EP3320752 - M2M CLUSTERING MANAGEMENT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 18.02.2022 Database last updated on 13.07.2024 | |
Former | The patent has been granted Status updated on 12.03.2021 | ||
Former | Grant of patent is intended Status updated on 16.11.2020 | ||
Former | Examination is in progress Status updated on 07.06.2019 | ||
Former | Request for examination was made Status updated on 13.04.2018 | ||
Former | The international publication has been made Status updated on 13.01.2017 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Convida Wireless, LLC 200 Bellevue Parkway Suite 300 Wilmington, DE 19809-3727 / US | [2021/15] |
Former [2018/20] | For all designated states Convida Wireless, LLC 200 Bellevue Parkway Suite 300 Wilmington, DE 19809-3727 / US | Inventor(s) | 01 /
MLADIN, Catalina, M. 137 Loller Road Hatboro, PA 19040 / US | 02 /
LU, Guang 1 Mendel Crescent Thornhill, Ontario L4J 9B6 / CA | 03 /
WANG, Chonggang 9 Carlyle Court Princeton, NJ 08540 / US | 04 /
SEED, Dale, N. 229 N. 36th Street Allentown, PA 18104 / US | 05 /
LI, Hongkun 107 Forge Court Malvern, PA 19355 / US | 06 /
LI, Xu 5313 Hunters Glen Drive Plainsboro, NJ 08536 / US | 07 /
DONG, Lijun 6085 African Holly Trail San Diego, CA 92130 / US | 08 /
LI, Qing 25 Hawthorne Drive Princeton Junction, NJ 08550-2029 / US | 09 /
FLYNN, William, Robert IV 451 Mayberry Road Schwenksville, PA 19473 / US | [2018/20] | Representative(s) | D Young & Co LLP 3 Noble Street London EC2V 7BQ / GB | [N/P] |
Former [2021/15] | D Young & Co LLP 120 Holborn London EC1N 2DY / GB | ||
Former [2018/20] | Small, Gary James, et al Carpmaels & Ransford LLP One Southampton Row London WC1B 5HA / GB | Application number, filing date | 16742506.5 | 08.07.2016 | [2018/20] | WO2016US41446 | Priority number, date | US201562189814P | 08.07.2015 Original published format: US 201562189814 P | [2018/20] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017007990 | Date: | 12.01.2017 | Language: | EN | [2017/02] | Type: | A1 Application with search report | No.: | EP3320752 | Date: | 16.05.2018 | Language: | EN | The application published by WIPO in one of the EPO official languages on 12.01.2017 takes the place of the publication of the European patent application. | [2018/20] | Type: | B1 Patent specification | No.: | EP3320752 | Date: | 14.04.2021 | Language: | EN | [2021/15] | Search report(s) | International search report - published on: | EP | 12.01.2017 | Classification | IPC: | H04W84/18, H04W84/04, H04W4/00 | [2018/20] | CPC: |
H04W84/18 (EP,KR,US);
H04L41/0816 (US);
H04L41/12 (US);
H04W24/02 (US);
H04W4/70 (KR,US);
H04W84/04 (EP,KR,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/20] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | M2M-CLUSTERVERWALTUNG | [2018/20] | English: | M2M CLUSTERING MANAGEMENT | [2018/20] | French: | GESTION DE REGROUPEMENTS M2M | [2018/20] | Entry into regional phase | 17.01.2018 | National basic fee paid | 17.01.2018 | Designation fee(s) paid | 17.01.2018 | Examination fee paid | Examination procedure | 17.01.2018 | Examination requested [2018/20] | 17.01.2018 | Date on which the examining division has become responsible | 20.08.2018 | Amendment by applicant (claims and/or description) | 13.06.2019 | Despatch of a communication from the examining division (Time limit: M04) | 22.10.2019 | Reply to a communication from the examining division | 17.11.2020 | Communication of intention to grant the patent | 02.03.2021 | Receipt of the translation of the claim(s) | 03.03.2021 | Fee for grant paid | 03.03.2021 | Fee for publishing/printing paid | Opposition(s) | 17.01.2022 | No opposition filed within time limit [2022/12] | Fees paid | Renewal fee | 27.07.2018 | Renewal fee patent year 03 | 29.07.2019 | Renewal fee patent year 04 | 27.07.2020 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 08.07.2016 | AL | 14.04.2021 | AT | 14.04.2021 | CY | 14.04.2021 | CZ | 14.04.2021 | DK | 14.04.2021 | EE | 14.04.2021 | ES | 14.04.2021 | FI | 14.04.2021 | HR | 14.04.2021 | IT | 14.04.2021 | LT | 14.04.2021 | LV | 14.04.2021 | MC | 14.04.2021 | MK | 14.04.2021 | NL | 14.04.2021 | PL | 14.04.2021 | RO | 14.04.2021 | RS | 14.04.2021 | SE | 14.04.2021 | SI | 14.04.2021 | SK | 14.04.2021 | SM | 14.04.2021 | TR | 14.04.2021 | IE | 08.07.2021 | LU | 08.07.2021 | BG | 14.07.2021 | NO | 14.07.2021 | GR | 15.07.2021 | BE | 31.07.2021 | CH | 31.07.2021 | LI | 31.07.2021 | IS | 14.08.2021 | PT | 16.08.2021 | [2024/29] |
Former [2024/22] | HU | 08.07.2016 | |
AL | 14.04.2021 | ||
AT | 14.04.2021 | ||
CY | 14.04.2021 | ||
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
EE | 14.04.2021 | ||
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
IT | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
MC | 14.04.2021 | ||
MK | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SI | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
IE | 08.07.2021 | ||
LU | 08.07.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
BE | 31.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
Former [2023/30] | HU | 08.07.2016 | |
AL | 14.04.2021 | ||
AT | 14.04.2021 | ||
CY | 14.04.2021 | ||
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
EE | 14.04.2021 | ||
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
IT | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
MC | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SI | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
IE | 08.07.2021 | ||
LU | 08.07.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
BE | 31.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
Former [2023/29] | HU | 08.07.2016 | |
AL | 14.04.2021 | ||
AT | 14.04.2021 | ||
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
EE | 14.04.2021 | ||
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
IT | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
MC | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SI | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
IE | 08.07.2021 | ||
LU | 08.07.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
BE | 31.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
Former [2022/36] | AL | 14.04.2021 | |
AT | 14.04.2021 | ||
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
EE | 14.04.2021 | ||
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
IT | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
MC | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SI | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
IE | 08.07.2021 | ||
LU | 08.07.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
BE | 31.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
Former [2022/35] | AL | 14.04.2021 | |
AT | 14.04.2021 | ||
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
EE | 14.04.2021 | ||
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
MC | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SI | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
IE | 08.07.2021 | ||
LU | 08.07.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
BE | 31.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
Former [2022/34] | AL | 14.04.2021 | |
AT | 14.04.2021 | ||
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
EE | 14.04.2021 | ||
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
MC | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SI | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
LU | 08.07.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
BE | 31.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
Former [2022/29] | AL | 14.04.2021 | |
AT | 14.04.2021 | ||
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
EE | 14.04.2021 | ||
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
MC | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SI | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
LU | 08.07.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
Former [2022/26] | AL | 14.04.2021 | |
AT | 14.04.2021 | ||
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
EE | 14.04.2021 | ||
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
MC | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
LU | 08.07.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
Former [2022/23] | AT | 14.04.2021 | |
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
EE | 14.04.2021 | ||
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
MC | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
LU | 08.07.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
Former [2022/21] | AT | 14.04.2021 | |
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
EE | 14.04.2021 | ||
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
MC | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
PT | 16.08.2021 | ||
IS | 29.12.2021 | ||
Former [2022/18] | AT | 14.04.2021 | |
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
EE | 14.04.2021 | ||
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
MC | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
PT | 16.08.2021 | ||
IS | 29.12.2021 | ||
Former [2022/10] | AT | 14.04.2021 | |
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
EE | 14.04.2021 | ||
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
PT | 16.08.2021 | ||
IS | 29.12.2021 | ||
Former [2022/09] | AT | 14.04.2021 | |
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
Former [2022/08] | AT | 14.04.2021 | |
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
Former [2022/07] | AT | 14.04.2021 | |
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
Former [2021/52] | AT | 14.04.2021 | |
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
Former [2021/51] | AT | 14.04.2021 | |
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
NL | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
Former [2021/50] | AT | 14.04.2021 | |
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
NL | 14.04.2021 | ||
SE | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
PT | 16.08.2021 | ||
Former [2021/49] | AT | 14.04.2021 | |
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
NL | 14.04.2021 | ||
SE | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
Former [2021/47] | AT | 14.04.2021 | |
FI | 14.04.2021 | ||
LT | 14.04.2021 | ||
NL | 14.04.2021 | ||
BG | 14.07.2021 | ||
Former [2021/46] | AT | 14.04.2021 | |
FI | 14.04.2021 | ||
LT | 14.04.2021 | Cited in | International search | [XA]US2013016625 (MURIAS RONALD GERALD [CA], et al) [X] 1,11 * abstract * * paragraphs [0008] - [0014] *[A] 2-10,12-20; | [XA]EP2552168 (ALCATEL LUCENT [FR]) [X] 1,11 * paragraphs [0055] - [0065] - [0076] - [0081] * [A] 2-10,12-20; | [XA] - MANJESHWAR A ET AL, "APTEEN: a hybrid protocol for efficient routing and comprehensive information retrieval in wireless", PARALLEL AND DISTRIBUTED PROCESSING SYMPOSIUM., PROCEEDINGS INTERNATIO NAL, IPDPS 2002, ABSTRACTS AND CD-ROM FT. LAUDERDALE, FL, USA 15-19 APRIL 2002, LOS ALAMITOS, CA, USA,IEEE COMPUT. SOC, US, (20010415), doi:10.1109/IPDPS.2002.1016600, ISBN 978-0-7695-1573-1, page 8pp, XP032343270 [X] 1,11 * Section 5. Sensor Network Model * [A] 2-10,12-20 DOI: http://dx.doi.org/10.1109/IPDPS.2002.1016600 | Examination | US7035240 | US2010090823 |