EP3288848 - METHOD FOR PRODUCING A PACKAGE ASSEMBLY AND SUCH A PACKAGE ASSEMBLY [Right-click to bookmark this link] | |||
Former [2018/10] | METHOD FOR PRODUCING A PACKAGE ASSEMBLY, A PACKAGE ASSEMBLY AND A BLANK TO BE SHAPED INTO A SECONDARY PACKAGE | ||
[2019/36] | Status | No opposition filed within time limit Status updated on 23.04.2021 Database last updated on 08.10.2024 | |
Former | The patent has been granted Status updated on 15.05.2020 | ||
Former | Grant of patent is intended Status updated on 06.01.2020 | ||
Former | Request for examination was made Status updated on 02.12.2019 | ||
Former | Grant of patent is intended Status updated on 13.11.2019 | ||
Former | Request for examination was made Status updated on 02.02.2018 | ||
Former | The international publication has been made Status updated on 04.11.2016 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Tetra Laval Holdings & Finance S.A. 70, Avenue Général-Guisan 1009 Pully / CH | [2018/10] | Inventor(s) | 01 /
HÅKANSSON, Bengt Bjärrödsbyaväg 209-23 Lerboda 275 95 Sjöbo / SE | 02 /
DAHL, Göran Toftaröd 316 243 92 Höör / SE | 03 /
LUNDIN, Eric Resedavägen 29 23253 Åkarp / SE | 04 /
NORDENSKJÖLD, Carl Karlshamnsgatan 3 214 35 Malmö / SE | 05 /
BRINTJE, Jessica Krageholmsgatan 8 SE 216 19 Malmö / SE | [2018/10] | Representative(s) | Tetra Pak - Patent Attorneys SE c/o AB Tetra Pak Legal Affairs - D&E Ruben Rausings gata 221 86 Lund / SE | [2018/10] | Application number, filing date | 16720750.5 | 20.04.2016 | [2018/10] | WO2016EP58803 | Priority number, date | SE20150050547 | 30.04.2015 Original published format: SE 1550547 | [2018/10] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016173907 | Date: | 03.11.2016 | Language: | EN | [2016/44] | Type: | A1 Application with search report | No.: | EP3288848 | Date: | 07.03.2018 | Language: | EN | The application published by WIPO in one of the EPO official languages on 03.11.2016 takes the place of the publication of the European patent application. | [2018/10] | Type: | B1 Patent specification | No.: | EP3288848 | Date: | 17.06.2020 | Language: | EN | [2020/25] | Search report(s) | International search report - published on: | EP | 03.11.2016 | Classification | IPC: | B65D77/04, B65D77/24, B65D77/28 | [2018/10] | CPC: |
B65D77/28 (EP,US);
B65D5/064 (EP);
B65D77/042 (EP);
B31B2105/00 (EP,US);
B31B2120/50 (EP,US);
B65D2577/043 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/10] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | VERFAHREN ZUR HERSTELLUNG EINER VERPACKUNG UND DERARTIGE VERPACKUNGSANORDNUNG | [2019/36] | English: | METHOD FOR PRODUCING A PACKAGE ASSEMBLY AND SUCH A PACKAGE ASSEMBLY | [2019/36] | French: | PROCÉDÉ DE FABRICATION D'UN ENSEMBLE D'EMBALLAGE ET ENSEMBLE D'EMBALLAGE | [2019/36] |
Former [2018/10] | VERFAHREN ZUR HERSTELLUNG EINER VERPACKUNG, VERPACKUNGSANORDNUNG UND IN EINE SEKUNDÄRVERPACKUNG ZU FORMENDER ROHLING | ||
Former [2018/10] | METHOD FOR PRODUCING A PACKAGE ASSEMBLY, A PACKAGE ASSEMBLY AND A BLANK TO BE SHAPED INTO A SECONDARY PACKAGE | ||
Former [2018/10] | PROCÉDÉ DE FABRICATION D'UN ENSEMBLE D'EMBALLAGE, ENSEMBLE D'EMBALLAGE ET ÉBAUCHE DEVANT ÊTRE FAÇONNÉE EN UN EMBALLAGE SECONDAIRE | Entry into regional phase | 30.11.2017 | National basic fee paid | 30.11.2017 | Designation fee(s) paid | 30.11.2017 | Examination fee paid | Examination procedure | 23.10.2017 | Date on which the examining division has become responsible | 30.11.2017 | Examination requested [2018/10] | 11.06.2018 | Amendment by applicant (claims and/or description) | 14.11.2019 | Communication of intention to grant the patent | 25.11.2019 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 07.01.2020 | Communication of intention to grant the patent | 05.05.2020 | Receipt of the translation of the claim(s) | 06.05.2020 | Fee for grant paid | 06.05.2020 | Fee for publishing/printing paid | Opposition(s) | 18.03.2021 | No opposition filed within time limit [2021/21] | Fees paid | Renewal fee | 11.04.2018 | Renewal fee patent year 03 | 15.04.2019 | Renewal fee patent year 04 | 28.04.2020 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 20.04.2016 | AL | 17.06.2020 | AT | 17.06.2020 | CY | 17.06.2020 | CZ | 17.06.2020 | DK | 17.06.2020 | EE | 17.06.2020 | ES | 17.06.2020 | FI | 17.06.2020 | HR | 17.06.2020 | LT | 17.06.2020 | LV | 17.06.2020 | MC | 17.06.2020 | MK | 17.06.2020 | MT | 17.06.2020 | NL | 17.06.2020 | PL | 17.06.2020 | RO | 17.06.2020 | RS | 17.06.2020 | SE | 17.06.2020 | SI | 17.06.2020 | SK | 17.06.2020 | SM | 17.06.2020 | BG | 17.09.2020 | NO | 17.09.2020 | GR | 18.09.2020 | IS | 17.10.2020 | PT | 19.10.2020 | [2024/41] |
Former [2024/22] | HU | 20.04.2016 | |
AL | 17.06.2020 | ||
AT | 17.06.2020 | ||
CY | 17.06.2020 | ||
CZ | 17.06.2020 | ||
DK | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
MC | 17.06.2020 | ||
MK | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SI | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
Former [2023/30] | HU | 20.04.2016 | |
AL | 17.06.2020 | ||
AT | 17.06.2020 | ||
CY | 17.06.2020 | ||
CZ | 17.06.2020 | ||
DK | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
MC | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SI | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
Former [2023/29] | HU | 20.04.2016 | |
AL | 17.06.2020 | ||
AT | 17.06.2020 | ||
CZ | 17.06.2020 | ||
DK | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
MC | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SI | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
Former [2022/23] | AL | 17.06.2020 | |
AT | 17.06.2020 | ||
CZ | 17.06.2020 | ||
DK | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
MC | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SI | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
Former [2022/10] | AL | 17.06.2020 | |
AT | 17.06.2020 | ||
CZ | 17.06.2020 | ||
DK | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
MC | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SI | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
PT | 19.10.2020 | ||
Former [2021/50] | AL | 17.06.2020 | |
AT | 17.06.2020 | ||
CZ | 17.06.2020 | ||
DK | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
MC | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SI | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
Former [2021/24] | AL | 17.06.2020 | |
AT | 17.06.2020 | ||
CZ | 17.06.2020 | ||
DK | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SI | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
Former [2021/21] | AL | 17.06.2020 | |
AT | 17.06.2020 | ||
CZ | 17.06.2020 | ||
DK | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
Former [2021/10] | AL | 17.06.2020 | |
AT | 17.06.2020 | ||
CZ | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
Former [2021/09] | AL | 17.06.2020 | |
AT | 17.06.2020 | ||
CZ | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
NL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
PT | 19.10.2020 | ||
Former [2021/04] | AL | 17.06.2020 | |
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
NL | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
Former [2021/01] | FI | 17.06.2020 | |
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
Former [2020/51] | FI | 17.06.2020 | |
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
Former [2020/50] | FI | 17.06.2020 | |
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
SE | 17.06.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
Former [2020/48] | FI | 17.06.2020 | |
LT | 17.06.2020 | ||
SE | 17.06.2020 | ||
NO | 17.09.2020 | ||
Former [2020/47] | LT | 17.06.2020 | |
NO | 17.09.2020 | Cited in | International search | [XA]DE1213721 (MEAD CORP) [X] 11-15 * paragraph [0008] - paragraph [0011]; figures 1-5 * [A] 1-10; | [XA]WO9608987 (DSA SRL [IT], et al) [X] 1,2,4-6,9,10,15 * page 4, line 9 - page 6, line 15; figures 1-3 * [A] 3,7,8,11-14; | [XA]JPH10236529 (FUJI SEAL IND CO LTD) [X] 1,4-6,9,10,15 * figures 1-9 * [A] 2,3,7,8,11-14; | [XA]US2015014199 (BENTLEY DARRELL [US], et al) [X] 1,4-7,9,10,15 * paragraph [0029] - paragraph [0034]; figure 4A * [A] 2,3,8,11-14; | [XPA]WO2015169698 (TETRA LAVAL HOLDINGS & FINANCE [CH]) [XP] 11-15 * the whole document *[A] 1-10 |