EP3240660 - TRANSLUCENT BUILDING ELEMENT AND METHOD OF MANUFACTURING SAME [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 16.10.2020 Database last updated on 12.08.2024 | |
Former | The patent has been granted Status updated on 08.11.2019 | ||
Former | Grant of patent is intended Status updated on 13.08.2019 | ||
Former | Examination is in progress Status updated on 19.01.2018 | ||
Former | Request for examination was made Status updated on 06.10.2017 | ||
Former | The international publication has been made Status updated on 25.11.2016 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Zospeum Holding B.V. Zeestraat 100 2518 AD 's-Gravenhage / NL | [2017/45] | Inventor(s) | 01 /
VAN DELFT WESTERHOF, Pieter Jan George c/o Zeestraat 100 2518 AD 's-Gravenhage / NL | [2017/45] | Representative(s) | V.O. P.O. Box 87930 Carnegieplein 5 2508 DH Den Haag / NL | [2017/45] | Application number, filing date | 16744883.6 | 19.05.2016 | [2017/45] | WO2016NL50358 | Priority number, date | NL20152014822 | 19.05.2015 Original published format: NL 2014822 | [2017/45] | Filing language | NL | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016186500 | Date: | 24.11.2016 | Language: | EN | [2016/47] | Type: | A1 Application with search report | No.: | EP3240660 | Date: | 08.11.2017 | Language: | EN | The application published by WIPO in one of the EPO official languages on 24.11.2016 takes the place of the publication of the European patent application. | [2017/45] | Type: | B1 Patent specification | No.: | EP3240660 | Date: | 11.12.2019 | Language: | EN | [2019/50] | Search report(s) | International search report - published on: | EP | 24.11.2016 | Classification | IPC: | B28B23/00, B29C44/12, B29K95/00, B29L31/10 | [2017/45] | CPC: |
B28B23/0037 (EP,US);
E04C2/288 (EP,US);
E04C2/54 (EP,US);
B29C44/1271 (EP,US);
B29K2995/0026 (EP,US);
B29K2995/0029 (US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/45] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | TRANSLUZENTES GEBÄUDEELEMENT UND VERFAHREN ZUR HERSTELLUNG DAVON | [2017/45] | English: | TRANSLUCENT BUILDING ELEMENT AND METHOD OF MANUFACTURING SAME | [2017/45] | French: | ÉLÉMENT DE CONSTRUCTION TRANSLUCIDE ET PROCÉDÉ DE FABRICATION DE CE DERNIER | [2019/33] |
Former [2017/45] | ÉLÉMENT DE CONSTRUCTION TRANSPARENT ET PROCÉDÉ DE FABRICATION DE CE DERNIER | Entry into regional phase | 31.07.2017 | National basic fee paid | 31.07.2017 | Designation fee(s) paid | 31.07.2017 | Examination fee paid | Examination procedure | 31.07.2017 | Amendment by applicant (claims and/or description) | 31.07.2017 | Examination requested [2017/45] | 31.07.2017 | Date on which the examining division has become responsible | 19.01.2018 | Despatch of a communication from the examining division (Time limit: M04) | 29.05.2018 | Reply to a communication from the examining division | 09.10.2018 | Despatch of a communication from the examining division (Time limit: M04) | 14.02.2019 | Reply to a communication from the examining division | 11.04.2019 | Despatch of a communication from the examining division (Time limit: M02) | 21.06.2019 | Reply to a communication from the examining division | 14.08.2019 | Communication of intention to grant the patent | 30.10.2019 | Fee for grant paid | 30.10.2019 | Fee for publishing/printing paid | 30.10.2019 | Receipt of the translation of the claim(s) | Opposition(s) | 14.09.2020 | No opposition filed within time limit [2020/47] | Fees paid | Renewal fee | 24.04.2018 | Renewal fee patent year 03 | 23.04.2019 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 19.05.2016 | AL | 11.12.2019 | AT | 11.12.2019 | CY | 11.12.2019 | CZ | 11.12.2019 | EE | 11.12.2019 | HR | 11.12.2019 | LT | 11.12.2019 | LV | 11.12.2019 | MC | 11.12.2019 | MK | 11.12.2019 | MT | 11.12.2019 | PL | 11.12.2019 | RO | 11.12.2019 | RS | 11.12.2019 | SI | 11.12.2019 | SK | 11.12.2019 | SM | 11.12.2019 | BG | 11.03.2020 | GR | 12.03.2020 | IS | 11.04.2020 | PT | 06.05.2020 | IE | 19.05.2020 | LU | 19.05.2020 | [2022/32] |
Former [2022/28] | HU | 19.05.2016 | |
AL | 11.12.2019 | ||
AT | 11.12.2019 | ||
CY | 11.12.2019 | ||
CZ | 11.12.2019 | ||
EE | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
MC | 11.12.2019 | ||
MT | 11.12.2019 | ||
PL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SI | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
BG | 11.03.2020 | ||
GR | 12.03.2020 | ||
IS | 11.04.2020 | ||
PT | 06.05.2020 | ||
IE | 19.05.2020 | ||
LU | 19.05.2020 | ||
Former [2021/20] | AL | 11.12.2019 | |
AT | 11.12.2019 | ||
CZ | 11.12.2019 | ||
EE | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
MC | 11.12.2019 | ||
PL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SI | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
BG | 11.03.2020 | ||
GR | 12.03.2020 | ||
IS | 11.04.2020 | ||
PT | 06.05.2020 | ||
IE | 19.05.2020 | ||
LU | 19.05.2020 | ||
Former [2021/15] | AL | 11.12.2019 | |
AT | 11.12.2019 | ||
CZ | 11.12.2019 | ||
EE | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
MC | 11.12.2019 | ||
PL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SI | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
BG | 11.03.2020 | ||
GR | 12.03.2020 | ||
IS | 11.04.2020 | ||
PT | 06.05.2020 | ||
LU | 19.05.2020 | ||
Former [2021/12] | AL | 11.12.2019 | |
AT | 11.12.2019 | ||
CZ | 11.12.2019 | ||
EE | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
MC | 11.12.2019 | ||
PL | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SI | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
BG | 11.03.2020 | ||
GR | 12.03.2020 | ||
IS | 11.04.2020 | ||
PT | 06.05.2020 | ||
Former [2020/51] | AL | 11.12.2019 | |
AT | 11.12.2019 | ||
CZ | 11.12.2019 | ||
EE | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SI | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
BG | 11.03.2020 | ||
GR | 12.03.2020 | ||
IS | 11.04.2020 | ||
PT | 06.05.2020 | ||
Former [2020/40] | AL | 11.12.2019 | |
CZ | 11.12.2019 | ||
EE | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
BG | 11.03.2020 | ||
GR | 12.03.2020 | ||
IS | 11.04.2020 | ||
PT | 06.05.2020 | ||
Former [2020/37] | AL | 11.12.2019 | |
CZ | 11.12.2019 | ||
EE | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
SK | 11.12.2019 | ||
SM | 11.12.2019 | ||
BG | 11.03.2020 | ||
GR | 12.03.2020 | ||
PT | 06.05.2020 | ||
Former [2020/36] | AL | 11.12.2019 | |
CZ | 11.12.2019 | ||
EE | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
BG | 11.03.2020 | ||
GR | 12.03.2020 | ||
PT | 06.05.2020 | ||
Former [2020/35] | AL | 11.12.2019 | |
CZ | 11.12.2019 | ||
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
RO | 11.12.2019 | ||
RS | 11.12.2019 | ||
BG | 11.03.2020 | ||
GR | 12.03.2020 | ||
Former [2020/32] | AL | 11.12.2019 | |
HR | 11.12.2019 | ||
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
RS | 11.12.2019 | ||
BG | 11.03.2020 | ||
GR | 12.03.2020 | ||
Former [2020/25] | HR | 11.12.2019 | |
LT | 11.12.2019 | ||
LV | 11.12.2019 | ||
RS | 11.12.2019 | ||
BG | 11.03.2020 | ||
GR | 12.03.2020 | ||
Former [2020/23] | LT | 11.12.2019 | |
LV | 11.12.2019 | ||
BG | 11.03.2020 | ||
GR | 12.03.2020 | ||
Former [2020/22] | LT | 11.12.2019 | |
BG | 11.03.2020 | Cited in | International search | [A]EP1970179 (DELUNAMAGMA IND GMBH [AT]) [A] 1-15 * paragraphs [0001] , [0010] , [0011] , [0020] - [0025] - [0049] - [0065] - [0084]; figure 4 *; | [A]DE102008046769 (FISCHER OLIVER [AT]) [A] 1-15* paragraphs [0009] - [0020] - [0043] - [0053] - [0064]; figures 1-5,10 *; | [XI]EP2177332 (FREI JUERGEN [AT]) [X] 1-4,6-15 * paragraphs [0001] , [0002] , [0007] - [0011] - [0013] - [0015] - [0020] , [0021] , [0026] , [0031] , [0046] - [0051]; figures 1-6 * [I] 5; | [A]US2011185660 (ROYE ANDREAS [DE]) [A] 1-15 * paragraphs [0054] , [0055]; figure 5 *; | [A]KR101492767B (HYUN CHANG NEOTECK CO LTD) [A] 1-15 * abstract *; | [A]JP2015057312 (NIHON FUNEN CO LTD) [A] 1-15 * abstract * | Examination | DE202015000056U |