EP3341253 - ELECTRIC PARKING BRAKE WITH AUXILIARY POWER SUPPLY [Right-click to bookmark this link] | |||
Former [2018/27] | ELECTRIC PARKING BRAKE DEVICE HAVING AN ADDITIONAL ENERGY SUPPLY | ||
[2021/08] | Status | No opposition filed within time limit Status updated on 13.05.2022 Database last updated on 06.07.2024 | |
Former | The patent has been granted Status updated on 12.06.2021 | ||
Former | Grant of patent is intended Status updated on 17.02.2021 | ||
Former | Request for examination was made Status updated on 01.06.2018 | ||
Former | The international publication has been made Status updated on 04.03.2017 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states KNORR-BREMSE Systeme für Nutzfahrzeuge GmbH Moosacher Strasse 80 80809 München / DE | [2018/27] | Inventor(s) | 01 /
FEUCHT, Thomas Schafbaumweg 23 71299 Wimsheim / DE | 02 /
HERGES, Michael Weitlstrasse 103 80935 München / DE | [2018/27] | Application number, filing date | 16750445.5 | 12.08.2016 | [2018/27] | WO2016EP69201 | Priority number, date | DE201510114176 | 26.08.2015 Original published format: DE102015114176 | [2018/27] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2017032617 | Date: | 02.03.2017 | Language: | DE | [2017/09] | Type: | A1 Application with search report | No.: | EP3341253 | Date: | 04.07.2018 | Language: | DE | The application published by WIPO in one of the EPO official languages on 02.03.2017 takes the place of the publication of the European patent application. | [2018/27] | Type: | B1 Patent specification | No.: | EP3341253 | Date: | 07.07.2021 | Language: | DE | [2021/27] | Search report(s) | International search report - published on: | EP | 02.03.2017 | Classification | IPC: | B60T13/38, B60T17/22, B60T15/24, B60T13/66, B60T13/68 | [2018/27] | CPC: |
B60T13/683 (EP);
B60T13/385 (EP);
B60T13/662 (EP);
B60T15/24 (EP);
B60T17/221 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/27] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | ELEKTRISCHE PARKBREMSEINRICHTUNG MIT ZUSÄTZLICHER ENERGIEVERSORGUNG | [2018/27] | English: | ELECTRIC PARKING BRAKE WITH AUXILIARY POWER SUPPLY | [2021/08] | French: | FREIN DE PARQUAGE ÉLECTRIQUE AVEC SOURCE AUXILIAIRE D'ÉNERGIE | [2021/08] |
Former [2018/27] | ELECTRIC PARKING BRAKE DEVICE HAVING AN ADDITIONAL ENERGY SUPPLY | ||
Former [2018/27] | SYSTÈME DE FREIN DE STATIONNEMENT ÉLECTRIQUE MUNI D'UNE ALIMENTATION EN ÉNERGIE SUPPLÉMENTAIRE | Entry into regional phase | 26.03.2018 | National basic fee paid | 26.03.2018 | Designation fee(s) paid | 26.03.2018 | Examination fee paid | Examination procedure | 15.02.2018 | Date on which the examining division has become responsible | 26.03.2018 | Examination requested [2018/27] | 05.10.2018 | Amendment by applicant (claims and/or description) | 18.02.2021 | Communication of intention to grant the patent | 27.05.2021 | Fee for grant paid | 27.05.2021 | Fee for publishing/printing paid | 27.05.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 08.04.2022 | No opposition filed within time limit [2022/24] | Fees paid | Renewal fee | 31.08.2018 | Renewal fee patent year 03 | 02.09.2019 | Renewal fee patent year 04 | 31.08.2020 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 12.08.2016 | AL | 07.07.2021 | CY | 07.07.2021 | CZ | 07.07.2021 | DK | 07.07.2021 | EE | 07.07.2021 | ES | 07.07.2021 | FI | 07.07.2021 | HR | 07.07.2021 | IT | 07.07.2021 | LT | 07.07.2021 | LV | 07.07.2021 | MC | 07.07.2021 | MK | 07.07.2021 | NL | 07.07.2021 | PL | 07.07.2021 | RO | 07.07.2021 | RS | 07.07.2021 | SI | 07.07.2021 | SK | 07.07.2021 | SM | 07.07.2021 | TR | 07.07.2021 | AT | 12.08.2021 | IE | 12.08.2021 | LU | 12.08.2021 | BE | 31.08.2021 | CH | 31.08.2021 | LI | 31.08.2021 | FR | 07.09.2021 | BG | 07.10.2021 | GB | 07.10.2021 | NO | 07.10.2021 | GR | 08.10.2021 | IS | 07.11.2021 | PT | 08.11.2021 | [2024/29] |
Former [2024/22] | HU | 12.08.2016 | |
AL | 07.07.2021 | ||
CY | 07.07.2021 | ||
CZ | 07.07.2021 | ||
DK | 07.07.2021 | ||
EE | 07.07.2021 | ||
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
HR | 07.07.2021 | ||
IT | 07.07.2021 | ||
LT | 07.07.2021 | ||
LV | 07.07.2021 | ||
MC | 07.07.2021 | ||
MK | 07.07.2021 | ||
NL | 07.07.2021 | ||
PL | 07.07.2021 | ||
RO | 07.07.2021 | ||
RS | 07.07.2021 | ||
SI | 07.07.2021 | ||
SK | 07.07.2021 | ||
SM | 07.07.2021 | ||
AT | 12.08.2021 | ||
IE | 12.08.2021 | ||
LU | 12.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
FR | 07.09.2021 | ||
BG | 07.10.2021 | ||
GB | 07.10.2021 | ||
NO | 07.10.2021 | ||
GR | 08.10.2021 | ||
IS | 07.11.2021 | ||
PT | 08.11.2021 | ||
Former [2023/30] | HU | 12.08.2016 | |
AL | 07.07.2021 | ||
CY | 07.07.2021 | ||
CZ | 07.07.2021 | ||
DK | 07.07.2021 | ||
EE | 07.07.2021 | ||
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
HR | 07.07.2021 | ||
IT | 07.07.2021 | ||
LT | 07.07.2021 | ||
LV | 07.07.2021 | ||
MC | 07.07.2021 | ||
NL | 07.07.2021 | ||
PL | 07.07.2021 | ||
RO | 07.07.2021 | ||
RS | 07.07.2021 | ||
SI | 07.07.2021 | ||
SK | 07.07.2021 | ||
SM | 07.07.2021 | ||
AT | 12.08.2021 | ||
IE | 12.08.2021 | ||
LU | 12.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
FR | 07.09.2021 | ||
BG | 07.10.2021 | ||
GB | 07.10.2021 | ||
NO | 07.10.2021 | ||
GR | 08.10.2021 | ||
IS | 07.11.2021 | ||
PT | 08.11.2021 | ||
Former [2023/29] | HU | 12.08.2016 | |
AL | 07.07.2021 | ||
CZ | 07.07.2021 | ||
DK | 07.07.2021 | ||
EE | 07.07.2021 | ||
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
HR | 07.07.2021 | ||
IT | 07.07.2021 | ||
LT | 07.07.2021 | ||
LV | 07.07.2021 | ||
MC | 07.07.2021 | ||
NL | 07.07.2021 | ||
PL | 07.07.2021 | ||
RO | 07.07.2021 | ||
RS | 07.07.2021 | ||
SI | 07.07.2021 | ||
SK | 07.07.2021 | ||
SM | 07.07.2021 | ||
AT | 12.08.2021 | ||
IE | 12.08.2021 | ||
LU | 12.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
FR | 07.09.2021 | ||
BG | 07.10.2021 | ||
GB | 07.10.2021 | ||
NO | 07.10.2021 | ||
GR | 08.10.2021 | ||
IS | 07.11.2021 | ||
PT | 08.11.2021 | ||
Former [2022/48] | AL | 07.07.2021 | |
CZ | 07.07.2021 | ||
DK | 07.07.2021 | ||
EE | 07.07.2021 | ||
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
HR | 07.07.2021 | ||
IT | 07.07.2021 | ||
LT | 07.07.2021 | ||
LV | 07.07.2021 | ||
MC | 07.07.2021 | ||
NL | 07.07.2021 | ||
PL | 07.07.2021 | ||
RO | 07.07.2021 | ||
RS | 07.07.2021 | ||
SI | 07.07.2021 | ||
SK | 07.07.2021 | ||
SM | 07.07.2021 | ||
AT | 12.08.2021 | ||
IE | 12.08.2021 | ||
LU | 12.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
FR | 07.09.2021 | ||
BG | 07.10.2021 | ||
GB | 07.10.2021 | ||
NO | 07.10.2021 | ||
GR | 08.10.2021 | ||
IS | 07.11.2021 | ||
PT | 08.11.2021 | ||
Former [2022/36] | AL | 07.07.2021 | |
CZ | 07.07.2021 | ||
DK | 07.07.2021 | ||
EE | 07.07.2021 | ||
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
HR | 07.07.2021 | ||
IT | 07.07.2021 | ||
LT | 07.07.2021 | ||
LV | 07.07.2021 | ||
MC | 07.07.2021 | ||
NL | 07.07.2021 | ||
PL | 07.07.2021 | ||
RO | 07.07.2021 | ||
RS | 07.07.2021 | ||
SI | 07.07.2021 | ||
SK | 07.07.2021 | ||
SM | 07.07.2021 | ||
IE | 12.08.2021 | ||
LU | 12.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
FR | 07.09.2021 | ||
BG | 07.10.2021 | ||
GB | 07.10.2021 | ||
NO | 07.10.2021 | ||
GR | 08.10.2021 | ||
IS | 07.11.2021 | ||
PT | 08.11.2021 | ||
Former [2022/35] | AL | 07.07.2021 | |
CZ | 07.07.2021 | ||
DK | 07.07.2021 | ||
EE | 07.07.2021 | ||
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
HR | 07.07.2021 | ||
LT | 07.07.2021 | ||
LV | 07.07.2021 | ||
MC | 07.07.2021 | ||
NL | 07.07.2021 | ||
PL | 07.07.2021 | ||
RO | 07.07.2021 | ||
RS | 07.07.2021 | ||
SI | 07.07.2021 | ||
SK | 07.07.2021 | ||
SM | 07.07.2021 | ||
IE | 12.08.2021 | ||
LU | 12.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
FR | 07.09.2021 | ||
BG | 07.10.2021 | ||
GB | 07.10.2021 | ||
NO | 07.10.2021 | ||
GR | 08.10.2021 | ||
IS | 07.11.2021 | ||
PT | 08.11.2021 | ||
Former [2022/34] | AL | 07.07.2021 | |
CZ | 07.07.2021 | ||
DK | 07.07.2021 | ||
EE | 07.07.2021 | ||
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
HR | 07.07.2021 | ||
LT | 07.07.2021 | ||
LV | 07.07.2021 | ||
MC | 07.07.2021 | ||
NL | 07.07.2021 | ||
PL | 07.07.2021 | ||
RO | 07.07.2021 | ||
RS | 07.07.2021 | ||
SI | 07.07.2021 | ||
SK | 07.07.2021 | ||
SM | 07.07.2021 | ||
LU | 12.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
FR | 07.09.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
GR | 08.10.2021 | ||
IS | 07.11.2021 | ||
PT | 08.11.2021 | ||
Former [2022/29] | AL | 07.07.2021 | |
CZ | 07.07.2021 | ||
DK | 07.07.2021 | ||
EE | 07.07.2021 | ||
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
HR | 07.07.2021 | ||
LT | 07.07.2021 | ||
LV | 07.07.2021 | ||
MC | 07.07.2021 | ||
NL | 07.07.2021 | ||
PL | 07.07.2021 | ||
RO | 07.07.2021 | ||
RS | 07.07.2021 | ||
SI | 07.07.2021 | ||
SK | 07.07.2021 | ||
SM | 07.07.2021 | ||
LU | 12.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
GR | 08.10.2021 | ||
IS | 07.11.2021 | ||
PT | 08.11.2021 | ||
Former [2022/25] | CZ | 07.07.2021 | |
DK | 07.07.2021 | ||
EE | 07.07.2021 | ||
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
HR | 07.07.2021 | ||
LT | 07.07.2021 | ||
LV | 07.07.2021 | ||
MC | 07.07.2021 | ||
NL | 07.07.2021 | ||
PL | 07.07.2021 | ||
RO | 07.07.2021 | ||
RS | 07.07.2021 | ||
SK | 07.07.2021 | ||
SM | 07.07.2021 | ||
LU | 12.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
GR | 08.10.2021 | ||
IS | 07.11.2021 | ||
PT | 08.11.2021 | ||
Former [2022/24] | CZ | 07.07.2021 | |
DK | 07.07.2021 | ||
EE | 07.07.2021 | ||
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
HR | 07.07.2021 | ||
LT | 07.07.2021 | ||
LV | 07.07.2021 | ||
MC | 07.07.2021 | ||
NL | 07.07.2021 | ||
PL | 07.07.2021 | ||
RO | 07.07.2021 | ||
RS | 07.07.2021 | ||
SK | 07.07.2021 | ||
LU | 12.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
GR | 08.10.2021 | ||
IS | 07.11.2021 | ||
PT | 08.11.2021 | ||
Former [2022/21] | DK | 07.07.2021 | |
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
HR | 07.07.2021 | ||
LT | 07.07.2021 | ||
LV | 07.07.2021 | ||
NL | 07.07.2021 | ||
PL | 07.07.2021 | ||
RS | 07.07.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
GR | 08.10.2021 | ||
IS | 07.11.2021 | ||
PT | 08.11.2021 | ||
Former [2022/11] | ES | 07.07.2021 | |
FI | 07.07.2021 | ||
HR | 07.07.2021 | ||
LT | 07.07.2021 | ||
LV | 07.07.2021 | ||
NL | 07.07.2021 | ||
PL | 07.07.2021 | ||
RS | 07.07.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
GR | 08.10.2021 | ||
IS | 07.11.2021 | ||
PT | 08.11.2021 | ||
Former [2022/09] | ES | 07.07.2021 | |
FI | 07.07.2021 | ||
LT | 07.07.2021 | ||
NL | 07.07.2021 | ||
RS | 07.07.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
PT | 08.11.2021 | ||
Former [2022/08] | ES | 07.07.2021 | |
FI | 07.07.2021 | ||
LT | 07.07.2021 | ||
NL | 07.07.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
Former [2022/07] | LT | 07.07.2021 | |
NL | 07.07.2021 | ||
NO | 07.10.2021 | Cited in | International search | [A]DE102011084534 (CONTINENTAL TEVES AG & CO OHG [DE]) [A] 1 * abstract * * paragraph [0045] * * figure 1 *; | [A]DE102011016740 (KNORR BREMSE SYSTEME [DE]) [A] 1-13 * abstract * * paragraphs [0033] , [0048] , [0056] - [0058] * * figures 1,2,8 *; | [A]KR20130009029 (HYUNDAI MOTOR CO LTD [KR]) [A] 1* abstract *; | [I]EP1504975 (WABCO GMBH [DE]) [I] 1-4,8-13 * claims 1,6 * * paragraphs [0024] - [0026] - [0031] , [0037] - [0042] - [0092] * * figures 1,2 * |