EP3338029 - COMBINED DEVICE WITH COOKING HOB AND VAPOUR EXTRACTION UNIT [Right-click to bookmark this link] | |||
Former [2018/26] | COMBINATION APPLIANCE HAVING A COOKTOP AND STEAM EXTRACTION DEVICE | ||
[2019/33] | Status | No opposition filed within time limit Status updated on 13.01.2023 Database last updated on 03.08.2024 | |
Former | The patent has been granted Status updated on 04.02.2022 | ||
Former | Grant of patent is intended Status updated on 14.10.2021 | ||
Former | Examination is in progress Status updated on 30.06.2020 | ||
Former | Grant of patent is intended Status updated on 17.06.2020 | ||
Former | Examination is in progress Status updated on 19.07.2019 | ||
Former | Request for examination was made Status updated on 25.05.2018 | ||
Former | The international publication has been made Status updated on 25.02.2017 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states BSH Hausgeräte GmbH Carl-Wery-Strasse 34 81739 München / DE | [2018/26] | Inventor(s) | 01 /
FLESCH, Sebastien 22 Rue des primevères 67150 Gerstheim / FR | 02 /
LEBRUN, Yves 11 Rue des Faisans 67114 Eschau / FR | 03 /
MEINHARDT, Gert Sparbachstrasse 8 75053 Gondelsheim / DE | 04 /
METZ, Daniel Heckenweg 10 76689 Karlsdorf-Neuthard / DE | [2018/26] | Application number, filing date | 16747895.7 | 05.08.2016 | [2018/26] | WO2016EP68776 | Priority number, date | EP20150290210 | 19.08.2015 Original published format: EP 15290210 | [2018/26] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2017029135 | Date: | 23.02.2017 | Language: | DE | [2017/08] | Type: | A1 Application with search report | No.: | EP3338029 | Date: | 27.06.2018 | Language: | DE | The application published by WIPO in one of the EPO official languages on 23.02.2017 takes the place of the publication of the European patent application. | [2018/26] | Type: | B1 Patent specification | No.: | EP3338029 | Date: | 09.03.2022 | Language: | DE | [2022/10] | Search report(s) | International search report - published on: | EP | 23.02.2017 | Classification | IPC: | F24C15/20 | [2018/26] | CPC: |
F24C15/2042 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/26] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | KOMBINATIONSGERÄT MIT KOCHFELD UND DUNSTABZUGSVORRICHTUNG | [2018/26] | English: | COMBINED DEVICE WITH COOKING HOB AND VAPOUR EXTRACTION UNIT | [2019/33] | French: | APPAREIL COMBINÉ AVEC PLAQUE DE CUISSON ET DISPOSITIF D'EVACUATION DES FUMÉES | [2019/33] |
Former [2018/26] | COMBINATION APPLIANCE HAVING A COOKTOP AND STEAM EXTRACTION DEVICE | ||
Former [2018/26] | APPAREIL COMBINÉ COMPRENANT UNE PLAQUE DE CUISSON ET UN DISPOSITIF D'ASPIRATION DES ÉMANATIONS | Entry into regional phase | 19.03.2018 | National basic fee paid | 19.03.2018 | Designation fee(s) paid | 19.03.2018 | Examination fee paid | Examination procedure | 05.02.2018 | Date on which the examining division has become responsible | 19.03.2018 | Examination requested [2018/26] | 06.04.2018 | Amendment by applicant (claims and/or description) | 24.07.2019 | Despatch of a communication from the examining division (Time limit: M04) | 21.11.2019 | Reply to a communication from the examining division | 18.06.2020 | Communication of intention to grant the patent | 25.06.2020 | Observations by third parties | 29.06.2020 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 28.07.2020 | Despatch of a communication from the examining division (Time limit: M06) | 26.01.2021 | Reply to a communication from the examining division | 15.10.2021 | Communication of intention to grant the patent | 27.01.2022 | Fee for grant paid | 27.01.2022 | Fee for publishing/printing paid | 27.01.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 12.12.2022 | No opposition filed within time limit [2023/07] | Fees paid | Renewal fee | 31.08.2018 | Renewal fee patent year 03 | 02.09.2019 | Renewal fee patent year 04 | 31.08.2020 | Renewal fee patent year 05 | 31.08.2021 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 05.08.2016 | AL | 09.03.2022 | CY | 09.03.2022 | CZ | 09.03.2022 | DK | 09.03.2022 | EE | 09.03.2022 | ES | 09.03.2022 | FI | 09.03.2022 | HR | 09.03.2022 | IT | 09.03.2022 | LT | 09.03.2022 | LV | 09.03.2022 | MC | 09.03.2022 | MK | 09.03.2022 | NL | 09.03.2022 | PL | 09.03.2022 | RO | 09.03.2022 | RS | 09.03.2022 | SE | 09.03.2022 | SI | 09.03.2022 | SK | 09.03.2022 | SM | 09.03.2022 | TR | 09.03.2022 | BG | 09.06.2022 | NO | 09.06.2022 | GR | 10.06.2022 | IS | 09.07.2022 | PT | 11.07.2022 | AT | 05.08.2022 | GB | 05.08.2022 | IE | 05.08.2022 | LU | 05.08.2022 | BE | 31.08.2022 | CH | 31.08.2022 | FR | 31.08.2022 | LI | 31.08.2022 | [2024/29] |
Former [2024/27] | HU | 05.08.2016 | |
AL | 09.03.2022 | ||
CY | 09.03.2022 | ||
CZ | 09.03.2022 | ||
DK | 09.03.2022 | ||
EE | 09.03.2022 | ||
ES | 09.03.2022 | ||
FI | 09.03.2022 | ||
HR | 09.03.2022 | ||
IT | 09.03.2022 | ||
LT | 09.03.2022 | ||
LV | 09.03.2022 | ||
MC | 09.03.2022 | ||
MK | 09.03.2022 | ||
NL | 09.03.2022 | ||
PL | 09.03.2022 | ||
RO | 09.03.2022 | ||
RS | 09.03.2022 | ||
SE | 09.03.2022 | ||
SI | 09.03.2022 | ||
SK | 09.03.2022 | ||
SM | 09.03.2022 | ||
BG | 09.06.2022 | ||
NO | 09.06.2022 | ||
GR | 10.06.2022 | ||
IS | 09.07.2022 | ||
PT | 11.07.2022 | ||
AT | 05.08.2022 | ||
GB | 05.08.2022 | ||
IE | 05.08.2022 | ||
LU | 05.08.2022 | ||
BE | 31.08.2022 | ||
CH | 31.08.2022 | ||
FR | 31.08.2022 | ||
LI | 31.08.2022 | ||
Former [2024/20] | HU | 05.08.2016 | |
AL | 09.03.2022 | ||
CY | 09.03.2022 | ||
CZ | 09.03.2022 | ||
DK | 09.03.2022 | ||
EE | 09.03.2022 | ||
ES | 09.03.2022 | ||
FI | 09.03.2022 | ||
HR | 09.03.2022 | ||
IT | 09.03.2022 | ||
LT | 09.03.2022 | ||
LV | 09.03.2022 | ||
MC | 09.03.2022 | ||
NL | 09.03.2022 | ||
PL | 09.03.2022 | ||
RO | 09.03.2022 | ||
RS | 09.03.2022 | ||
SE | 09.03.2022 | ||
SI | 09.03.2022 | ||
SK | 09.03.2022 | ||
SM | 09.03.2022 | ||
BG | 09.06.2022 | ||
NO | 09.06.2022 | ||
GR | 10.06.2022 | ||
IS | 09.07.2022 | ||
PT | 11.07.2022 | ||
AT | 05.08.2022 | ||
GB | 05.08.2022 | ||
IE | 05.08.2022 | ||
LU | 05.08.2022 | ||
BE | 31.08.2022 | ||
CH | 31.08.2022 | ||
FR | 31.08.2022 | ||
LI | 31.08.2022 | ||
Former [2024/18] | HU | 05.08.2016 | |
AL | 09.03.2022 | ||
CZ | 09.03.2022 | ||
DK | 09.03.2022 | ||
EE | 09.03.2022 | ||
ES | 09.03.2022 | ||
FI | 09.03.2022 | ||
HR | 09.03.2022 | ||
IT | 09.03.2022 | ||
LT | 09.03.2022 | ||
LV | 09.03.2022 | ||
MC | 09.03.2022 | ||
NL | 09.03.2022 | ||
PL | 09.03.2022 | ||
RO | 09.03.2022 | ||
RS | 09.03.2022 | ||
SE | 09.03.2022 | ||
SI | 09.03.2022 | ||
SK | 09.03.2022 | ||
SM | 09.03.2022 | ||
BG | 09.06.2022 | ||
NO | 09.06.2022 | ||
GR | 10.06.2022 | ||
IS | 09.07.2022 | ||
PT | 11.07.2022 | ||
AT | 05.08.2022 | ||
GB | 05.08.2022 | ||
IE | 05.08.2022 | ||
LU | 05.08.2022 | ||
BE | 31.08.2022 | ||
CH | 31.08.2022 | ||
FR | 31.08.2022 | ||
LI | 31.08.2022 | ||
Former [2023/48] | AL | 09.03.2022 | |
CZ | 09.03.2022 | ||
DK | 09.03.2022 | ||
EE | 09.03.2022 | ||
ES | 09.03.2022 | ||
FI | 09.03.2022 | ||
HR | 09.03.2022 | ||
IT | 09.03.2022 | ||
LT | 09.03.2022 | ||
LV | 09.03.2022 | ||
MC | 09.03.2022 | ||
NL | 09.03.2022 | ||
PL | 09.03.2022 | ||
RO | 09.03.2022 | ||
RS | 09.03.2022 | ||
SE | 09.03.2022 | ||
SI | 09.03.2022 | ||
SK | 09.03.2022 | ||
SM | 09.03.2022 | ||
BG | 09.06.2022 | ||
NO | 09.06.2022 | ||
GR | 10.06.2022 | ||
IS | 09.07.2022 | ||
PT | 11.07.2022 | ||
AT | 05.08.2022 | ||
GB | 05.08.2022 | ||
IE | 05.08.2022 | ||
LU | 05.08.2022 | ||
BE | 31.08.2022 | ||
CH | 31.08.2022 | ||
FR | 31.08.2022 | ||
LI | 31.08.2022 | ||
Former [2023/47] | AL | 09.03.2022 | |
CZ | 09.03.2022 | ||
DK | 09.03.2022 | ||
EE | 09.03.2022 | ||
ES | 09.03.2022 | ||
FI | 09.03.2022 | ||
HR | 09.03.2022 | ||
IT | 09.03.2022 | ||
LT | 09.03.2022 | ||
LV | 09.03.2022 | ||
MC | 09.03.2022 | ||
NL | 09.03.2022 | ||
PL | 09.03.2022 | ||
RO | 09.03.2022 | ||
RS | 09.03.2022 | ||
SE | 09.03.2022 | ||
SI | 09.03.2022 | ||
SK | 09.03.2022 | ||
SM | 09.03.2022 | ||
BG | 09.06.2022 | ||
NO | 09.06.2022 | ||
GR | 10.06.2022 | ||
IS | 09.07.2022 | ||
PT | 11.07.2022 | ||
GB | 05.08.2022 | ||
IE | 05.08.2022 | ||
LU | 05.08.2022 | ||
BE | 31.08.2022 | ||
CH | 31.08.2022 | ||
FR | 31.08.2022 | ||
LI | 31.08.2022 | ||
Former [2023/42] | AL | 09.03.2022 | |
CZ | 09.03.2022 | ||
DK | 09.03.2022 | ||
EE | 09.03.2022 | ||
ES | 09.03.2022 | ||
FI | 09.03.2022 | ||
HR | 09.03.2022 | ||
IT | 09.03.2022 | ||
LT | 09.03.2022 | ||
LV | 09.03.2022 | ||
MC | 09.03.2022 | ||
NL | 09.03.2022 | ||
PL | 09.03.2022 | ||
RO | 09.03.2022 | ||
RS | 09.03.2022 | ||
SE | 09.03.2022 | ||
SI | 09.03.2022 | ||
SK | 09.03.2022 | ||
SM | 09.03.2022 | ||
BG | 09.06.2022 | ||
NO | 09.06.2022 | ||
GR | 10.06.2022 | ||
IS | 09.07.2022 | ||
PT | 11.07.2022 | ||
IE | 05.08.2022 | ||
LU | 05.08.2022 | ||
BE | 31.08.2022 | ||
CH | 31.08.2022 | ||
FR | 31.08.2022 | ||
LI | 31.08.2022 | ||
Former [2023/35] | AL | 09.03.2022 | |
CZ | 09.03.2022 | ||
DK | 09.03.2022 | ||
EE | 09.03.2022 | ||
ES | 09.03.2022 | ||
FI | 09.03.2022 | ||
HR | 09.03.2022 | ||
IT | 09.03.2022 | ||
LT | 09.03.2022 | ||
LV | 09.03.2022 | ||
MC | 09.03.2022 | ||
NL | 09.03.2022 | ||
PL | 09.03.2022 | ||
RO | 09.03.2022 | ||
RS | 09.03.2022 | ||
SE | 09.03.2022 | ||
SI | 09.03.2022 | ||
SK | 09.03.2022 | ||
SM | 09.03.2022 | ||
BG | 09.06.2022 | ||
NO | 09.06.2022 | ||
GR | 10.06.2022 | ||
IS | 09.07.2022 | ||
PT | 11.07.2022 | ||
IE | 05.08.2022 | ||
LU | 05.08.2022 | ||
CH | 31.08.2022 | ||
FR | 31.08.2022 | ||
LI | 31.08.2022 | ||
Former [2023/33] | AL | 09.03.2022 | |
CZ | 09.03.2022 | ||
DK | 09.03.2022 | ||
EE | 09.03.2022 | ||
ES | 09.03.2022 | ||
FI | 09.03.2022 | ||
HR | 09.03.2022 | ||
LT | 09.03.2022 | ||
LV | 09.03.2022 | ||
MC | 09.03.2022 | ||
NL | 09.03.2022 | ||
PL | 09.03.2022 | ||
RO | 09.03.2022 | ||
RS | 09.03.2022 | ||
SE | 09.03.2022 | ||
SI | 09.03.2022 | ||
SK | 09.03.2022 | ||
SM | 09.03.2022 | ||
BG | 09.06.2022 | ||
NO | 09.06.2022 | ||
GR | 10.06.2022 | ||
IS | 09.07.2022 | ||
PT | 11.07.2022 | ||
IE | 05.08.2022 | ||
LU | 05.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
Former [2023/21] | AL | 09.03.2022 | |
CZ | 09.03.2022 | ||
DK | 09.03.2022 | ||
EE | 09.03.2022 | ||
ES | 09.03.2022 | ||
FI | 09.03.2022 | ||
HR | 09.03.2022 | ||
LT | 09.03.2022 | ||
LV | 09.03.2022 | ||
MC | 09.03.2022 | ||
NL | 09.03.2022 | ||
PL | 09.03.2022 | ||
RO | 09.03.2022 | ||
RS | 09.03.2022 | ||
SE | 09.03.2022 | ||
SI | 09.03.2022 | ||
SK | 09.03.2022 | ||
SM | 09.03.2022 | ||
BG | 09.06.2022 | ||
NO | 09.06.2022 | ||
GR | 10.06.2022 | ||
IS | 09.07.2022 | ||
PT | 11.07.2022 | ||
LU | 05.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
Former [2023/16] | AL | 09.03.2022 | |
CZ | 09.03.2022 | ||
DK | 09.03.2022 | ||
EE | 09.03.2022 | ||
ES | 09.03.2022 | ||
FI | 09.03.2022 | ||
HR | 09.03.2022 | ||
LT | 09.03.2022 | ||
LV | 09.03.2022 | ||
MC | 09.03.2022 | ||
NL | 09.03.2022 | ||
PL | 09.03.2022 | ||
RO | 09.03.2022 | ||
RS | 09.03.2022 | ||
SE | 09.03.2022 | ||
SI | 09.03.2022 | ||
SK | 09.03.2022 | ||
SM | 09.03.2022 | ||
BG | 09.06.2022 | ||
NO | 09.06.2022 | ||
GR | 10.06.2022 | ||
IS | 09.07.2022 | ||
PT | 11.07.2022 | ||
Former [2023/10] | AL | 09.03.2022 | |
CZ | 09.03.2022 | ||
DK | 09.03.2022 | ||
EE | 09.03.2022 | ||
ES | 09.03.2022 | ||
FI | 09.03.2022 | ||
HR | 09.03.2022 | ||
LT | 09.03.2022 | ||
LV | 09.03.2022 | ||
NL | 09.03.2022 | ||
PL | 09.03.2022 | ||
RO | 09.03.2022 | ||
RS | 09.03.2022 | ||
SE | 09.03.2022 | ||
SI | 09.03.2022 | ||
SK | 09.03.2022 | ||
SM | 09.03.2022 | ||
BG | 09.06.2022 | ||
NO | 09.06.2022 | ||
GR | 10.06.2022 | ||
IS | 09.07.2022 | ||
PT | 11.07.2022 | ||
Former [2023/07] | AL | 09.03.2022 | |
CZ | 09.03.2022 | ||
DK | 09.03.2022 | ||
EE | 09.03.2022 | ||
ES | 09.03.2022 | ||
FI | 09.03.2022 | ||
HR | 09.03.2022 | ||
LT | 09.03.2022 | ||
LV | 09.03.2022 | ||
NL | 09.03.2022 | ||
PL | 09.03.2022 | ||
RO | 09.03.2022 | ||
RS | 09.03.2022 | ||
SE | 09.03.2022 | ||
SK | 09.03.2022 | ||
SM | 09.03.2022 | ||
BG | 09.06.2022 | ||
NO | 09.06.2022 | ||
GR | 10.06.2022 | ||
IS | 09.07.2022 | ||
PT | 11.07.2022 | ||
Former [2023/01] | AL | 09.03.2022 | |
CZ | 09.03.2022 | ||
EE | 09.03.2022 | ||
ES | 09.03.2022 | ||
FI | 09.03.2022 | ||
HR | 09.03.2022 | ||
LT | 09.03.2022 | ||
LV | 09.03.2022 | ||
NL | 09.03.2022 | ||
PL | 09.03.2022 | ||
RO | 09.03.2022 | ||
RS | 09.03.2022 | ||
SE | 09.03.2022 | ||
SK | 09.03.2022 | ||
SM | 09.03.2022 | ||
BG | 09.06.2022 | ||
NO | 09.06.2022 | ||
GR | 10.06.2022 | ||
IS | 09.07.2022 | ||
PT | 11.07.2022 | ||
Former [2022/51] | CZ | 09.03.2022 | |
EE | 09.03.2022 | ||
ES | 09.03.2022 | ||
FI | 09.03.2022 | ||
HR | 09.03.2022 | ||
LT | 09.03.2022 | ||
LV | 09.03.2022 | ||
NL | 09.03.2022 | ||
PL | 09.03.2022 | ||
RO | 09.03.2022 | ||
RS | 09.03.2022 | ||
SE | 09.03.2022 | ||
SK | 09.03.2022 | ||
SM | 09.03.2022 | ||
BG | 09.06.2022 | ||
NO | 09.06.2022 | ||
GR | 10.06.2022 | ||
IS | 09.07.2022 | ||
PT | 11.07.2022 | ||
Former [2022/50] | CZ | 09.03.2022 | |
EE | 09.03.2022 | ||
ES | 09.03.2022 | ||
FI | 09.03.2022 | ||
HR | 09.03.2022 | ||
LT | 09.03.2022 | ||
LV | 09.03.2022 | ||
NL | 09.03.2022 | ||
PL | 09.03.2022 | ||
RO | 09.03.2022 | ||
RS | 09.03.2022 | ||
SE | 09.03.2022 | ||
SK | 09.03.2022 | ||
SM | 09.03.2022 | ||
BG | 09.06.2022 | ||
NO | 09.06.2022 | ||
GR | 10.06.2022 | ||
PT | 11.07.2022 | ||
Former [2022/49] | CZ | 09.03.2022 | |
EE | 09.03.2022 | ||
ES | 09.03.2022 | ||
FI | 09.03.2022 | ||
HR | 09.03.2022 | ||
LT | 09.03.2022 | ||
LV | 09.03.2022 | ||
NL | 09.03.2022 | ||
RO | 09.03.2022 | ||
RS | 09.03.2022 | ||
SE | 09.03.2022 | ||
SK | 09.03.2022 | ||
SM | 09.03.2022 | ||
BG | 09.06.2022 | ||
NO | 09.06.2022 | ||
GR | 10.06.2022 | ||
PT | 11.07.2022 | ||
Former [2022/48] | CZ | 09.03.2022 | |
EE | 09.03.2022 | ||
ES | 09.03.2022 | ||
FI | 09.03.2022 | ||
HR | 09.03.2022 | ||
LT | 09.03.2022 | ||
LV | 09.03.2022 | ||
NL | 09.03.2022 | ||
RO | 09.03.2022 | ||
RS | 09.03.2022 | ||
SE | 09.03.2022 | ||
SM | 09.03.2022 | ||
BG | 09.06.2022 | ||
NO | 09.06.2022 | ||
GR | 10.06.2022 | ||
PT | 11.07.2022 | ||
Former [2022/47] | ES | 09.03.2022 | |
FI | 09.03.2022 | ||
HR | 09.03.2022 | ||
LT | 09.03.2022 | ||
LV | 09.03.2022 | ||
NL | 09.03.2022 | ||
RO | 09.03.2022 | ||
RS | 09.03.2022 | ||
SE | 09.03.2022 | ||
SM | 09.03.2022 | ||
BG | 09.06.2022 | ||
NO | 09.06.2022 | ||
GR | 10.06.2022 | ||
PT | 11.07.2022 | ||
Former [2022/44] | FI | 09.03.2022 | |
HR | 09.03.2022 | ||
LT | 09.03.2022 | ||
LV | 09.03.2022 | ||
NL | 09.03.2022 | ||
RS | 09.03.2022 | ||
SE | 09.03.2022 | ||
BG | 09.06.2022 | ||
NO | 09.06.2022 | ||
GR | 10.06.2022 | ||
Former [2022/39] | FI | 09.03.2022 | |
HR | 09.03.2022 | ||
LT | 09.03.2022 | ||
LV | 09.03.2022 | ||
RS | 09.03.2022 | ||
SE | 09.03.2022 | ||
BG | 09.06.2022 | ||
NO | 09.06.2022 | ||
GR | 10.06.2022 | ||
Former [2022/36] | HR | 09.03.2022 | |
LT | 09.03.2022 | ||
LV | 09.03.2022 | ||
RS | 09.03.2022 | ||
SE | 09.03.2022 | ||
BG | 09.06.2022 | ||
NO | 09.06.2022 | ||
GR | 10.06.2022 | ||
Former [2022/35] | HR | 09.03.2022 | |
LT | 09.03.2022 | ||
RS | 09.03.2022 | ||
SE | 09.03.2022 | ||
BG | 09.06.2022 | ||
NO | 09.06.2022 | ||
Former [2022/33] | LT | 09.03.2022 | |
NO | 09.06.2022 | Cited in | International search | [XYI]US2010163549 (GAGAS JOHN M [US], et al) [X] 1,2,4,5,7-10 * figures 1-4 * * paragraphs [0101] , [ 116] - [0120] * [Y] 6 [I] 3; | [Y]DE3741721 (MATSUSHITA ELECTRIC IND CO LTD [JP]) [Y] 6 * figures 1-4 *; | [A]US2674991 (SCHAEFER HAROLD W) [A] 6 * figures 1,2 *; | [A]DE202010009195U (EXKLUSIV HAUBEN GUTMANN GMBH [DE]) [A] 1-10 * figures 1,2 * * paragraphs [0015] - [0017] *; | [A]US4562827 (CEROLA JOSEPH J [US]) [A] 1-10 * figures 1-6 * | Examination | DE102015200642 |