EP3289222 - ELECTRIC COMPRESSOR WITH IMPROVED DYNAMIC SEALING SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 02.06.2023 Database last updated on 31.05.2024 | |
Former | The patent has been granted Status updated on 24.06.2022 | ||
Former | Grant of patent is intended Status updated on 24.02.2022 | ||
Former | Examination is in progress Status updated on 26.02.2021 | ||
Former | Request for examination was made Status updated on 02.02.2018 | ||
Former | The international publication has been made Status updated on 04.11.2016 | Most recent event Tooltip | 24.05.2024 | Lapse of the patent in a contracting state New state(s): IT | published on 26.06.2024 [2024/26] | Applicant(s) | For all designated states Valeo Systèmes de Contrôle Moteur 14 Avenue des Béguines 95800 Cergy Saint Christophe / FR | [2018/10] | Inventor(s) | 01 /
MARTIN, Nicolas C/o VALEO SYSTEMES DE CONTROLE MOTEUR 14 Avenue des Béguines 95800 Cergy Saint Christophe / FR | 02 /
RENARD, Nicolas Unit 5 Carnival Park Carnival Close Basildon Essex SS14 3WN / GB | [2022/30] |
Former [2018/10] | 01 /
MARTIN, Nicolas 17c avenue Crebillon 78600 Maisonslafitte / FR | ||
02 /
RENARD, Nicolas Unit 5 Carnival Park Carnival Close Basildon Essex SS14 3WN / GB | Representative(s) | Valeo Powertrain Systems Service Propriété Intellectuelle Immeuble le Delta 14, avenue des Béguines 95892 Cergy Pontoise / FR | [2022/30] |
Former [2018/10] | Garcia, Christine Propriété Intellectuelle Valeo Systèmes de Contrôle Moteur 14, avenue des Béguines 95800 Cergy St Christophe / FR | Application number, filing date | 16725189.1 | 02.05.2016 | [2018/10] | WO2016FR51029 | Priority number, date | FR20150053934 | 30.04.2015 Original published format: FR 1553934 | FR20150059872 | 16.10.2015 Original published format: FR 1559872 | [2018/10] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | WO2016174375 | Date: | 03.11.2016 | Language: | FR | [2016/44] | Type: | A1 Application with search report | No.: | EP3289222 | Date: | 07.03.2018 | Language: | FR | The application published by WIPO in one of the EPO official languages on 03.11.2016 takes the place of the publication of the European patent application. | [2018/10] | Type: | B1 Patent specification | No.: | EP3289222 | Date: | 27.07.2022 | Language: | FR | [2022/30] | Search report(s) | International search report - published on: | EP | 03.11.2016 | Classification | IPC: | F04D25/06, F04D29/059, F04D29/10, F02B33/40, F02B39/10 | [2022/10] | CPC: |
F04D29/102 (EP);
F02B33/40 (EP);
F04D25/06 (EP);
F04D29/059 (EP);
F02B39/10 (EP);
F05D2260/6022 (EP)
|
Former IPC [2018/10] | F04D25/06, F04D29/059, F04D29/10 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/10] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | ELEKTRISCHER KOMPRESSOR MIT VERBESSERTEM DYNAMISCHEM DICHTUNGSSYSTEM | [2018/10] | English: | ELECTRIC COMPRESSOR WITH IMPROVED DYNAMIC SEALING SYSTEM | [2018/10] | French: | COMPRESSEUR ÉLECTRIQUE AVEC SYSTÈME D'ÉTANCHÉITÉ DYNAMIQUE AMÉLIORÉ | [2018/10] | Entry into regional phase | 29.11.2017 | National basic fee paid | 29.11.2017 | Designation fee(s) paid | 29.11.2017 | Examination fee paid | Examination procedure | 29.11.2017 | Examination requested [2018/10] | 29.11.2017 | Date on which the examining division has become responsible | 12.06.2018 | Amendment by applicant (claims and/or description) | 01.03.2021 | Despatch of a communication from the examining division (Time limit: M06) | 10.09.2021 | Reply to a communication from the examining division | 25.02.2022 | Communication of intention to grant the patent | 20.06.2022 | Fee for grant paid | 20.06.2022 | Fee for publishing/printing paid | 20.06.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 02.05.2023 | No opposition filed within time limit [2023/27] | Fees paid | Renewal fee | 28.04.2018 | Renewal fee patent year 03 | 25.04.2019 | Renewal fee patent year 04 | 29.04.2020 | Renewal fee patent year 05 | 28.04.2021 | Renewal fee patent year 06 | 27.04.2022 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 27.07.2022 | AT | 27.07.2022 | CZ | 27.07.2022 | DK | 27.07.2022 | EE | 27.07.2022 | ES | 27.07.2022 | FI | 27.07.2022 | HR | 27.07.2022 | IT | 27.07.2022 | LT | 27.07.2022 | LV | 27.07.2022 | MC | 27.07.2022 | NL | 27.07.2022 | RO | 27.07.2022 | RS | 27.07.2022 | SE | 27.07.2022 | SI | 27.07.2022 | SK | 27.07.2022 | SM | 27.07.2022 | NO | 27.10.2022 | GR | 28.10.2022 | IS | 27.11.2022 | PT | 28.11.2022 | [2024/26] |
Former [2024/08] | AL | 27.07.2022 | |
AT | 27.07.2022 | ||
CZ | 27.07.2022 | ||
DK | 27.07.2022 | ||
EE | 27.07.2022 | ||
ES | 27.07.2022 | ||
FI | 27.07.2022 | ||
HR | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
MC | 27.07.2022 | ||
NL | 27.07.2022 | ||
RO | 27.07.2022 | ||
RS | 27.07.2022 | ||
SE | 27.07.2022 | ||
SI | 27.07.2022 | ||
SK | 27.07.2022 | ||
SM | 27.07.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
IS | 27.11.2022 | ||
PT | 28.11.2022 | ||
Former [2023/37] | AL | 27.07.2022 | |
AT | 27.07.2022 | ||
CZ | 27.07.2022 | ||
DK | 27.07.2022 | ||
EE | 27.07.2022 | ||
ES | 27.07.2022 | ||
FI | 27.07.2022 | ||
HR | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
NL | 27.07.2022 | ||
RO | 27.07.2022 | ||
RS | 27.07.2022 | ||
SE | 27.07.2022 | ||
SI | 27.07.2022 | ||
SK | 27.07.2022 | ||
SM | 27.07.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
IS | 27.11.2022 | ||
PT | 28.11.2022 | ||
Former [2023/29] | AL | 27.07.2022 | |
AT | 27.07.2022 | ||
CZ | 27.07.2022 | ||
DK | 27.07.2022 | ||
EE | 27.07.2022 | ||
ES | 27.07.2022 | ||
FI | 27.07.2022 | ||
HR | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
NL | 27.07.2022 | ||
RO | 27.07.2022 | ||
RS | 27.07.2022 | ||
SE | 27.07.2022 | ||
SK | 27.07.2022 | ||
SM | 27.07.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
IS | 27.11.2022 | ||
PT | 28.11.2022 | ||
Former [2023/23] | AT | 27.07.2022 | |
CZ | 27.07.2022 | ||
DK | 27.07.2022 | ||
EE | 27.07.2022 | ||
ES | 27.07.2022 | ||
FI | 27.07.2022 | ||
HR | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
NL | 27.07.2022 | ||
RO | 27.07.2022 | ||
RS | 27.07.2022 | ||
SE | 27.07.2022 | ||
SK | 27.07.2022 | ||
SM | 27.07.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
IS | 27.11.2022 | ||
PT | 28.11.2022 | ||
Former [2023/22] | AT | 27.07.2022 | |
CZ | 27.07.2022 | ||
DK | 27.07.2022 | ||
ES | 27.07.2022 | ||
FI | 27.07.2022 | ||
HR | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
NL | 27.07.2022 | ||
RO | 27.07.2022 | ||
RS | 27.07.2022 | ||
SE | 27.07.2022 | ||
SM | 27.07.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
IS | 27.11.2022 | ||
PT | 28.11.2022 | ||
Former [2023/21] | DK | 27.07.2022 | |
ES | 27.07.2022 | ||
FI | 27.07.2022 | ||
HR | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
NL | 27.07.2022 | ||
RS | 27.07.2022 | ||
SE | 27.07.2022 | ||
SM | 27.07.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
IS | 27.11.2022 | ||
PT | 28.11.2022 | ||
Former [2023/20] | ES | 27.07.2022 | |
FI | 27.07.2022 | ||
HR | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
NL | 27.07.2022 | ||
RS | 27.07.2022 | ||
SE | 27.07.2022 | ||
SM | 27.07.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
IS | 27.11.2022 | ||
PT | 28.11.2022 | ||
Former [2023/12] | ES | 27.07.2022 | |
FI | 27.07.2022 | ||
HR | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
NL | 27.07.2022 | ||
RS | 27.07.2022 | ||
SE | 27.07.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
IS | 27.11.2022 | ||
PT | 28.11.2022 | ||
Former [2023/10] | ES | 27.07.2022 | |
FI | 27.07.2022 | ||
HR | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
NL | 27.07.2022 | ||
RS | 27.07.2022 | ||
SE | 27.07.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
PT | 28.11.2022 | ||
Former [2023/09] | ES | 27.07.2022 | |
FI | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
NL | 27.07.2022 | ||
RS | 27.07.2022 | ||
SE | 27.07.2022 | ||
NO | 27.10.2022 | ||
PT | 28.11.2022 | ||
Former [2023/08] | ES | 27.07.2022 | |
FI | 27.07.2022 | ||
LT | 27.07.2022 | ||
NL | 27.07.2022 | ||
RS | 27.07.2022 | ||
SE | 27.07.2022 | ||
NO | 27.10.2022 | ||
Former [2023/06] | NL | 27.07.2022 | Cited in | International search | [I]US2966375 (JOSEPH VEGEZZI JEAN) [I] 1-10 * column 3, lines 9-39; figure 1 *; | [I]US3909154 (ROBB RAYMOND R, et al) [I] 1-10 * column 3, line 48 - column 4, line 5; figures 1-3 *; | [A]EP0357246 (NISSAN MOTOR [JP]) [A] 1* page 4, lines 24-39; figures 2-6 *; | [A]EP1207310 (HITACHI LTD [JP]) [A] 1 * paragraph [0020]; figures 2,3; claim 1 * | by applicant | GB2516060 |