EP3308565 - PAIRING OF NEARBY DEVICES USING A SYNCHRONIZED CUE SIGNAL [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 23.04.2021 Database last updated on 15.06.2024 | |
Former | The patent has been granted Status updated on 15.05.2020 | ||
Former | Grant of patent is intended Status updated on 09.01.2020 | ||
Former | Request for examination was made Status updated on 06.12.2019 | ||
Former | Grant of patent is intended Status updated on 15.08.2019 | ||
Former | Request for examination was made Status updated on 16.03.2018 | ||
Former | The international publication has been made Status updated on 23.12.2016 | ||
Former | unknown Status updated on 02.12.2016 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Microsoft Technology Licensing LLC One Microsoft Way Redmond, Washington 98052-6399 / US | [2020/25] |
Former [2018/16] | For all designated states Microsoft Technology Licensing, LLC One Microsoft Way Redmond, Washington 98052-6399 / US | Inventor(s) | 01 /
SONNINO, Roberto Microsoft Technology Licensing LLC Attn: Patent Group Docketing (Bldg. 8/1000) One Microsoft Way Redmond, WA 98052-6399 / US | 02 /
MANDEL-IAIA, Jordan Microsoft Technology Licensing LLC Attn: Patent Group Docketing (Bldg. 8/1000) One Microsoft Way Redmond, WA 98052-6399 / US | [2018/16] | Representative(s) | Goddar, Heinz J. Boehmert & Boehmert Anwaltspartnerschaft mbB Pettenkoferstrasse 22 80336 München / DE | [2018/16] | Application number, filing date | 16730631.5 | 06.06.2016 | [2018/16] | WO2016US35954 | Priority number, date | US201514740060 | 15.06.2015 Original published format: US201514740060 | [2018/16] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016204993 | Date: | 22.12.2016 | Language: | EN | [2016/51] | Type: | A1 Application with search report | No.: | EP3308565 | Date: | 18.04.2018 | Language: | EN | The application published by WIPO in one of the EPO official languages on 22.12.2016 takes the place of the publication of the European patent application. | [2018/16] | Type: | B1 Patent specification | No.: | EP3308565 | Date: | 17.06.2020 | Language: | EN | [2020/25] | Search report(s) | International search report - published on: | EP | 22.12.2016 | Classification | IPC: | H04W12/06, H04W4/00, H04W12/04, G06F3/16, G09G3/00, G09G5/12, H04W4/80, H04W76/14 | [2019/36] | CPC: |
H04W4/80 (EP,US);
H04W12/06 (EP,CN,US);
G06F3/167 (US);
G09G3/002 (US);
G09G5/12 (US);
H04W12/04 (EP,CN,US);
|
Former IPC [2018/16] | H04W12/06, H04W4/00, H04W12/04 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/16] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | PAARUNG BENACHBARTER VORRICHTUNGEN MIT SYNCHRONISIERTEM HINWEISSIGNAL | [2018/16] | English: | PAIRING OF NEARBY DEVICES USING A SYNCHRONIZED CUE SIGNAL | [2018/16] | French: | APPARIEMENT DE DISPOSITIFS DE PROXIMITÉ AU MOYEN D'UN SIGNAL DE REPÉRAGE SYNCHRONISÉ | [2018/16] | Entry into regional phase | 07.12.2017 | National basic fee paid | 07.12.2017 | Designation fee(s) paid | 07.12.2017 | Examination fee paid | Examination procedure | 07.11.2016 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 07.12.2017 | Examination requested [2018/16] | 07.12.2017 | Date on which the examining division has become responsible | 27.07.2018 | Amendment by applicant (claims and/or description) | 16.08.2019 | Communication of intention to grant the patent | 04.12.2019 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 10.01.2020 | Communication of intention to grant the patent | 11.05.2020 | Fee for grant paid | 11.05.2020 | Fee for publishing/printing paid | 11.05.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 18.03.2021 | No opposition filed within time limit [2021/21] | Fees paid | Renewal fee | 12.06.2018 | Renewal fee patent year 03 | 13.06.2019 | Renewal fee patent year 04 | 31.03.2020 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 06.06.2016 | AL | 17.06.2020 | AT | 17.06.2020 | CY | 17.06.2020 | CZ | 17.06.2020 | DK | 17.06.2020 | EE | 17.06.2020 | ES | 17.06.2020 | FI | 17.06.2020 | HR | 17.06.2020 | IT | 17.06.2020 | LT | 17.06.2020 | LV | 17.06.2020 | MC | 17.06.2020 | MK | 17.06.2020 | NL | 17.06.2020 | PL | 17.06.2020 | RO | 17.06.2020 | RS | 17.06.2020 | SE | 17.06.2020 | SI | 17.06.2020 | SK | 17.06.2020 | SM | 17.06.2020 | TR | 17.06.2020 | BG | 17.09.2020 | NO | 17.09.2020 | GR | 18.09.2020 | IS | 17.10.2020 | PT | 19.10.2020 | [2024/29] |
Former [2024/22] | HU | 06.06.2016 | |
AL | 17.06.2020 | ||
AT | 17.06.2020 | ||
CY | 17.06.2020 | ||
CZ | 17.06.2020 | ||
DK | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
IT | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
MC | 17.06.2020 | ||
MK | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SI | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
Former [2023/33] | HU | 06.06.2016 | |
AL | 17.06.2020 | ||
AT | 17.06.2020 | ||
CY | 17.06.2020 | ||
CZ | 17.06.2020 | ||
DK | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
IT | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
MC | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SI | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
Former [2023/30] | AL | 17.06.2020 | |
AT | 17.06.2020 | ||
CY | 17.06.2020 | ||
CZ | 17.06.2020 | ||
DK | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
IT | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
MC | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SI | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
Former [2022/08] | AL | 17.06.2020 | |
AT | 17.06.2020 | ||
CZ | 17.06.2020 | ||
DK | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
IT | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
MC | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SI | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
Former [2021/24] | AL | 17.06.2020 | |
AT | 17.06.2020 | ||
CZ | 17.06.2020 | ||
DK | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
IT | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SI | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
Former [2021/21] | AL | 17.06.2020 | |
AT | 17.06.2020 | ||
CZ | 17.06.2020 | ||
DK | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
IT | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
Former [2021/10] | AL | 17.06.2020 | |
AT | 17.06.2020 | ||
CZ | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
IT | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
NL | 17.06.2020 | ||
PL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SK | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
IS | 17.10.2020 | ||
PT | 19.10.2020 | ||
Former [2021/09] | AL | 17.06.2020 | |
AT | 17.06.2020 | ||
CZ | 17.06.2020 | ||
EE | 17.06.2020 | ||
ES | 17.06.2020 | ||
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
IT | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
NL | 17.06.2020 | ||
RO | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
SM | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
PT | 19.10.2020 | ||
Former [2021/04] | AL | 17.06.2020 | |
FI | 17.06.2020 | ||
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
NL | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
Former [2021/01] | FI | 17.06.2020 | |
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
BG | 17.09.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
Former [2020/51] | FI | 17.06.2020 | |
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
RS | 17.06.2020 | ||
SE | 17.06.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
Former [2020/50] | FI | 17.06.2020 | |
HR | 17.06.2020 | ||
LT | 17.06.2020 | ||
LV | 17.06.2020 | ||
SE | 17.06.2020 | ||
NO | 17.09.2020 | ||
GR | 18.09.2020 | ||
Former [2020/48] | FI | 17.06.2020 | |
LT | 17.06.2020 | ||
SE | 17.06.2020 | ||
NO | 17.09.2020 | ||
Former [2020/47] | LT | 17.06.2020 | |
NO | 17.09.2020 | Cited in | International search | [XAI]WO2009014438 (TNO [NL], et al) [X] 1,5-7,9 * page 3, line 21 - page 5, line 2 * * page 5, line 26 - page 5, line 32 * * page 7, line 18 - page 8, line 6 * * page 9, line 32 - page 15, line 10; claim 18 * [A] 14,15 [I] 2-4,8,10-12; | [I]EP2683147 (SAMSUNG ELECTRONICS CO LTD [KR]) [I] 1-15 * paragraph [0038] - paragraph [0046] * * paragraph [0127] - paragraph [0132] ** figures 1,4,5,8,9 * |