EP3266407 - POWDER MIXED GAS GENERATOR [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.04.2021 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 24.04.2020 | ||
Former | Grant of patent is intended Status updated on 07.01.2020 | ||
Former | Examination is in progress Status updated on 08.04.2019 | ||
Former | Request for examination was made Status updated on 08.12.2017 | ||
Former | The international publication has been made Status updated on 05.09.2017 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Nakanishi Inc. 700 Shimohinata Kanuma-shi, Tochigi 322-8666 / JP | [2018/02] | Inventor(s) | 01 /
TAKAMORI, Shoichi c/o NAKANISHI INC. 700 Shimohinata Kanuma-shi Tochigi 322-8666 / JP | [2018/02] | Representative(s) | Strobel, Wolfgang, et al Kroher-Strobel Rechts- und Patentanwälte PartmbB Bavariaring 20 80336 München / DE | [2018/02] | Application number, filing date | 16761585.5 | 02.03.2016 | [2018/02] | WO2016JP56320 | Priority number, date | JP20150044943 | 06.03.2015 Original published format: JP 2015044943 | [2018/02] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016143615 | Date: | 15.09.2016 | Language: | JA | [2016/37] | Type: | A1 Application with search report | No.: | EP3266407 | Date: | 10.01.2018 | Language: | EN | [2018/02] | Type: | B1 Patent specification | No.: | EP3266407 | Date: | 27.05.2020 | Language: | EN | [2020/22] | Search report(s) | International search report - published on: | JP | 15.09.2016 | (Supplementary) European search report - dispatched on: | EP | 06.07.2018 | Classification | IPC: | A61C3/025, A61C17/02, B24C7/00, B65G53/00, B65G65/40 | [2018/02] | CPC: |
A61C3/025 (EP,US);
B24C7/00 (EP,US);
B65G53/00 (EP,US);
B65G65/40 (EP,US);
A61C3/03 (EP,US);
B65G53/16 (US);
B65G53/36 (US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/02] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | PULVERMISCHGASGENERATOR | [2018/02] | English: | POWDER MIXED GAS GENERATOR | [2018/02] | French: | GÉNÉRATEUR DE GAZ MÉLANGÉ À DE LA POUDRE | [2018/02] | Entry into regional phase | 05.09.2017 | Translation filed | 05.09.2017 | National basic fee paid | 05.09.2017 | Search fee paid | 05.09.2017 | Designation fee(s) paid | 05.09.2017 | Examination fee paid | Examination procedure | 05.09.2017 | Examination requested [2018/02] | 05.09.2017 | Date on which the examining division has become responsible | 24.01.2019 | Amendment by applicant (claims and/or description) | 11.04.2019 | Despatch of a communication from the examining division (Time limit: M04) | 31.07.2019 | Reply to a communication from the examining division | 08.01.2020 | Communication of intention to grant the patent | 16.04.2020 | Fee for grant paid | 16.04.2020 | Fee for publishing/printing paid | 16.04.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 02.03.2021 | No opposition filed within time limit [2021/18] | Fees paid | Renewal fee | 28.03.2018 | Renewal fee patent year 03 | 29.03.2019 | Renewal fee patent year 04 | 27.02.2020 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 02.03.2016 | AL | 27.05.2020 | AT | 27.05.2020 | CY | 27.05.2020 | CZ | 27.05.2020 | DK | 27.05.2020 | EE | 27.05.2020 | ES | 27.05.2020 | FI | 27.05.2020 | HR | 27.05.2020 | IT | 27.05.2020 | LT | 27.05.2020 | LV | 27.05.2020 | MC | 27.05.2020 | MK | 27.05.2020 | MT | 27.05.2020 | NL | 27.05.2020 | PL | 27.05.2020 | RO | 27.05.2020 | RS | 27.05.2020 | SE | 27.05.2020 | SI | 27.05.2020 | SK | 27.05.2020 | SM | 27.05.2020 | BG | 27.08.2020 | NO | 27.08.2020 | GR | 28.08.2020 | IS | 27.09.2020 | PT | 28.09.2020 | [2024/42] |
Former [2024/22] | HU | 02.03.2016 | |
AL | 27.05.2020 | ||
AT | 27.05.2020 | ||
CY | 27.05.2020 | ||
CZ | 27.05.2020 | ||
DK | 27.05.2020 | ||
EE | 27.05.2020 | ||
ES | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
IT | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
MC | 27.05.2020 | ||
MK | 27.05.2020 | ||
NL | 27.05.2020 | ||
PL | 27.05.2020 | ||
RO | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
SI | 27.05.2020 | ||
SK | 27.05.2020 | ||
SM | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2023/33] | HU | 02.03.2016 | |
AL | 27.05.2020 | ||
AT | 27.05.2020 | ||
CY | 27.05.2020 | ||
CZ | 27.05.2020 | ||
DK | 27.05.2020 | ||
EE | 27.05.2020 | ||
ES | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
IT | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
MC | 27.05.2020 | ||
NL | 27.05.2020 | ||
PL | 27.05.2020 | ||
RO | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
SI | 27.05.2020 | ||
SK | 27.05.2020 | ||
SM | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2023/30] | AL | 27.05.2020 | |
AT | 27.05.2020 | ||
CY | 27.05.2020 | ||
CZ | 27.05.2020 | ||
DK | 27.05.2020 | ||
EE | 27.05.2020 | ||
ES | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
IT | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
MC | 27.05.2020 | ||
NL | 27.05.2020 | ||
PL | 27.05.2020 | ||
RO | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
SI | 27.05.2020 | ||
SK | 27.05.2020 | ||
SM | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2021/45] | AL | 27.05.2020 | |
AT | 27.05.2020 | ||
CZ | 27.05.2020 | ||
DK | 27.05.2020 | ||
EE | 27.05.2020 | ||
ES | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
IT | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
MC | 27.05.2020 | ||
NL | 27.05.2020 | ||
PL | 27.05.2020 | ||
RO | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
SI | 27.05.2020 | ||
SK | 27.05.2020 | ||
SM | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2021/24] | AL | 27.05.2020 | |
AT | 27.05.2020 | ||
CZ | 27.05.2020 | ||
DK | 27.05.2020 | ||
EE | 27.05.2020 | ||
ES | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
IT | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
NL | 27.05.2020 | ||
PL | 27.05.2020 | ||
RO | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
SI | 27.05.2020 | ||
SK | 27.05.2020 | ||
SM | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2021/10] | AL | 27.05.2020 | |
AT | 27.05.2020 | ||
CZ | 27.05.2020 | ||
DK | 27.05.2020 | ||
EE | 27.05.2020 | ||
ES | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
IT | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
NL | 27.05.2020 | ||
PL | 27.05.2020 | ||
RO | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
SK | 27.05.2020 | ||
SM | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2021/09] | AL | 27.05.2020 | |
AT | 27.05.2020 | ||
CZ | 27.05.2020 | ||
DK | 27.05.2020 | ||
EE | 27.05.2020 | ||
ES | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
IT | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
NL | 27.05.2020 | ||
RO | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
SM | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2021/08] | AL | 27.05.2020 | |
DK | 27.05.2020 | ||
ES | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
NL | 27.05.2020 | ||
RO | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
SM | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2021/04] | AL | 27.05.2020 | |
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
NL | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2021/01] | FI | 27.05.2020 | |
HR | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2020/51] | FI | 27.05.2020 | |
HR | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
RS | 27.05.2020 | ||
SE | 27.05.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2020/50] | FI | 27.05.2020 | |
HR | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
SE | 27.05.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2020/48] | FI | 27.05.2020 | |
LT | 27.05.2020 | ||
SE | 27.05.2020 | ||
NO | 27.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2020/47] | LT | 27.05.2020 | |
NO | 27.08.2020 | ||
IS | 27.09.2020 | ||
Former [2020/46] | IS | 27.09.2020 | Documents cited: | Search | [X]US2009246730 (TAKAMORI SHOICHI [JP], et al) [X] 1-7 * page 1 - page 5; figures 1-3 *; | [XA]EP1145689 (NAKANISHI INC [JP]) [X] 1-4,7 * paragraph [0027] - paragraph [0047]; figures 1-3 * [A] 5,6; | [XA]EP1346700 (FERTON HOLDING SA [CH]) [X] 1-4,7 * paragraph [0006] - paragraph [0009]; figures 1-3; claim 1 * [A] 5,6 | International search | [XA]JP2009066169 (NAKANISHI & CO LTD) [X] 3 * , paragraphs [0011] to [0029]; fig. 1 to 5 & US 2009/0246730 A1 paragraphs [0031] to [0066]; fig. 1 to 5 & EP 2036513 A1 & CN 101385886 A * [A] 1-2, 4; | [A]US2012329005 (OLMO OLIVIER [CH], et al) [A] 1-4 * , paragraphs [0003] to [0031]; fig. 1 to 4 & EP 2537484 A1 & DE 102011077995 A1 *; | [A]JP2004509697 (Sandman ApS) [A] 1-4 * , entire text; all drawings & US 2003/0219695 A1 entire text; all drawings & WO 2002/026156 A1 & CN 1466442 A & CA 2463184 A1 *; | [A]JPH04171178 (SONY CORP) [A] 1-4 * , entire text; all drawings (Family: none) * | Examination | DE3538324 | EP1745747 | KR20100008362U |