EP3429826 - MANAGING THERMAL CONTRIBUTIONS BETWEEN LAYERS DURING ADDITIVE MANUFACTURING [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 10.03.2023 Database last updated on 26.06.2024 | |
Former | The patent has been granted Status updated on 02.04.2022 | ||
Former | Grant of patent is intended Status updated on 02.01.2022 | ||
Former | Examination is in progress Status updated on 03.04.2021 | ||
Former | Request for examination was made Status updated on 21.12.2018 | ||
Former | The international publication has been made Status updated on 17.11.2017 | ||
Former | unknown Status updated on 07.02.2017 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Hewlett-Packard Development Company, L.P. 10300 Energy Drive Spring TX 77389 / US | [2019/20] |
Former [2019/04] | For all designated states Hewlett-Packard Development Company, L.P. 11445 Compaq Center Drive West Houston, Texas 77070 / US | Inventor(s) | 01 /
FORNOS, Pol Cami de Can Graells 1-21 08174 Sant Cugat del Valles / ES | 02 /
PUIGARDEU ARAMENDIA, Sergio Cami de Can Graells 1-21 08174 SantCugat del Valles / ES | 03 /
VILAJOSANA, Xavier Cami de Can Graells 1-21 08174 Sant Cugat del Valles / ES | [2019/04] | Representative(s) | Haseltine Lake Kempner LLP One Portwall Square Portwall Lane Bristol BS1 6BH / GB | [N/P] |
Former [2022/18] | Haseltine Lake Kempner LLP Redcliff Quay 120 Redcliff Street Bristol BS1 6HU / GB | ||
Former [2019/04] | Haseltine Lake LLP Redcliff Quay 120 Redcliff Street Bristol BS1 6HU / GB | Application number, filing date | 16726287.2 | 12.05.2016 | [2019/04] | WO2016EP60665 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017194113 | Date: | 16.11.2017 | Language: | EN | [2017/46] | Type: | A1 Application with search report | No.: | EP3429826 | Date: | 23.01.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 16.11.2017 takes the place of the publication of the European patent application. | [2019/04] | Type: | B1 Patent specification | No.: | EP3429826 | Date: | 04.05.2022 | Language: | EN | [2022/18] | Search report(s) | International search report - published on: | EP | 16.11.2017 | Classification | IPC: | B29C64/124, B29C64/165, B29C64/386, B33Y10/00, B33Y50/02 | [2022/01] | CPC: |
B33Y10/00 (EP,KR,US);
B29C64/393 (KR,US);
B29C64/124 (EP,KR,US);
B29C64/135 (US);
B29C64/165 (EP,KR,US);
B29C64/20 (US);
B29C64/205 (KR);
B29C64/386 (EP,US);
B29C70/32 (EP);
|
Former IPC [2019/04] | B29C67/00, B33Y10/00, B33Y50/02 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/04] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | STEUERUNG DER THERMISCHEN WECHSELWIRKUNG ZWISCHEN EINZELNEN LAGEN BEI ADDITIVER HERSTELLUNG | [2022/01] | English: | MANAGING THERMAL CONTRIBUTIONS BETWEEN LAYERS DURING ADDITIVE MANUFACTURING | [2019/04] | French: | CONTRÔLE D'INTERACTION THERMIQUE ENTRE DES COUCHES EN FABRICATION ADDITIVE | [2022/01] |
Former [2019/04] | VERWALTUNG VON THERMISCHEN BEITRÄGEN ZWISCHEN SCHICHTEN WÄHREND DER GENERATIVEN FERTIGUNG | ||
Former [2019/04] | GESTION D'APPORTS THERMIQUES ENTRE DES COUCHES PENDANT LA FABRICATION ADDITIVE | Entry into regional phase | 18.10.2018 | National basic fee paid | 18.10.2018 | Designation fee(s) paid | 18.10.2018 | Examination fee paid | Examination procedure | 18.10.2018 | Examination requested [2019/04] | 18.10.2018 | Date on which the examining division has become responsible | 10.05.2019 | Amendment by applicant (claims and/or description) | 08.04.2021 | Despatch of a communication from the examining division (Time limit: M04) | 05.08.2021 | Reply to a communication from the examining division | 03.01.2022 | Communication of intention to grant the patent | 24.03.2022 | Fee for grant paid | 24.03.2022 | Fee for publishing/printing paid | 24.03.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 07.02.2023 | No opposition filed within time limit [2023/15] | Fees paid | Renewal fee | 18.10.2018 | Renewal fee patent year 03 | 21.05.2019 | Renewal fee patent year 04 | 20.05.2020 | Renewal fee patent year 05 | 19.05.2021 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 12.05.2016 | AL | 04.05.2022 | AT | 04.05.2022 | CY | 04.05.2022 | CZ | 04.05.2022 | DK | 04.05.2022 | EE | 04.05.2022 | ES | 04.05.2022 | FI | 04.05.2022 | HR | 04.05.2022 | IT | 04.05.2022 | LT | 04.05.2022 | LV | 04.05.2022 | MC | 04.05.2022 | MK | 04.05.2022 | NL | 04.05.2022 | PL | 04.05.2022 | RO | 04.05.2022 | RS | 04.05.2022 | SE | 04.05.2022 | SI | 04.05.2022 | SK | 04.05.2022 | SM | 04.05.2022 | TR | 04.05.2022 | IE | 12.05.2022 | LU | 12.05.2022 | BE | 31.05.2022 | CH | 31.05.2022 | LI | 31.05.2022 | BG | 04.08.2022 | NO | 04.08.2022 | GR | 05.08.2022 | IS | 04.09.2022 | PT | 05.09.2022 | [2024/29] |
Former [2024/22] | HU | 12.05.2016 | |
AL | 04.05.2022 | ||
AT | 04.05.2022 | ||
CY | 04.05.2022 | ||
CZ | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
IT | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
MK | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
SI | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
IE | 12.05.2022 | ||
LU | 12.05.2022 | ||
BE | 31.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2024/20] | HU | 12.05.2016 | |
AL | 04.05.2022 | ||
AT | 04.05.2022 | ||
CY | 04.05.2022 | ||
CZ | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
IT | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
SI | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
IE | 12.05.2022 | ||
LU | 12.05.2022 | ||
BE | 31.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2024/18] | HU | 12.05.2016 | |
AL | 04.05.2022 | ||
AT | 04.05.2022 | ||
CZ | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
IT | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
SI | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
IE | 12.05.2022 | ||
LU | 12.05.2022 | ||
BE | 31.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2024/11] | AL | 04.05.2022 | |
AT | 04.05.2022 | ||
CZ | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
IT | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
SI | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
IE | 12.05.2022 | ||
LU | 12.05.2022 | ||
BE | 31.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2023/25] | AL | 04.05.2022 | |
AT | 04.05.2022 | ||
CZ | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
SI | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
IE | 12.05.2022 | ||
LU | 12.05.2022 | ||
BE | 31.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2023/20] | AL | 04.05.2022 | |
AT | 04.05.2022 | ||
CZ | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
IE | 12.05.2022 | ||
LU | 12.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2023/17] | AL | 04.05.2022 | |
AT | 04.05.2022 | ||
CZ | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
LU | 12.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2023/11] | AT | 04.05.2022 | |
CZ | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
LU | 12.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2023/09] | AT | 04.05.2022 | |
CZ | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
LU | 12.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2023/08] | AT | 04.05.2022 | |
DK | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
LU | 12.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2023/07] | AT | 04.05.2022 | |
DK | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2022/51] | AT | 04.05.2022 | |
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2022/50] | AT | 04.05.2022 | |
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
PT | 05.09.2022 | ||
Former [2022/49] | AT | 04.05.2022 | |
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
NL | 04.05.2022 | ||
SE | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
PT | 05.09.2022 | ||
Former [2022/48] | AT | 04.05.2022 | |
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
LT | 04.05.2022 | ||
NL | 04.05.2022 | ||
SE | 04.05.2022 | ||
NO | 04.08.2022 | ||
PT | 05.09.2022 | ||
Former [2022/47] | AT | 04.05.2022 | |
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
LT | 04.05.2022 | ||
SE | 04.05.2022 | ||
NO | 04.08.2022 | ||
PT | 05.09.2022 | Cited in | International search | [X]WO2015108546 (HEWLETT PACKARD DEVELOPMENT CO [US]) [X] 1-15 * figure 2a * * paragraphs 00012, 00014, 00023, 00028-00029, 00043-00045, 00070-00078, 00086 *; | [A]WO2015108547 (HEWLETT PACKARD DEVELOPMENT CO [US]) [A] 1-15 * figures 2a, 3 * * paragraphs 0002 (page 6), 00012 (page 1), 00018 (page 3), 00024 (page 5), 00025 (page 5), 00024 (page 10), 00054, 00065 ** Information: Incorrect / partially repeated use of paragraph references in document; if applicable, the page number is given with the paragraph * |