EP3266233 - METHOD AND APPARATUS FOR PROVIDING SERVICE IN WIRELESS COMMUNICATION SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 12.03.2021 Database last updated on 08.06.2024 | |
Former | The patent has been granted Status updated on 03.04.2020 | ||
Former | Grant of patent is intended Status updated on 02.02.2020 | ||
Former | Examination is in progress Status updated on 12.10.2018 | ||
Former | Request for examination was made Status updated on 08.12.2017 | ||
Former | The international publication has been made Status updated on 15.08.2017 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states Samsung Electronics Co., Ltd. 129, Samsung-ro Yeongtong-gu Suwon-si Gyeonggi-do 16677 / KR | [2018/02] | Inventor(s) | 01 /
WON, Sung Hwan No. 305 22, Dokseodang-ro Yongsan-gu Seoul 04410 / KR | 02 /
KIM, Seonghoon No. 1006 108, Edu town-ro Yeongtong-gu Suwon-si Gyeonggi-do 16509 / KR | 03 /
CHO, Songyean No.103-1704 14, Yeouidaebang-ro 10-gil Dongjak-gu Seoul 07064 / KR | [2020/19] |
Former [2018/02] | 01 /
WON, Sung Hwan No. 305 22, Dokseodang-ro Yongsan-gu Seoul 04410 / KR | ||
02 /
KIM, Seonghoon No. 1006 108, Edu town-ro Yeongtong-gu Suwon-si Gyeonggi-do 16509 / KR | |||
03 /
CHO, Songyean No.103-1704 14 Yeouidaebang-ro 10-gil Dongjak-gu Seoul 07064 / KR | Representative(s) | HGF HGF Limited 1 City Walk Leeds LS11 9DX / GB | [N/P] |
Former [2018/02] | HGF Limited Saviour House 9 St. Saviourgate York YO1 8NQ / GB | Application number, filing date | 16759143.7 | 02.03.2016 | [2018/02] | WO2016KR02081 | Priority number, date | US201562126917P | 02.03.2015 Original published format: US 201562126917 P | US201562202406P | 07.08.2015 Original published format: US 201562202406 P | US201562232100P | 24.09.2015 Original published format: US 201562232100 P | [2018/02] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016140507 | Date: | 09.09.2016 | Language: | EN | [2016/36] | Type: | A1 Application with search report | No.: | EP3266233 | Date: | 10.01.2018 | Language: | EN | The application published by WIPO in one of the EPO official languages on 09.09.2016 takes the place of the publication of the European patent application. | [2018/02] | Type: | B1 Patent specification | No.: | EP3266233 | Date: | 06.05.2020 | Language: | EN | [2020/19] | Search report(s) | International search report - published on: | KR | 09.09.2016 | (Supplementary) European search report - dispatched on: | EP | 31.01.2018 | Classification | IPC: | H04W36/00, H04W8/06, H04W36/12, // H04W4/06 | [2020/08] | CPC: |
H04W36/0011 (EP,US);
H04W36/08 (EP,US);
H04L67/12 (US);
H04W28/02 (US);
H04W48/02 (US);
H04W48/06 (US);
|
Former IPC [2018/09] | H04W8/02 | ||
Former IPC [2018/02] | H04W8/02, H04W60/00, H04W88/08, H04W88/14 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/02] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | VERFAHREN UND VORRICHTUNG ZUR BEREITSTELLUNG VON DIENSTEN IN EINEM DRAHTLOSKOMMUNIKATIONSSYSTEM | [2018/02] | English: | METHOD AND APPARATUS FOR PROVIDING SERVICE IN WIRELESS COMMUNICATION SYSTEM | [2018/02] | French: | PROCÉDÉ ET APPAREIL PERMETTANT DE FOURNIR UN SERVICE DANS UN SYSTÈME DE COMMUNICATION SANS FIL | [2018/02] | Entry into regional phase | 14.08.2017 | National basic fee paid | 14.08.2017 | Search fee paid | 14.08.2017 | Designation fee(s) paid | 14.08.2017 | Examination fee paid | Examination procedure | 14.08.2017 | Examination requested [2018/02] | 14.08.2017 | Date on which the examining division has become responsible | 06.07.2018 | Amendment by applicant (claims and/or description) | 11.10.2018 | Despatch of a communication from the examining division (Time limit: M04) | 11.02.2019 | Reply to a communication from the examining division | 13.01.2020 | Cancellation of oral proceeding that was planned for 14.01.2020 | 14.01.2020 | Date of oral proceedings (cancelled) | 03.02.2020 | Communication of intention to grant the patent | 31.03.2020 | Fee for grant paid | 31.03.2020 | Fee for publishing/printing paid | 31.03.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 09.02.2021 | No opposition filed within time limit [2021/15] | Fees paid | Renewal fee | 23.03.2018 | Renewal fee patent year 03 | 22.03.2019 | Renewal fee patent year 04 | 24.03.2020 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 02.03.2016 | AL | 06.05.2020 | AT | 06.05.2020 | CY | 06.05.2020 | CZ | 06.05.2020 | DK | 06.05.2020 | EE | 06.05.2020 | ES | 06.05.2020 | HR | 06.05.2020 | IT | 06.05.2020 | LT | 06.05.2020 | LV | 06.05.2020 | MC | 06.05.2020 | MK | 06.05.2020 | PL | 06.05.2020 | RO | 06.05.2020 | RS | 06.05.2020 | SI | 06.05.2020 | SK | 06.05.2020 | SM | 06.05.2020 | BG | 06.08.2020 | NO | 06.08.2020 | GR | 07.08.2020 | IS | 06.09.2020 | PT | 07.09.2020 | [2024/22] |
Former [2023/33] | HU | 02.03.2016 | |
AL | 06.05.2020 | ||
AT | 06.05.2020 | ||
CY | 06.05.2020 | ||
CZ | 06.05.2020 | ||
DK | 06.05.2020 | ||
EE | 06.05.2020 | ||
ES | 06.05.2020 | ||
HR | 06.05.2020 | ||
IT | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
MC | 06.05.2020 | ||
PL | 06.05.2020 | ||
RO | 06.05.2020 | ||
RS | 06.05.2020 | ||
SI | 06.05.2020 | ||
SK | 06.05.2020 | ||
SM | 06.05.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2023/30] | AL | 06.05.2020 | |
AT | 06.05.2020 | ||
CY | 06.05.2020 | ||
CZ | 06.05.2020 | ||
DK | 06.05.2020 | ||
EE | 06.05.2020 | ||
ES | 06.05.2020 | ||
HR | 06.05.2020 | ||
IT | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
MC | 06.05.2020 | ||
PL | 06.05.2020 | ||
RO | 06.05.2020 | ||
RS | 06.05.2020 | ||
SI | 06.05.2020 | ||
SK | 06.05.2020 | ||
SM | 06.05.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2021/45] | AL | 06.05.2020 | |
AT | 06.05.2020 | ||
CZ | 06.05.2020 | ||
DK | 06.05.2020 | ||
EE | 06.05.2020 | ||
ES | 06.05.2020 | ||
HR | 06.05.2020 | ||
IT | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
MC | 06.05.2020 | ||
PL | 06.05.2020 | ||
RO | 06.05.2020 | ||
RS | 06.05.2020 | ||
SI | 06.05.2020 | ||
SK | 06.05.2020 | ||
SM | 06.05.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2021/24] | AL | 06.05.2020 | |
AT | 06.05.2020 | ||
CZ | 06.05.2020 | ||
DK | 06.05.2020 | ||
EE | 06.05.2020 | ||
ES | 06.05.2020 | ||
HR | 06.05.2020 | ||
IT | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
PL | 06.05.2020 | ||
RO | 06.05.2020 | ||
RS | 06.05.2020 | ||
SI | 06.05.2020 | ||
SK | 06.05.2020 | ||
SM | 06.05.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2021/10] | AL | 06.05.2020 | |
AT | 06.05.2020 | ||
CZ | 06.05.2020 | ||
DK | 06.05.2020 | ||
EE | 06.05.2020 | ||
ES | 06.05.2020 | ||
HR | 06.05.2020 | ||
IT | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
PL | 06.05.2020 | ||
RO | 06.05.2020 | ||
RS | 06.05.2020 | ||
SK | 06.05.2020 | ||
SM | 06.05.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2021/09] | AL | 06.05.2020 | |
AT | 06.05.2020 | ||
CZ | 06.05.2020 | ||
DK | 06.05.2020 | ||
EE | 06.05.2020 | ||
ES | 06.05.2020 | ||
HR | 06.05.2020 | ||
IT | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
RO | 06.05.2020 | ||
RS | 06.05.2020 | ||
SM | 06.05.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2021/08] | AL | 06.05.2020 | |
DK | 06.05.2020 | ||
ES | 06.05.2020 | ||
HR | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
RO | 06.05.2020 | ||
RS | 06.05.2020 | ||
SM | 06.05.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2021/04] | AL | 06.05.2020 | |
HR | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
RS | 06.05.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2021/01] | HR | 06.05.2020 | |
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
RS | 06.05.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2020/51] | HR | 06.05.2020 | |
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
RS | 06.05.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2020/50] | HR | 06.05.2020 | |
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2020/49] | LT | 06.05.2020 | |
NO | 06.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2020/47] | LT | 06.05.2020 | |
NO | 06.08.2020 | ||
IS | 06.09.2020 | ||
Former [2020/46] | IS | 06.09.2020 | Documents cited: | Search | [X] - "3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Architecture Enhancements for Dedicated Core Networks; Stage 2 (Release 13)", 3GPP STANDARD; 3GPP TR 23.707, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20141216), vol. SA WG2, no. V13.0.0, pages 1 - 39, XP050926977 [X] 1-15 * section 5.2.1.1.1.2.1; page 9; figures 5.2.1.1.1.2.1-1, 5.2.1.1.1.2.1-2 * | International search | [A]US2012327947 (CAI YIGANG [US], et al) [A] 1-15* See paragraphs [0006]-[0008]; and figure 3. *; | [X] - 3GPP; et al., "Architecture Enhancements for Dedicated Core Networks; Stage 2 (Release 13", 3GPP TR 23.707 V13.0.0, (20141217), XP050926977 [X] 1-15 * See section 5.2.1.1.1.2.1; and figures 5.2.1.1.1.2.1-1 - 5.2.1.1.1.2.1-2. * | [A] - ERICSSON, "Evaluation of DECOR solutions", 3GPP TSG-SA WG2 #106, San Francisco, California, USA, (20141111), XP050895659 [A] 1-15 * See section 5.2.1.1.1.2.5.X. * | [A] - NEC, "Update to MMEGI/NRI for dedicated networks re-selection solution", S 2-144068 , 3GPP TSG-SA WG2 #106, San Francisco, California, USA, (20141111), XP050891814 [A] 1-15 * See section 3; and figure 5.2.2.1.2.5-1. * | [A] - INTEL, "Resolving Editor's Notes for MME triggered re-direction to dedicated MME solution", S 2-144156 , 3GPP TSG-SA WG2 #106, San Francisco, California, USA, (20141111), XP050891880 [A] 1-15 * See section 2; and figure 5.2.1.1.1.2.5-1. * | Examination | US2016050601 |