blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3390000

EP3390000 - WASTE ROUTING OF NON-FUSED BUILD MATERIAL [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  02.08.2024
Database last updated on 05.10.2024
FormerThe patent has been granted
Status updated on  25.08.2023
FormerGrant of patent is intended
Status updated on  10.05.2023
FormerExamination is in progress
Status updated on  13.11.2020
FormerRequest for examination was made
Status updated on  21.09.2018
FormerThe international publication has been made
Status updated on  17.11.2017
Most recent event   Tooltip02.08.2024No opposition filed within time limitpublished on 04.09.2024  [2024/36]
Applicant(s)For all designated states
Hewlett-Packard Development Company, L.P.
10300 Energy Drive
Spring TX 77389 / US
[2019/20]
Former [2018/43]For all designated states
Hewlett-Packard Development Company, L.P.
11445 Compaq Center Drive West
Houston, Texas 77070 / US
Inventor(s)01 / CHANCLON, Ismael
Cami de Can Graells 1-21
08174 Sant Cugat del Valles / ES
02 / ALONSO, Xavier
Cami de Can Graells 1-21
08174 Sant Cugat del Valles / ES
03 / FONT, Davinia
Cami de Can Graells 1-21
08174 Sant Cugat del Valles / ES
 [2018/43]
Representative(s)Haseltine Lake Kempner LLP
One Portwall Square
Portwall Lane
Bristol BS1 6BH / GB
[2023/39]
Former [2018/43]Haseltine Lake LLP
Redcliff Quay 120 Redcliff Street
Bristol BS1 6HU / GB
Application number, filing date16726289.812.05.2016
[2018/43]
WO2016EP60690
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2017194119
Date:16.11.2017
Language:EN
[2017/46]
Type: A1 Application with search report 
No.:EP3390000
Date:24.10.2018
Language:EN
The application published by WIPO in one of the EPO official languages on 16.11.2017 takes the place of the publication of the European patent application.
[2018/43]
Type: B1 Patent specification 
No.:EP3390000
Date:27.09.2023
Language:EN
[2023/39]
Search report(s)International search report - published on:EP16.11.2017
ClassificationIPC:B29C67/00
[2018/43]
CPC:
B29C64/35 (EP,US); B29C64/393 (EP); B33Y40/00 (EP,US);
B33Y50/02 (EP); B29C64/153 (EP,US); B29C64/165 (EP,US);
B33Y10/00 (US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/43]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:ABFALLUMLEITUNG VON NICHT-FUSIONIERTEMBAUMATERIAL[2018/43]
English:WASTE ROUTING OF NON-FUSED BUILD MATERIAL[2018/43]
French:ACHEMINEMENT DE DÉCHETS D'UN MATÉRIAU DE CONSTRUCTION NON FONDU[2018/43]
Entry into regional phase19.07.2018National basic fee paid 
19.07.2018Designation fee(s) paid 
19.07.2018Examination fee paid 
Examination procedure19.07.2018Examination requested  [2018/43]
19.07.2018Date on which the examining division has become responsible
18.12.2018Amendment by applicant (claims and/or description)
13.11.2020Despatch of a communication from the examining division (Time limit: M04)
15.03.2021Reply to a communication from the examining division
17.03.2022Despatch of a communication from the examining division (Time limit: M04)
11.08.2022Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time
17.10.2022Reply to a communication from the examining division
11.05.2023Communication of intention to grant the patent
17.08.2023Fee for grant paid
17.08.2023Fee for publishing/printing paid
17.08.2023Receipt of the translation of the claim(s)
Opposition(s)28.06.2024No opposition filed within time limit [2024/36]
Request for further processing for:The application is deemed to be withdrawn due to failure to reply to the examination report
17.10.2022Request for further processing filed
17.10.2022Full payment received (date of receipt of payment)
Request granted
21.10.2022Decision despatched
Fees paidRenewal fee
19.07.2018Renewal fee patent year 03
21.05.2019Renewal fee patent year 04
20.05.2020Renewal fee patent year 05
19.05.2021Renewal fee patent year 06
18.05.2022Renewal fee patent year 07
23.05.2023Renewal fee patent year 08
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAT27.09.2023
CZ27.09.2023
DK27.09.2023
EE27.09.2023
ES27.09.2023
FI27.09.2023
HR27.09.2023
IT27.09.2023
LT27.09.2023
LV27.09.2023
NL27.09.2023
PL27.09.2023
RO27.09.2023
RS27.09.2023
SE27.09.2023
SK27.09.2023
SM27.09.2023
NO27.12.2023
GR28.12.2023
IS27.01.2024
PT29.01.2024
[2024/33]
Former [2024/26]AT27.09.2023
CZ27.09.2023
EE27.09.2023
ES27.09.2023
FI27.09.2023
HR27.09.2023
IT27.09.2023
LT27.09.2023
LV27.09.2023
NL27.09.2023
PL27.09.2023
RO27.09.2023
RS27.09.2023
SE27.09.2023
SK27.09.2023
SM27.09.2023
NO27.12.2023
GR28.12.2023
IS27.01.2024
PT29.01.2024
Former [2024/25]AT27.09.2023
CZ27.09.2023
EE27.09.2023
ES27.09.2023
FI27.09.2023
HR27.09.2023
LT27.09.2023
LV27.09.2023
NL27.09.2023
PL27.09.2023
RO27.09.2023
RS27.09.2023
SE27.09.2023
SK27.09.2023
SM27.09.2023
NO27.12.2023
GR28.12.2023
IS27.01.2024
PT29.01.2024
Former [2024/23]AT27.09.2023
CZ27.09.2023
EE27.09.2023
ES27.09.2023
FI27.09.2023
HR27.09.2023
LT27.09.2023
LV27.09.2023
NL27.09.2023
RO27.09.2023
RS27.09.2023
SE27.09.2023
SK27.09.2023
SM27.09.2023
NO27.12.2023
GR28.12.2023
IS27.01.2024
PT29.01.2024
Former [2024/20]FI27.09.2023
HR27.09.2023
LT27.09.2023
LV27.09.2023
NL27.09.2023
RS27.09.2023
SE27.09.2023
SM27.09.2023
NO27.12.2023
GR28.12.2023
IS27.01.2024
Former [2024/14]FI27.09.2023
HR27.09.2023
LT27.09.2023
LV27.09.2023
NL27.09.2023
RS27.09.2023
SE27.09.2023
NO27.12.2023
GR28.12.2023
Former [2024/10]FI27.09.2023
HR27.09.2023
LT27.09.2023
LV27.09.2023
RS27.09.2023
SE27.09.2023
NO27.12.2023
GR28.12.2023
Former [2024/09]FI27.09.2023
LT27.09.2023
SE27.09.2023
NO27.12.2023
GR28.12.2023
Former [2024/08]LT27.09.2023
NO27.12.2023
GR28.12.2023
Cited inInternational search[XI]EP1700686  (3D SYSTEMS INC [US]) [X] 1-8,14 * paragraph [0009] - paragraph [0013] * * paragraph [0033] * * paragraph [0040] - paragraph [0048] * * paragraph [0058] *[I] 9-13,15
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.