blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3342018

EP3342018 - SUBSEA AC POWER SUPPLY DEVICE COMPRISING A COMBINED SUBSEA TRANSFORMER AND SUBSEA SHUNT REACTOR [Right-click to bookmark this link]
Former [2018/27]COMBINED SUBSEA TRANSFORMER AND COMPENSATING HV REACTOR
[2020/18]
StatusNo opposition filed within time limit
Status updated on  30.07.2021
Database last updated on 31.08.2024
FormerThe patent has been granted
Status updated on  21.08.2020
FormerGrant of patent is intended
Status updated on  14.04.2020
FormerRequest for examination was made
Status updated on  01.06.2018
FormerThe international publication has been made
Status updated on  04.03.2017
Formerunknown
Status updated on  25.11.2016
Most recent event   Tooltip27.04.2024Lapse of the patent in a contracting state
New state(s): MK
published on 29.05.2024  [2024/22]
Applicant(s)For all designated states
FMC Kongsberg Subsea AS
P.O. Box 1012
3601 Kongsberg / NO
[2018/27]
Inventor(s)01 / STRØMSVIK, Torbjørn
Nes terrasse 39A
1394 Nesbru / NO
 [2020/39]
Former [2018/27]01 / STRØMSVIK, Torbjørn
Daletoppen 8
1387 Asker / NO
Representative(s)Santarelli
Tour Trinity
1 bis Esplanade de la Défense
92035 Paris La Défense Cedex / FR
[N/P]
Former [2018/27]Santarelli
49, avenue des Champs-Elysées
75008 Paris / FR
Application number, filing date16757031.625.08.2016
[2018/27]
WO2016EP70108
Priority number, dateNO2015000108426.08.2015         Original published format: NO 20151084
[2018/27]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2017032844
Date:02.03.2017
Language:EN
[2017/09]
Type: A1 Application with search report 
No.:EP3342018
Date:04.07.2018
Language:EN
The application published by WIPO in one of the EPO official languages on 02.03.2017 takes the place of the publication of the European patent application.
[2018/27]
Type: B1 Patent specification 
No.:EP3342018
Date:23.09.2020
Language:EN
[2020/39]
Search report(s)International search report - published on:EP02.03.2017
ClassificationIPC:H01F27/02, H01F27/40, H01F27/42, H02J3/18
[2020/18]
CPC:
H01F27/02 (EP,NO,US); H02J3/1821 (NO); H01F27/16 (US);
H01F27/12 (US); H01F27/28 (US); H01F27/32 (US);
H02J3/1878 (EP,US); H01F27/40 (EP,US); H01F27/42 (EP,US);
H02J2310/42 (EP) (-)
Former IPC [2018/27]H02J3/00, H01F27/02, E21B36/00, F16L53/00, H02H7/00
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/27]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:UNTERWASSER-WECHSELSTROM-LEISTUNGSVERSORGUNGSEINRICHTUNG MIT KOMBINIERTEM UNTERWASSER-TRANSFORMATOR UND UNTERWASSER-NEBENSCHLUSSDROSSEL[2020/18]
English:SUBSEA AC POWER SUPPLY DEVICE COMPRISING A COMBINED SUBSEA TRANSFORMER AND SUBSEA SHUNT REACTOR[2020/18]
French:DISPOSITIF D'ALIMENTATION ÉLECTRIQUE SOUS-MARINE EN COURANT ALTERNATIF COMPRENANT UN TRANSFORMATEUR SOUS-MARIN ET UN RÉACTEUR EN SHUNT SOUS-MARIN COMBINÉS[2020/18]
Former [2018/27]KOMBINIERTER UNTERWASSERTRANSFORMATOR UND HV-KOMPENSATIONSREAKTOR
Former [2018/27]COMBINED SUBSEA TRANSFORMER AND COMPENSATING HV REACTOR
Former [2018/27]COMBINAISON D'UN TRANSFORMATEUR SOUS-MARIN ET D'UN RÉACTEUR DE COMPENSATION HAUTE TENSION
Entry into regional phase23.03.2018National basic fee paid 
23.03.2018Designation fee(s) paid 
23.03.2018Examination fee paid 
Examination procedure23.03.2018Examination requested  [2018/27]
23.03.2018Date on which the examining division has become responsible
15.10.2018Amendment by applicant (claims and/or description)
15.04.2020Communication of intention to grant the patent
07.08.2020Fee for grant paid
07.08.2020Fee for publishing/printing paid
07.08.2020Receipt of the translation of the claim(s)
Opposition(s)24.06.2021No opposition filed within time limit [2021/35]
Fees paidRenewal fee
10.08.2018Renewal fee patent year 03
15.08.2019Renewal fee patent year 04
13.08.2020Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU25.08.2016
AL23.09.2020
AT23.09.2020
CY23.09.2020
CZ23.09.2020
DK23.09.2020
EE23.09.2020
ES23.09.2020
FI23.09.2020
HR23.09.2020
LT23.09.2020
LV23.09.2020
MC23.09.2020
MK23.09.2020
NL23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SE23.09.2020
SI23.09.2020
SK23.09.2020
SM23.09.2020
BG23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
[2024/22]
Former [2023/30]HU25.08.2016
AL23.09.2020
AT23.09.2020
CY23.09.2020
CZ23.09.2020
DK23.09.2020
EE23.09.2020
ES23.09.2020
FI23.09.2020
HR23.09.2020
LT23.09.2020
LV23.09.2020
MC23.09.2020
NL23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SE23.09.2020
SI23.09.2020
SK23.09.2020
SM23.09.2020
BG23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
Former [2023/29]HU25.08.2016
AL23.09.2020
AT23.09.2020
CZ23.09.2020
DK23.09.2020
EE23.09.2020
ES23.09.2020
FI23.09.2020
HR23.09.2020
LT23.09.2020
LV23.09.2020
MC23.09.2020
NL23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SE23.09.2020
SI23.09.2020
SK23.09.2020
SM23.09.2020
BG23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
Former [2023/27]HU25.08.2016
AL23.09.2020
AT23.09.2020
CZ23.09.2020
DK23.09.2020
EE23.09.2020
ES23.09.2020
FI23.09.2020
HR23.09.2020
LT23.09.2020
LV23.09.2020
MC23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SE23.09.2020
SI23.09.2020
SK23.09.2020
SM23.09.2020
BG23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
Former [2022/18]AL23.09.2020
AT23.09.2020
CZ23.09.2020
DK23.09.2020
EE23.09.2020
ES23.09.2020
FI23.09.2020
HR23.09.2020
LT23.09.2020
LV23.09.2020
MC23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SE23.09.2020
SI23.09.2020
SK23.09.2020
SM23.09.2020
BG23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
Former [2021/37]AL23.09.2020
AT23.09.2020
CZ23.09.2020
DK23.09.2020
EE23.09.2020
ES23.09.2020
FI23.09.2020
HR23.09.2020
LT23.09.2020
LV23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SE23.09.2020
SI23.09.2020
SK23.09.2020
SM23.09.2020
BG23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
Former [2021/36]AL23.09.2020
AT23.09.2020
CZ23.09.2020
EE23.09.2020
ES23.09.2020
FI23.09.2020
HR23.09.2020
LT23.09.2020
LV23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SE23.09.2020
SI23.09.2020
SK23.09.2020
SM23.09.2020
BG23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
Former [2021/28]AL23.09.2020
AT23.09.2020
CZ23.09.2020
EE23.09.2020
ES23.09.2020
FI23.09.2020
HR23.09.2020
LT23.09.2020
LV23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SE23.09.2020
SK23.09.2020
SM23.09.2020
BG23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
Former [2021/25]AL23.09.2020
AT23.09.2020
CZ23.09.2020
EE23.09.2020
ES23.09.2020
FI23.09.2020
HR23.09.2020
LT23.09.2020
LV23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SE23.09.2020
SM23.09.2020
BG23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
Former [2021/23]AT23.09.2020
CZ23.09.2020
EE23.09.2020
FI23.09.2020
HR23.09.2020
LT23.09.2020
LV23.09.2020
RO23.09.2020
RS23.09.2020
SE23.09.2020
SM23.09.2020
BG23.12.2020
GR24.12.2020
PT25.01.2021
Former [2021/22]CZ23.09.2020
EE23.09.2020
FI23.09.2020
HR23.09.2020
LT23.09.2020
LV23.09.2020
RO23.09.2020
RS23.09.2020
SE23.09.2020
BG23.12.2020
GR24.12.2020
PT25.01.2021
Former [2021/21]FI23.09.2020
HR23.09.2020
LT23.09.2020
LV23.09.2020
RS23.09.2020
SE23.09.2020
BG23.12.2020
GR24.12.2020
PT25.01.2021
Former [2021/20]FI23.09.2020
HR23.09.2020
LT23.09.2020
LV23.09.2020
RS23.09.2020
SE23.09.2020
BG23.12.2020
GR24.12.2020
Former [2021/10]FI23.09.2020
HR23.09.2020
LV23.09.2020
RS23.09.2020
SE23.09.2020
BG23.12.2020
GR24.12.2020
Former [2021/08]FI23.09.2020
SE23.09.2020
BG23.12.2020
Cited inInternational search[Y]JPS6030112  (FUJI ELECTRIC CO LTD) [Y] 1-11* abstract *;
 [XYI]EP2623838  (SIEMENS AG [DE]) [X] 1,2,4,5,10,11 * figures 1-3 * * paragraphs [0052] , [0053] , [0065] , [0066] , [0021] - [0026] - [0042] - [0045] * [Y] 1-11 [I] 3,6-9;
 [Y]WO2014170320  (FMC KONGSBERG SUBSEA AS [NO]) [Y] 1-11 * figures 2,1 * * page 6, line 21 - page 7, line 8 * * page 7, lines 29-31 * * pages 3,5 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.