EP3323038 - BID/ASK PROTOCOL IN SCALE-OUT NVME STORAGE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 05.01.2024 Database last updated on 14.06.2024 | |
Former | The patent has been granted Status updated on 27.01.2023 | ||
Former | Grant of patent is intended Status updated on 03.10.2022 | ||
Former | Examination is in progress Status updated on 20.11.2020 | ||
Former | Request for examination was made Status updated on 20.04.2018 | ||
Former | The international publication has been made Status updated on 20.01.2017 | Most recent event Tooltip | 24.05.2024 | Lapse of the patent in a contracting state New state(s): IT | published on 26.06.2024 [2024/26] | Applicant(s) | For all designated states Cisco Technology, Inc. 170 West Tasman Drive San Jose, CA 95134-1706 / US | [2023/08] |
Former [2018/21] | For all designated states Cisco Technology, Inc. SJC/10/2/1 170 West Tasman Drive San Jose, CA 95134-1706 / US | Inventor(s) | 01 /
METZ, J. Michel 3110 Fowler Road San Jose, California 95135 / US | 02 /
PELISSIER, Joseph E. 18191 SW Sunrise Peaks Lane Hillsboro, Oregon 97123 / US | [2018/21] | Representative(s) | Mathys & Squire The Shard 32 London Bridge Street London SE1 9SG / GB | [2023/09] |
Former [2018/21] | Kazi, Ilya, et al Mathys & Squire LLP The Shard 32 London Bridge Street London SE1 9SG / GB | Application number, filing date | 16738255.5 | 20.06.2016 | [2018/21] | WO2016US38403 | Priority number, date | US201562192966P | 15.07.2015 Original published format: US 201562192966 P | US201615097126 | 12.04.2016 Original published format: US201615097126 | [2018/21] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017011148 | Date: | 19.01.2017 | Language: | EN | [2017/03] | Type: | A1 Application with search report | No.: | EP3323038 | Date: | 23.05.2018 | Language: | EN | The application published by WIPO in one of the EPO official languages on 19.01.2017 takes the place of the publication of the European patent application. | [2018/21] | Type: | B1 Patent specification | No.: | EP3323038 | Date: | 01.03.2023 | Language: | EN | [2023/09] | Search report(s) | International search report - published on: | EP | 19.01.2017 | Classification | IPC: | G06F3/06 | [2018/21] | CPC: |
G06F3/0607 (EP,US);
H04L67/1097 (US);
G06F3/0631 (EP,US);
G06F3/067 (EP,US);
H04L67/1012 (US);
H04L67/1095 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/21] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | ANGEBOTS-/NACHFRAGEPROTOKOLL IN EINEM SCALE-OUT-NVME-SPEICHER | [2018/21] | English: | BID/ASK PROTOCOL IN SCALE-OUT NVME STORAGE | [2018/21] | French: | PROTOCOLE OFFRE/DEMANDE DANS UN STOCKAGE À MÉMOIRE RÉMANENTE EXPRESS (NVME) MISE À L'ÉCHELLE | [2018/21] | Entry into regional phase | 29.09.2017 | National basic fee paid | 29.09.2017 | Designation fee(s) paid | 29.09.2017 | Examination fee paid | Examination procedure | 29.09.2017 | Examination requested [2018/21] | 29.09.2017 | Date on which the examining division has become responsible | 30.08.2018 | Amendment by applicant (claims and/or description) | 19.11.2020 | Despatch of a communication from the examining division (Time limit: M04) | 29.03.2021 | Reply to a communication from the examining division | 12.09.2022 | Cancellation of oral proceeding that was planned for 13.09.2022 | 13.09.2022 | Date of oral proceedings (cancelled) | 04.10.2022 | Communication of intention to grant the patent | 17.01.2023 | Fee for grant paid | 17.01.2023 | Fee for publishing/printing paid | 17.01.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 04.12.2023 | No opposition filed within time limit [2024/06] | Fees paid | Renewal fee | 27.06.2018 | Renewal fee patent year 03 | 27.06.2019 | Renewal fee patent year 04 | 29.06.2020 | Renewal fee patent year 05 | 29.06.2021 | Renewal fee patent year 06 | 31.03.2022 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 01.03.2023 | CZ | 01.03.2023 | DK | 01.03.2023 | EE | 01.03.2023 | ES | 01.03.2023 | FI | 01.03.2023 | HR | 01.03.2023 | IT | 01.03.2023 | LT | 01.03.2023 | LV | 01.03.2023 | MC | 01.03.2023 | NL | 01.03.2023 | PL | 01.03.2023 | RO | 01.03.2023 | RS | 01.03.2023 | SE | 01.03.2023 | SI | 01.03.2023 | SK | 01.03.2023 | SM | 01.03.2023 | NO | 01.06.2023 | GR | 02.06.2023 | IE | 20.06.2023 | LU | 20.06.2023 | BE | 30.06.2023 | CH | 30.06.2023 | IS | 01.07.2023 | PT | 03.07.2023 | [2024/26] |
Former [2024/24] | AT | 01.03.2023 | |
CZ | 01.03.2023 | ||
DK | 01.03.2023 | ||
EE | 01.03.2023 | ||
ES | 01.03.2023 | ||
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
MC | 01.03.2023 | ||
NL | 01.03.2023 | ||
PL | 01.03.2023 | ||
RO | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
SI | 01.03.2023 | ||
SK | 01.03.2023 | ||
SM | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
IE | 20.06.2023 | ||
LU | 20.06.2023 | ||
BE | 30.06.2023 | ||
CH | 30.06.2023 | ||
IS | 01.07.2023 | ||
PT | 03.07.2023 | ||
Former [2024/21] | AT | 01.03.2023 | |
CZ | 01.03.2023 | ||
DK | 01.03.2023 | ||
EE | 01.03.2023 | ||
ES | 01.03.2023 | ||
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
MC | 01.03.2023 | ||
NL | 01.03.2023 | ||
PL | 01.03.2023 | ||
RO | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
SI | 01.03.2023 | ||
SK | 01.03.2023 | ||
SM | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
IE | 20.06.2023 | ||
LU | 20.06.2023 | ||
IS | 01.07.2023 | ||
PT | 03.07.2023 | ||
Former [2024/15] | AT | 01.03.2023 | |
CZ | 01.03.2023 | ||
DK | 01.03.2023 | ||
EE | 01.03.2023 | ||
ES | 01.03.2023 | ||
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
MC | 01.03.2023 | ||
NL | 01.03.2023 | ||
PL | 01.03.2023 | ||
RO | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
SI | 01.03.2023 | ||
SK | 01.03.2023 | ||
SM | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
LU | 20.06.2023 | ||
IS | 01.07.2023 | ||
PT | 03.07.2023 | ||
Former [2024/10] | AT | 01.03.2023 | |
CZ | 01.03.2023 | ||
DK | 01.03.2023 | ||
EE | 01.03.2023 | ||
ES | 01.03.2023 | ||
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
MC | 01.03.2023 | ||
NL | 01.03.2023 | ||
PL | 01.03.2023 | ||
RO | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
SI | 01.03.2023 | ||
SK | 01.03.2023 | ||
SM | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
IS | 01.07.2023 | ||
PT | 03.07.2023 | ||
Former [2024/09] | AT | 01.03.2023 | |
CZ | 01.03.2023 | ||
DK | 01.03.2023 | ||
EE | 01.03.2023 | ||
ES | 01.03.2023 | ||
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
MC | 01.03.2023 | ||
NL | 01.03.2023 | ||
PL | 01.03.2023 | ||
RO | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
SK | 01.03.2023 | ||
SM | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
IS | 01.07.2023 | ||
PT | 03.07.2023 | ||
Former [2023/50] | AT | 01.03.2023 | |
CZ | 01.03.2023 | ||
EE | 01.03.2023 | ||
ES | 01.03.2023 | ||
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
NL | 01.03.2023 | ||
PL | 01.03.2023 | ||
RO | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
SK | 01.03.2023 | ||
SM | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
IS | 01.07.2023 | ||
PT | 03.07.2023 | ||
Former [2023/49] | AT | 01.03.2023 | |
CZ | 01.03.2023 | ||
EE | 01.03.2023 | ||
ES | 01.03.2023 | ||
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
NL | 01.03.2023 | ||
PL | 01.03.2023 | ||
RO | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
SM | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
PT | 03.07.2023 | ||
Former [2023/48] | AT | 01.03.2023 | |
EE | 01.03.2023 | ||
ES | 01.03.2023 | ||
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
NL | 01.03.2023 | ||
PL | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
SM | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
PT | 03.07.2023 | ||
Former [2023/46] | ES | 01.03.2023 | |
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
NL | 01.03.2023 | ||
PL | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
SM | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
PT | 03.07.2023 | ||
Former [2023/38] | ES | 01.03.2023 | |
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
NL | 01.03.2023 | ||
PL | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
Former [2023/37] | ES | 01.03.2023 | |
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
Former [2023/36] | ES | 01.03.2023 | |
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
NO | 01.06.2023 | ||
Former [2023/35] | ES | 01.03.2023 | |
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
RS | 01.03.2023 | ||
NO | 01.06.2023 | ||
Former [2023/34] | ES | 01.03.2023 | |
LT | 01.03.2023 | ||
RS | 01.03.2023 | ||
Former [2023/33] | ES | 01.03.2023 | |
LT | 01.03.2023 | Cited in | International search | [XI]US2013204960 (ASHOK ROHITH K [US], et al) [X] 1,10 * figures 4-5 * * paragraph [0001] - paragraph [0062] *[I] 2-9,11-15 |