.05.2020Fee for publishing/printing paid
Opposition(s)18.03.2021No opposition filed within time limit [2021/21]
Fees paidRenewal fee
11.04.2018Renewal fee patent year 03
15.04.2019Renewal fee patent year 04
28.04.2020Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU20.04.2016
AL17.06.2020
AT17.06.2020
CY17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
MK17.06.2020
MT17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
[2024/41]
Former [2024/22]HU20.04.2016
AL17.06.2020
AT17.06.2020
CY17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
MK17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
Former [2023/30]HU20.04.2016
AL17.06.2020
AT17.06.2020
CY17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
Former [2023/29]HU20.04.2016
AL17.06.2020
AT17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
Former [2022/23]AL17.06.2020
AT17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
Former [2022/10]AL17.06.2020
AT17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
PT19.10.2020
Former [2021/50]AL17.06.2020
AT17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
Former [2021/24]AL17.06.2020
AT17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
Former [2021/21]AL17.06.2020
AT17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
Former [2021/10]AL17.06.2020
AT17.06.2020
CZ17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
Former [2021/09]AL17.06.2020
AT17.06.2020
CZ17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
NL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
PT19.10.2020
Former [2021/04]AL17.06.2020
FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
NL17.06.2020
RS17.06.2020
SE17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
Former [2021/01]FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
RS17.06.2020
SE17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
Former [2020/51]FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
RS17.06.2020
SE17.06.2020
NO17.09.2020
GR18.09.2020
Former [2020/50]FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
SE17.06.2020
NO17.09.2020
GR18.09.2020
Former [2020/48]FI17.06.2020
LT17.06.2020
SE17.06.2020
NO17.09.2020
Former [2020/47]LT17.06.2020
NO17.09.2020
Cited inInternational search[XA]DE1213721  (MEAD CORP) [X] 11-15 * paragraph [0008] - paragraph [0011]; figures 1-5 * [A] 1-10;
 [XA]WO9608987  (DSA SRL [IT], et al) [X] 1,2,4-6,9,10,15 * page 4, line 9 - page 6, line 15; figures 1-3 * [A] 3,7,8,11-14;
 [XA]JPH10236529  (FUJI SEAL IND CO LTD) [X] 1,4-6,9,10,15 * figures 1-9 * [A] 2,3,7,8,11-14;
 [XA]US2015014199  (BENTLEY DARRELL [US], et al) [X] 1,4-7,9,10,15 * paragraph [0029] - paragraph [0034]; figure 4A * [A] 2,3,8,11-14;
 [XPA]WO2015169698  (TETRA LAVAL HOLDINGS & FINANCE [CH]) [XP] 11-15 * the whole document *[A] 1-10
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.