blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3240660

EP3240660 - TRANSLUCENT BUILDING ELEMENT AND METHOD OF MANUFACTURING SAME [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  16.10.2020
Database last updated on 12.08.2024
FormerThe patent has been granted
Status updated on  08.11.2019
FormerGrant of patent is intended
Status updated on  13.08.2019
FormerExamination is in progress
Status updated on  19.01.2018
FormerRequest for examination was made
Status updated on  06.10.2017
FormerThe international publication has been made
Status updated on  25.11.2016
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
Zospeum Holding B.V.
Zeestraat 100
2518 AD 's-Gravenhage / NL
[2017/45]
Inventor(s)01 / VAN DELFT WESTERHOF, Pieter Jan George
c/o Zeestraat 100
2518 AD 's-Gravenhage / NL
 [2017/45]
Representative(s)V.O.
P.O. Box 87930
Carnegieplein 5
2508 DH Den Haag / NL
[2017/45]
Application number, filing date16744883.619.05.2016
[2017/45]
WO2016NL50358
Priority number, dateNL2015201482219.05.2015         Original published format: NL 2014822
[2017/45]
Filing languageNL
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2016186500
Date:24.11.2016
Language:EN
[2016/47]
Type: A1 Application with search report 
No.:EP3240660
Date:08.11.2017
Language:EN
The application published by WIPO in one of the EPO official languages on 24.11.2016 takes the place of the publication of the European patent application.
[2017/45]
Type: B1 Patent specification 
No.:EP3240660
Date:11.12.2019
Language:EN
[2019/50]
Search report(s)International search report - published on:EP24.11.2016
ClassificationIPC:B28B23/00, B29C44/12, B29K95/00, B29L31/10
[2017/45]
CPC:
B28B23/0037 (EP,US); E04C2/288 (EP,US); E04C2/54 (EP,US);
B29C44/1271 (EP,US); B29K2995/0026 (EP,US); B29K2995/0029 (US);
B29L2031/10 (EP,US); E04C1/41 (US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/45]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:TRANSLUZENTES GEBÄUDEELEMENT UND VERFAHREN ZUR HERSTELLUNG DAVON[2017/45]
English:TRANSLUCENT BUILDING ELEMENT AND METHOD OF MANUFACTURING SAME[2017/45]
French:ÉLÉMENT DE CONSTRUCTION TRANSLUCIDE ET PROCÉDÉ DE FABRICATION DE CE DERNIER[2019/33]
Former [2017/45]ÉLÉMENT DE CONSTRUCTION TRANSPARENT ET PROCÉDÉ DE FABRICATION DE CE DERNIER
Entry into regional phase31.07.2017National basic fee paid 
31.07.2017Designation fee(s) paid 
31.07.2017Examination fee paid 
Examination procedure31.07.2017Amendment by applicant (claims and/or description)
31.07.2017Examination requested  [2017/45]
31.07.2017Date on which the examining division has become responsible
19.01.2018Despatch of a communication from the examining division (Time limit: M04)
29.05.2018Reply to a communication from the examining division
09.10.2018Despatch of a communication from the examining division (Time limit: M04)
14.02.2019Reply to a communication from the examining division
11.04.2019Despatch of a communication from the examining division (Time limit: M02)
21.06.2019Reply to a communication from the examining division
14.08.2019Communication of intention to grant the patent
30.10.2019Fee for grant paid
30.10.2019Fee for publishing/printing paid
30.10.2019Receipt of the translation of the claim(s)
Opposition(s)14.09.2020No opposition filed within time limit [2020/47]
Fees paidRenewal fee
24.04.2018Renewal fee patent year 03
23.04.2019Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU19.05.2016
AL11.12.2019
AT11.12.2019
CY11.12.2019
CZ11.12.2019
EE11.12.2019
HR11.12.2019
LT11.12.2019
LV11.12.2019
MC11.12.2019
MK11.12.2019
MT11.12.2019
PL11.12.2019
RO11.12.2019
RS11.12.2019
SI11.12.2019
SK11.12.2019
SM11.12.2019
BG11.03.2020
GR12.03.2020
IS11.04.2020
PT06.05.2020
IE19.05.2020
LU19.05.2020
[2022/32]
Former [2022/28]HU19.05.2016
AL11.12.2019
AT11.12.2019
CY11.12.2019
CZ11.12.2019
EE11.12.2019
HR11.12.2019
LT11.12.2019
LV11.12.2019
MC11.12.2019
MT11.12.2019
PL11.12.2019
RO11.12.2019
RS11.12.2019
SI11.12.2019
SK11.12.2019
SM11.12.2019
BG11.03.2020
GR12.03.2020
IS11.04.2020
PT06.05.2020
IE19.05.2020
LU19.05.2020
Former [2021/20]AL11.12.2019
AT11.12.2019
CZ11.12.2019
EE11.12.2019
HR11.12.2019
LT11.12.2019
LV11.12.2019
MC11.12.2019
PL11.12.2019
RO11.12.2019
RS11.12.2019
SI11.12.2019
SK11.12.2019
SM11.12.2019
BG11.03.2020
GR12.03.2020
IS11.04.2020
PT06.05.2020
IE19.05.2020
LU19.05.2020
Former [2021/15]AL11.12.2019
AT11.12.2019
CZ11.12.2019
EE11.12.2019
HR11.12.2019
LT11.12.2019
LV11.12.2019
MC11.12.2019
PL11.12.2019
RO11.12.2019
RS11.12.2019
SI11.12.2019
SK11.12.2019
SM11.12.2019
BG11.03.2020
GR12.03.2020
IS11.04.2020
PT06.05.2020
LU19.05.2020
Former [2021/12]AL11.12.2019
AT11.12.2019
CZ11.12.2019
EE11.12.2019
HR11.12.2019
LT11.12.2019
LV11.12.2019
MC11.12.2019
PL11.12.2019
RO11.12.2019
RS11.12.2019
SI11.12.2019
SK11.12.2019
SM11.12.2019
BG11.03.2020
GR12.03.2020
IS11.04.2020
PT06.05.2020
Former [2020/51]AL11.12.2019
AT11.12.2019
CZ11.12.2019
EE11.12.2019
HR11.12.2019
LT11.12.2019
LV11.12.2019
RO11.12.2019
RS11.12.2019
SI11.12.2019
SK11.12.2019
SM11.12.2019
BG11.03.2020
GR12.03.2020
IS11.04.2020
PT06.05.2020
Former [2020/40]AL11.12.2019
CZ11.12.2019
EE11.12.2019
HR11.12.2019
LT11.12.2019
LV11.12.2019
RO11.12.2019
RS11.12.2019
SK11.12.2019
SM11.12.2019
BG11.03.2020
GR12.03.2020
IS11.04.2020
PT06.05.2020
Former [2020/37]AL11.12.2019
CZ11.12.2019
EE11.12.2019
HR11.12.2019
LT11.12.2019
LV11.12.2019
RO11.12.2019
RS11.12.2019
SK11.12.2019
SM11.12.2019
BG11.03.2020
GR12.03.2020
PT06.05.2020
Former [2020/36]AL11.12.2019
CZ11.12.2019
EE11.12.2019
HR11.12.2019
LT11.12.2019
LV11.12.2019
RO11.12.2019
RS11.12.2019
BG11.03.2020
GR12.03.2020
PT06.05.2020
Former [2020/35]AL11.12.2019
CZ11.12.2019
HR11.12.2019
LT11.12.2019
LV11.12.2019
RO11.12.2019
RS11.12.2019
BG11.03.2020
GR12.03.2020
Former [2020/32]AL11.12.2019
HR11.12.2019
LT11.12.2019
LV11.12.2019
RS11.12.2019
BG11.03.2020
GR12.03.2020
Former [2020/25]HR11.12.2019
LT11.12.2019
LV11.12.2019
RS11.12.2019
BG11.03.2020
GR12.03.2020
Former [2020/23]LT11.12.2019
LV11.12.2019
BG11.03.2020
GR12.03.2020
Former [2020/22]LT11.12.2019
BG11.03.2020
Cited inInternational search[A]EP1970179  (DELUNAMAGMA IND GMBH [AT]) [A] 1-15 * paragraphs [0001] , [0010] , [0011] , [0020] - [0025] - [0049] - [0065] - [0084]; figure 4 *;
 [A]DE102008046769  (FISCHER OLIVER [AT]) [A] 1-15* paragraphs [0009] - [0020] - [0043] - [0053] - [0064]; figures 1-5,10 *;
 [XI]EP2177332  (FREI JUERGEN [AT]) [X] 1-4,6-15 * paragraphs [0001] , [0002] , [0007] - [0011] - [0013] - [0015] - [0020] , [0021] , [0026] , [0031] , [0046] - [0051]; figures 1-6 * [I] 5;
 [A]US2011185660  (ROYE ANDREAS [DE]) [A] 1-15 * paragraphs [0054] , [0055]; figure 5 *;
 [A]KR101492767B  (HYUN CHANG NEOTECK CO LTD) [A] 1-15 * abstract *;
 [A]JP2015057312  (NIHON FUNEN CO LTD) [A] 1-15 * abstract *
ExaminationDE202015000056U
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.