blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3326250

EP3326250 - GAS INSULATED SWITCHGEAR WITH THE USE OF ECO-EFFICIENT INSULATING GASES [Right-click to bookmark this link]
Former [2018/22]GAS INSULATED SWITCHGEAR WITH THE USE OF INSULATING GASES OR FLUIDS, AND METHOD OF PRODUCING THE SAME
[2024/16]
StatusExamination is in progress
Status updated on  20.05.2020
Database last updated on 22.08.2024
FormerRequest for examination was made
Status updated on  27.04.2018
FormerThe international publication has been made
Status updated on  27.01.2017
Most recent event   Tooltip22.08.2024New entry: Application deemed to be withdrawn: despatch of communication + time limit 
Applicant(s)For all designated states
ABB Schweiz AG
Brown Boveri Strasse 6
5400 Baden / CH
[2018/22]
Inventor(s)01 / HYRENBACH, Maik
Gerhardstrasse 76
40878 Ratingen / DE
 [2018/22]
Representative(s)Maiwald GmbH
Grünstraße 25
40212 Düsseldorf / DE
[N/P]
Former [2018/22]Schmidt, Karl Michael
ABB AG
GF-IP
Oberhausener Strasse 33
40472 Ratingen / DE
Application number, filing date16742226.015.07.2016
[2018/22]
WO2016EP66969
Priority number, dateEP2015017733317.07.2015         Original published format: EP 15177333
[2018/22]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2017013036
Date:26.01.2017
Language:EN
[2017/04]
Type: A1 Application with search report 
No.:EP3326250
Date:30.05.2018
Language:EN
The application published by WIPO in one of the EPO official languages on 26.01.2017 takes the place of the publication of the European patent application.
[2018/22]
Search report(s)International search report - published on:EP26.01.2017
(Supplementary) European search report - dispatched on:EP27.05.2020
ClassificationIPC:H02B13/055, H02B3/00, H01B3/16
[2018/22]
CPC:
H02B13/055 (EP,US); H01H33/56 (US); H01H11/00 (US);
H02B3/00 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/22]
TitleGerman:GASISOLIERTE SCHALTANLAGE MIT VERWENDUNG VON EKO EFFIZIENTER ISOLIERENDEN GASEN[2024/16]
English:GAS INSULATED SWITCHGEAR WITH THE USE OF ECO-EFFICIENT INSULATING GASES[2024/16]
French:APPAREILLAGE DE COMMUTATION ISOLÉ AU GAZ AVEC L'UTILISATION DE GAZ ÉCO EFFICACE[2024/16]
Former [2018/22]GASISOLIERTE SCHALTANLAGE MIT VERWENDUNG VON ISOLIERENDEN GASEN ODER FLUIDEN UND VERFAHREN ZUR HERSTELLUNG DAVON
Former [2018/22]GAS INSULATED SWITCHGEAR WITH THE USE OF INSULATING GASES OR FLUIDS, AND METHOD OF PRODUCING THE SAME
Former [2018/22]APPAREILLAGE DE COMMUTATION À ISOLATION GAZEUSE UTILISANT DES GAZ OU DES FLUIDES ISOLANTS, ET SON PROCÉDÉ DE PRODUCTION
Entry into regional phase22.12.2017National basic fee paid 
22.12.2017Designation fee(s) paid 
22.12.2017Examination fee paid 
Examination procedure22.12.2017Examination requested  [2018/22]
22.12.2017Date on which the examining division has become responsible
21.12.2018Amendment by applicant (claims and/or description)
27.05.2020Despatch of a communication from the examining division to which search results under Rule 164(2) EPC are annexed (Time limit: M04) [2020/27]
27.05.2020Despatch of a communication from the examining division (Time limit: M04)
13.09.2020Reply to a communication from the examining division
28.09.2021Despatch of a communication from the examining division (Time limit: M04)
11.01.2022Reply to a communication from the examining division
23.09.2022Despatch of a communication from the examining division (Time limit: M04)
05.01.2023Reply to a communication from the examining division
03.04.2024Despatch of a communication from the examining division (Time limit: M04)
21.08.2024Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time
Request for further processing for:21.12.2018Request for further processing filed
21.12.2018Full payment received (date of receipt of payment)
Request granted
26.04.2019Decision despatched
Fees paidRenewal fee
27.07.2018Renewal fee patent year 03
25.07.2019Renewal fee patent year 04
23.07.2020Renewal fee patent year 05
26.07.2021Renewal fee patent year 06
27.07.2022Renewal fee patent year 07
26.07.2023Renewal fee patent year 08
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Cited inInternational search[X]EP0885841  (HITACHI ENG SERVICE [JP], et al);
 [X]JP2002245905  (MITSUBISHI ELECTRIC CORP);
 [X]WO2012080246  (ABB TECHNOLOGY AG [CH], et al);
 [X]DE202014003243U  (ABB TECHNOLOGY AG [CH]);
 [A]WO2014154292  (ABB TECHNOLOGY LTD [CH])
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.