blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3257264

EP3257264 - LOUDSPEAKER ENCLOSURE WITH A SEALED ACOUSTIC SUSPENSION CHAMBER [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  14.05.2021
Database last updated on 03.09.2024
FormerThe patent has been granted
Status updated on  05.06.2020
FormerGrant of patent is intended
Status updated on  10.02.2020
FormerRequest for examination was made
Status updated on  17.11.2017
FormerThe international publication has been made
Status updated on  25.08.2017
Most recent event   Tooltip27.04.2024Lapse of the patent in a contracting state
New state(s): MK
published on 29.05.2024  [2024/22]
Applicant(s)For all designated states
De Profundis AB
Kung Magnus Väg 30
352 34 VÄXJÖ / SE
[2020/10]
Former [2017/51]For all designated states
Keyofd Aktiebolag
Vikstensvägen 36
121 56 Johanneshov / SE
Inventor(s)01 / JAGUSTE, Rohan
Vikstensvägen 36
Lgh 1201
121 56 Johanneshov / SE
 [2017/51]
Representative(s)Zacco Sweden AB
P.O. Box 5581
Löjtnantsgatan 21
114 85 Stockholm / SE
[N/P]
Former [2017/51]Zacco Sweden AB
P.O. Box 5581
114 85 Stockholm / SE
Application number, filing date16749544.912.02.2016
[2017/51]
WO2016SE50110
Priority number, dateSE2015005016413.02.2015         Original published format: SE 1550164
[2017/51]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2016130077
Date:18.08.2016
Language:EN
[2016/33]
Type: A1 Application with search report 
No.:EP3257264
Date:20.12.2017
Language:EN
The application published by WIPO in one of the EPO official languages on 18.08.2016 takes the place of the publication of the European patent application.
[2017/51]
Type: B1 Patent specification 
No.:EP3257264
Date:08.07.2020
Language:EN
[2020/28]
Search report(s)International search report - published on:SE18.08.2016
(Supplementary) European search report - dispatched on:EP05.12.2018
ClassificationIPC:H04R1/28, H04R1/02, H04R9/06, H04R29/00
[2018/39]
CPC:
H04R1/2834 (EP,KR,SE,US); H04R1/2803 (US); H04R1/02 (SE);
H04R1/2826 (US); H04R1/2842 (EP,KR,SE,US); H04R1/288 (EP,KR,US);
H04R1/2896 (EP,KR,US); H04R29/001 (EP,US); H04R1/026 (EP,US);
H04R1/028 (EP,KR,US); H04R2201/028 (EP,US); H04R2499/11 (EP,US);
H04R2499/13 (EP,US); H04R9/063 (SE) (-)
Former IPC [2017/51]H04R1/28, H04R1/02, H04R9/06
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/51]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:LAUTSPRECHERGEHÄUSE MIT EINER ABGEDICHTETEN AKUSTISCHEN AUFHÄNGUNGSKAMMER[2017/51]
English:LOUDSPEAKER ENCLOSURE WITH A SEALED ACOUSTIC SUSPENSION CHAMBER[2017/51]
French:ENCEINTE DE HAUT-PARLEUR COMPRENANT CHAMBRE À SUSPENSION ACOUSTIQUE ÉTANCHE[2017/51]
Entry into regional phase24.08.2017National basic fee paid 
24.08.2017Search fee paid 
24.08.2017Designation fee(s) paid 
24.08.2017Examination fee paid 
Examination procedure24.08.2017Examination requested  [2017/51]
24.08.2017Date on which the examining division has become responsible
26.06.2019Amendment by applicant (claims and/or description)
11.02.2020Communication of intention to grant the patent
26.05.2020Fee for grant paid
26.05.2020Fee for publishing/printing paid
26.05.2020Receipt of the translation of the claim(s)
Opposition(s)09.04.2021No opposition filed within time limit [2021/24]
Fees paidRenewal fee
11.04.2018Renewal fee patent year 03
22.08.2019Renewal fee patent year 04
25.02.2020Renewal fee patent year 05
Penalty fee
Additional fee for renewal fee
28.02.201803   M06   Fee paid on   11.04.2018
28.02.201904   M06   Fee paid on   22.08.2019
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU12.02.2016
AL08.07.2020
AT08.07.2020
CY08.07.2020
CZ08.07.2020
EE08.07.2020
ES08.07.2020
FI08.07.2020
HR08.07.2020
IT08.07.2020
LT08.07.2020
LV08.07.2020
MC08.07.2020
MK08.07.2020
NL08.07.2020
PL08.07.2020
RO08.07.2020
RS08.07.2020
SE08.07.2020
SI08.07.2020
SK08.07.2020
SM08.07.2020
BG08.10.2020
NO08.10.2020
GR09.10.2020
IS08.11.2020
PT09.11.2020
GB12.02.2021
IE12.02.2021
LU12.02.2021
BE28.02.2021
CH28.02.2021
DK28.02.2021
FR28.02.2021
LI28.02.2021
[2024/22]
Former [2023/33]HU12.02.2016
AL08.07.2020
AT08.07.2020
CY08.07.2020
CZ08.07.2020
EE08.07.2020
ES08.07.2020
FI08.07.2020
HR08.07.2020
IT08.07.2020
LT08.07.2020
LV08.07.2020
MC08.07.2020
NL08.07.2020
PL08.07.2020
RO08.07.2020
RS08.07.2020
SE08.07.2020
SI08.07.2020
SK08.07.2020
SM08.07.2020
BG08.10.2020
NO08.10.2020
GR09.10.2020
IS08.11.2020
PT09.11.2020
GB12.02.2021
IE12.02.2021
LU12.02.2021
BE28.02.2021
CH28.02.2021
DK28.02.2021
FR28.02.2021
LI28.02.2021
Former [2023/30]AL08.07.2020
AT08.07.2020
CY08.07.2020
CZ08.07.2020
EE08.07.2020
ES08.07.2020
FI08.07.2020
HR08.07.2020
IT08.07.2020
LT08.07.2020
LV08.07.2020
MC08.07.2020
NL08.07.2020
PL08.07.2020
RO08.07.2020
RS08.07.2020
SE08.07.2020
SI08.07.2020
SK08.07.2020
SM08.07.2020
BG08.10.2020
NO08.10.2020
GR09.10.2020
IS08.11.2020
PT09.11.2020
GB12.02.2021
IE12.02.2021
LU12.02.2021
BE28.02.2021
CH28.02.2021
DK28.02.2021
FR28.02.2021
LI28.02.2021
Former [2022/33]AL08.07.2020
AT08.07.2020
CZ08.07.2020
EE08.07.2020
ES08.07.2020
FI08.07.2020
HR08.07.2020
IT08.07.2020
LT08.07.2020
LV08.07.2020
MC08.07.2020
NL08.07.2020
PL08.07.2020
RO08.07.2020
RS08.07.2020
SE08.07.2020
SI08.07.2020
SK08.07.2020
SM08.07.2020
BG08.10.2020
NO08.10.2020
GR09.10.2020
IS08.11.2020
PT09.11.2020
GB12.02.2021
IE12.02.2021
LU12.02.2021
BE28.02.2021
CH28.02.2021
DK28.02.2021
FR28.02.2021
LI28.02.2021
Former [2022/08]AL08.07.2020
AT08.07.2020
CZ08.07.2020
EE08.07.2020
ES08.07.2020
FI08.07.2020
HR08.07.2020
IT08.07.2020
LT08.07.2020
LV08.07.2020
MC08.07.2020
NL08.07.2020
PL08.07.2020
RO08.07.2020
RS08.07.2020
SE08.07.2020
SI08.07.2020
SK08.07.2020
SM08.07.2020
BG08.10.2020
NO08.10.2020
GR09.10.2020
IS08.11.2020
PT09.11.2020
GB12.02.2021
IE12.02.2021
LU12.02.2021
CH28.02.2021
DK28.02.2021
FR28.02.2021
LI28.02.2021
Former [2022/07]AL08.07.2020
AT08.07.2020
CZ08.07.2020
EE08.07.2020
ES08.07.2020
FI08.07.2020
HR08.07.2020
IT08.07.2020
LT08.07.2020
LV08.07.2020
MC08.07.2020
NL08.07.2020
PL08.07.2020
RO08.07.2020
RS08.07.2020
SE08.07.2020
SI08.07.2020
SK08.07.2020
SM08.07.2020
BG08.10.2020
NO08.10.2020
GR09.10.2020
IS08.11.2020
PT09.11.2020
IE12.02.2021
LU12.02.2021
CH28.02.2021
FR28.02.2021
LI28.02.2021
Former [2021/47]AL08.07.2020
AT08.07.2020
CZ08.07.2020
EE08.07.2020
ES08.07.2020
FI08.07.2020
HR08.07.2020
IT08.07.2020
LT08.07.2020
LV08.07.2020
MC08.07.2020
NL08.07.2020
PL08.07.2020
RO08.07.2020
RS08.07.2020
SE08.07.2020
SI08.07.2020
SK08.07.2020
SM08.07.2020
BG08.10.2020
NO08.10.2020
GR09.10.2020
IS08.11.2020
PT09.11.2020
LU12.02.2021
CH28.02.2021
LI28.02.2021
Former [2021/41]AL08.07.2020
AT08.07.2020
CZ08.07.2020
EE08.07.2020
ES08.07.2020
FI08.07.2020
HR08.07.2020
IT08.07.2020
LT08.07.2020
LV08.07.2020
MC08.07.2020
NL08.07.2020
PL08.07.2020
RO08.07.2020
RS08.07.2020
SE08.07.2020
SI08.07.2020
SK08.07.2020
SM08.07.2020
BG08.10.2020
NO08.10.2020
GR09.10.2020
IS08.11.2020
PT09.11.2020
Former [2021/36]AL08.07.2020
AT08.07.2020
CZ08.07.2020
EE08.07.2020
ES08.07.2020
FI08.07.2020
HR08.07.2020
IT08.07.2020
LT08.07.2020
LV08.07.2020
NL08.07.2020
PL08.07.2020
RO08.07.2020
RS08.07.2020
SE08.07.2020
SI08.07.2020
SK08.07.2020
SM08.07.2020
BG08.10.2020
NO08.10.2020
GR09.10.2020
IS08.11.2020
PT09.11.2020
Former [2021/28]AL08.07.2020
AT08.07.2020
CZ08.07.2020
EE08.07.2020
ES08.07.2020
FI08.07.2020
HR08.07.2020
IT08.07.2020
LT08.07.2020
LV08.07.2020
NL08.07.2020
PL08.07.2020
RO08.07.2020
RS08.07.2020
SE08.07.2020
SK08.07.2020
SM08.07.2020
BG08.10.2020
NO08.10.2020
GR09.10.2020
IS08.11.2020
PT09.11.2020
Former [2021/25]AL08.07.2020
AT08.07.2020
CZ08.07.2020
EE08.07.2020
ES08.07.2020
FI08.07.2020
HR08.07.2020
IT08.07.2020
LT08.07.2020
LV08.07.2020
NL08.07.2020
PL08.07.2020
RO08.07.2020
RS08.07.2020
SE08.07.2020
SM08.07.2020
BG08.10.2020
NO08.10.2020
GR09.10.2020
IS08.11.2020
PT09.11.2020
Former [2021/22]AT08.07.2020
CZ08.07.2020
EE08.07.2020
ES08.07.2020
FI08.07.2020
HR08.07.2020
IT08.07.2020
LT08.07.2020
LV08.07.2020
NL08.07.2020
PL08.07.2020
RO08.07.2020
RS08.07.2020
SE08.07.2020
SM08.07.2020
BG08.10.2020
NO08.10.2020
GR09.10.2020
IS08.11.2020
PT09.11.2020
Former [2021/20]AT08.07.2020
ES08.07.2020
FI08.07.2020
HR08.07.2020
IT08.07.2020
LT08.07.2020
LV08.07.2020
NL08.07.2020
PL08.07.2020
RS08.07.2020
SE08.07.2020
BG08.10.2020
NO08.10.2020
GR09.10.2020
IS08.11.2020
PT09.11.2020
Former [2021/17]AT08.07.2020
ES08.07.2020
FI08.07.2020
HR08.07.2020
LT08.07.2020
LV08.07.2020
NL08.07.2020
PL08.07.2020
RS08.07.2020
SE08.07.2020
BG08.10.2020
NO08.10.2020
GR09.10.2020
IS08.11.2020
PT09.11.2020
Former [2021/10]AT08.07.2020
ES08.07.2020
FI08.07.2020
HR08.07.2020
LT08.07.2020
LV08.07.2020
PL08.07.2020
RS08.07.2020
SE08.07.2020
BG08.10.2020
NO08.10.2020
GR09.10.2020
IS08.11.2020
PT09.11.2020
Former [2021/09]AT08.07.2020
ES08.07.2020
FI08.07.2020
LT08.07.2020
SE08.07.2020
BG08.10.2020
NO08.10.2020
GR09.10.2020
PT09.11.2020
Former [2021/08]ES08.07.2020
FI08.07.2020
LT08.07.2020
SE08.07.2020
BG08.10.2020
NO08.10.2020
PT09.11.2020
Former [2021/07]FI08.07.2020
LT08.07.2020
NO08.10.2020
Documents cited:Search[A]EP0340435  (YAMAHA CORP [JP]) [A] 5* column 8, line 29 - column 15, line 42; figure 1 *;
 [Y]WO0162043  (AMERICAN TECH CORP [US]) [Y] 6 * figures 4,6,7,11 *;
 [XAYI]US2006078144  (STILES ENRIQUE M [US], et al) [X] 1,2,4,15 * paragraphs [0015] , [0016] , [0069] , [0073] - [0076]; figures 24,26,27 * [A] 5 [Y] 6,9 [I] 3,7,8;
 [Y]CN202454272U  (YONG LIN) [Y] 9 * the whole document *
International search[A]US4286688  (O'MALLEY ARTHUR L);
 [A]US4379951  (GABR SAAD Z M [GB]);
 [A]US4870691  (MINDEL GERARD S [CA]);
 [A]WO0160114  (COEFIN RONALD C [US]);
 [A]WO0162043  (AMERICAN TECH CORP [US]);
 [A]EP1487235  (MATSUSHITA ELECTRIC IND CO LTD [JP]);
 [XA]US2006078144  (STILES ENRIQUE M [US], et al);
 [XA]US2006078136  (STILES ENRIQUE M [US], et al);
 [XA]US2007058830  (SETIABUDI J D [ID]);
 [A]WO2012051217  (SAHYOUN JOSEPH Y [US]);
 [A]US2014341394  (CROFT III JAMES J [US])
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.