| EP3270098 - MEASUREMENT SYSTEM FOR EYEGLASSES-WEARING PARAMETER, MEASUREMENT PROGRAM, MEASUREMENT METHOD THEREFOR, AND MANUFACTURING METHOD FOR EYEGLASSES LENS [Right-click to bookmark this link] | Status | Patent maintained as amended Status updated on 04.11.2022 Database last updated on 19.03.2026 | |
| Former | The patent has been granted Status updated on 16.08.2019 | ||
| Former | Grant of patent is intended Status updated on 10.04.2019 | ||
| Former | Request for examination was made Status updated on 15.12.2017 | ||
| Former | The international publication has been made Status updated on 02.08.2017 | Most recent event Tooltip | 04.11.2022 | Patent maintained (B2 publication) | published on 07.12.2022 [2022/49] | Applicant(s) | For all designated states Hoya Lens Thailand Ltd. 853 Phaholyothin Road Prachatipat Thanyaburi Pathumthani 12130 / TH | [2018/03] | Inventor(s) | 01 /
TADOKORO Nobuyuki C/O HOYA CORPORATION 7-5 Nakaochiai 2-chome Shinjuku-ku Tokyo 161-8525 / JP | 02 /
HIRONO Naoya C/O HOYA CORPORATION 7-5 Nakaochiai 2-chome Shinjuku-ku Tokyo 161-8525 / JP | 03 /
MATSUSHIMA Masaaki C/O HOYA CORPORATION 7-5 Nakaochiai 2-chome Shinjuku-ku Tokyo 161-8525 / JP | [2018/03] | Representative(s) | Betten & Resch Patent- und Rechtsanwälte PartGmbB Maximiliansplatz 14 80333 München / DE | [2018/03] | Application number, filing date | 16761827.1 | 10.03.2016 | [2018/03] | WO2016JP57608 | Priority number, date | JP20150047759 | 10.03.2015 Original published format: JP 2015047759 | [2018/03] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016143861 | Date: | 15.09.2016 | Language: | JA | [2016/37] | Type: | A1 Application with search report | No.: | EP3270098 | Date: | 17.01.2018 | Language: | EN | [2018/03] | Type: | B1 Patent specification | No.: | EP3270098 | Date: | 18.09.2019 | Language: | EN | [2019/38] | Type: | B2 New European patent specification | No.: | EP3270098 | Date: | 07.12.2022 | Language: | EN | [2022/49] | Search report(s) | International search report - published on: | JP | 15.09.2016 | (Supplementary) European search report - dispatched on: | EP | 19.07.2018 | Classification | IPC: | G01B11/02, G01B11/00, G01B11/26, G02C7/02, G02C13/00 | [2018/03] | CPC: |
G01B11/02 (EP,KR,US);
G02C13/005 (US);
G01B11/14 (US);
G01B11/26 (KR);
G02C13/00 (EP,KR,US);
G02C7/02 (EP,KR,US);
G06F3/04847 (US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/03] | Title | German: | SYSTEM ZUR MESSUNG DER PARAMETER EINES BRILLENGESTELLS, MESSPROGRAMM, MESSVERFAHREN DAFÜR UND VERFAHREN ZUR HERSTELLUNG VON BRILLENGLÄSERN | [2019/17] | English: | MEASUREMENT SYSTEM FOR EYEGLASSES-WEARING PARAMETER, MEASUREMENT PROGRAM, MEASUREMENT METHOD THEREFOR, AND MANUFACTURING METHOD FOR EYEGLASSES LENS | [2018/03] | French: | SYSTEME DE MESURE D'UN PARAMETRE DE PORT DE LUNETTES, PROGRAMME DE MESURE, PROCEDE DE MESURE CORRESPONDANT ET PROCEDE DE FABRICATION DE VERRE DE LUNETTES | [2019/17] |
| Former [2018/03] | SYSTEM ZUR MESSUNG DER PARAMETER EINES BRILLENTRÄGERS, MESSPROGRAMM, MESSVERFAHREN DAFÜR UND VERFAHREN ZUR HERSTELLUNG VON BRILLENGLÄSERN | ||
| Former [2018/03] | SYSTÈME DE MESURE DE PARAMÈTRE DE PORT DE LUNETTES, PROGRAMME DE MESURE, SON PROCÉDÉ DE MESURE, ET PROCÉDÉ DE FABRICATION DE VERRE DE LUNETTES | Entry into regional phase | 02.08.2017 | Translation filed | 10.10.2017 | National basic fee paid | 10.10.2017 | Search fee paid | 10.10.2017 | Designation fee(s) paid | 10.10.2017 | Examination fee paid | Examination procedure | 02.08.2017 | Date on which the examining division has become responsible | 10.10.2017 | Examination requested [2018/03] | 20.12.2018 | Amendment by applicant (claims and/or description) | 11.04.2019 | Communication of intention to grant the patent | 06.08.2019 | Fee for grant paid | 06.08.2019 | Fee for publishing/printing paid | 06.08.2019 | Receipt of the translation of the claim(s) | Opposition(s) | Opponent(s) | 01
15.06.2020
22.06.2020
ADMISSIBLE Essilor International 147 rue de Paris 94220 Charenton / FR Opponent's representative Plasseraud IP 104 Rue de Richelieu CS92104 75080 Paris Cedex 02 / FR | [N/P] |
| Former [2020/31] | |||
| Opponent(s) | 01
15.06.2020
22.06.2020
ADMISSIBLE Essilor International 147 rue de Paris 94220 Charenton / FR Opponent's representative Plasseraud IP 66, rue de la Chaussée d'Antin 75440 Paris Cedex 09 / FR | ||
| Former [2020/30] | |||
| Opponent(s) | 01
15.06.2020
Essilor International 147 rue de Paris 94220 Charenton / FR | 28.08.2020 | Invitation to proprietor to file observations on the notice of opposition | 23.12.2020 | Reply of patent proprietor to notice(s) of opposition | 29.04.2022 | Legal effect of interlocutory decision in opposition | 29.04.2022 | Date of oral proceedings | 09.06.2022 | Despatch of interlocutory decision in opposition | 09.06.2022 | Despatch of minutes of oral proceedings | 27.09.2022 | Despatch of communication that the patent will be maintained as amended | 27.10.2022 | Fee for printing new specification paid | Fees paid | Renewal fee | 03.04.2018 | Renewal fee patent year 03 | 01.04.2019 | Renewal fee patent year 04 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 10.03.2016 | AL | 18.09.2019 | AT | 18.09.2019 | CY | 18.09.2019 | CZ | 18.09.2019 | DK | 18.09.2019 | EE | 18.09.2019 | ES | 18.09.2019 | FI | 18.09.2019 | HR | 18.09.2019 | IT | 18.09.2019 | LT | 18.09.2019 | LV | 18.09.2019 | MC | 18.09.2019 | MK | 18.09.2019 | MT | 18.09.2019 | NL | 18.09.2019 | PL | 18.09.2019 | RO | 18.09.2019 | RS | 18.09.2019 | SE | 18.09.2019 | SI | 18.09.2019 | SK | 18.09.2019 | SM | 18.09.2019 | TR | 18.09.2019 | BG | 18.12.2019 | NO | 18.12.2019 | GR | 19.12.2019 | IS | 19.01.2020 | PT | 20.01.2020 | IE | 10.03.2020 | LU | 10.03.2020 | BE | 31.03.2020 | CH | 31.03.2020 | LI | 31.03.2020 | [2022/32] |
| Former [2022/27] | HU | 10.03.2016 | |
| AL | 18.09.2019 | ||
| AT | 18.09.2019 | ||
| CY | 18.09.2019 | ||
| CZ | 18.09.2019 | ||
| DK | 18.09.2019 | ||
| EE | 18.09.2019 | ||
| ES | 18.09.2019 | ||
| FI | 18.09.2019 | ||
| HR | 18.09.2019 | ||
| IT | 18.09.2019 | ||
| LT | 18.09.2019 | ||
| LV | 18.09.2019 | ||
| MC | 18.09.2019 | ||
| MT | 18.09.2019 | ||
| NL | 18.09.2019 | ||
| PL | 18.09.2019 | ||
| RO | 18.09.2019 | ||
| RS | 18.09.2019 | ||
| SE | 18.09.2019 | ||
| SI | 18.09.2019 | ||
| SK | 18.09.2019 | ||
| SM | 18.09.2019 | ||
| TR | 18.09.2019 | ||
| BG | 18.12.2019 | ||
| NO | 18.12.2019 | ||
| GR | 19.12.2019 | ||
| IS | 19.01.2020 | ||
| PT | 20.01.2020 | ||
| IE | 10.03.2020 | ||
| LU | 10.03.2020 | ||
| BE | 31.03.2020 | ||
| CH | 31.03.2020 | ||
| LI | 31.03.2020 | ||
| Former [2021/13] | AL | 18.09.2019 | |
| AT | 18.09.2019 | ||
| CZ | 18.09.2019 | ||
| DK | 18.09.2019 | ||
| EE | 18.09.2019 | ||
| ES | 18.09.2019 | ||
| FI | 18.09.2019 | ||
| HR | 18.09.2019 | ||
| IT | 18.09.2019 | ||
| LT | 18.09.2019 | ||
| LV | 18.09.2019 | ||
| MC | 18.09.2019 | ||
| NL | 18.09.2019 | ||
| PL | 18.09.2019 | ||
| RO | 18.09.2019 | ||
| RS | 18.09.2019 | ||
| SE | 18.09.2019 | ||
| SI | 18.09.2019 | ||
| SK | 18.09.2019 | ||
| SM | 18.09.2019 | ||
| BG | 18.12.2019 | ||
| NO | 18.12.2019 | ||
| GR | 19.12.2019 | ||
| IS | 19.01.2020 | ||
| PT | 20.01.2020 | ||
| IE | 10.03.2020 | ||
| LU | 10.03.2020 | ||
| BE | 31.03.2020 | ||
| CH | 31.03.2020 | ||
| LI | 31.03.2020 | ||
| Former [2021/08] | AL | 18.09.2019 | |
| AT | 18.09.2019 | ||
| CZ | 18.09.2019 | ||
| DK | 18.09.2019 | ||
| EE | 18.09.2019 | ||
| ES | 18.09.2019 | ||
| FI | 18.09.2019 | ||
| HR | 18.09.2019 | ||
| IT | 18.09.2019 | ||
| LT | 18.09.2019 | ||
| LV | 18.09.2019 | ||
| MC | 18.09.2019 | ||
| NL | 18.09.2019 | ||
| PL | 18.09.2019 | ||
| RO | 18.09.2019 | ||
| RS | 18.09.2019 | ||
| SE | 18.09.2019 | ||
| SI | 18.09.2019 | ||
| SK | 18.09.2019 | ||
| SM | 18.09.2019 | ||
| BG | 18.12.2019 | ||
| NO | 18.12.2019 | ||
| GR | 19.12.2019 | ||
| IS | 19.01.2020 | ||
| PT | 20.01.2020 | ||
| IE | 10.03.2020 | ||
| LU | 10.03.2020 | ||
| CH | 31.03.2020 | ||
| LI | 31.03.2020 | ||
| Former [2021/04] | AL | 18.09.2019 | |
| AT | 18.09.2019 | ||
| CZ | 18.09.2019 | ||
| DK | 18.09.2019 | ||
| EE | 18.09.2019 | ||
| ES | 18.09.2019 | ||
| FI | 18.09.2019 | ||
| HR | 18.09.2019 | ||
| IT | 18.09.2019 | ||
| LT | 18.09.2019 | ||
| LV | 18.09.2019 | ||
| MC | 18.09.2019 | ||
| NL | 18.09.2019 | ||
| PL | 18.09.2019 | ||
| RO | 18.09.2019 | ||
| RS | 18.09.2019 | ||
| SE | 18.09.2019 | ||
| SI | 18.09.2019 | ||
| SK | 18.09.2019 | ||
| SM | 18.09.2019 | ||
| BG | 18.12.2019 | ||
| NO | 18.12.2019 | ||
| GR | 19.12.2019 | ||
| IS | 19.01.2020 | ||
| PT | 20.01.2020 | ||
| LU | 10.03.2020 | ||
| Former [2020/50] | AL | 18.09.2019 | |
| AT | 18.09.2019 | ||
| CZ | 18.09.2019 | ||
| DK | 18.09.2019 | ||
| EE | 18.09.2019 | ||
| ES | 18.09.2019 | ||
| FI | 18.09.2019 | ||
| HR | 18.09.2019 | ||
| IT | 18.09.2019 | ||
| LT | 18.09.2019 | ||
| LV | 18.09.2019 | ||
| MC | 18.09.2019 | ||
| NL | 18.09.2019 | ||
| PL | 18.09.2019 | ||
| RO | 18.09.2019 | ||
| RS | 18.09.2019 | ||
| SE | 18.09.2019 | ||
| SI | 18.09.2019 | ||
| SK | 18.09.2019 | ||
| SM | 18.09.2019 | ||
| BG | 18.12.2019 | ||
| NO | 18.12.2019 | ||
| GR | 19.12.2019 | ||
| IS | 19.01.2020 | ||
| PT | 20.01.2020 | ||
| Former [2020/37] | AL | 18.09.2019 | |
| AT | 18.09.2019 | ||
| CZ | 18.09.2019 | ||
| DK | 18.09.2019 | ||
| EE | 18.09.2019 | ||
| ES | 18.09.2019 | ||
| FI | 18.09.2019 | ||
| HR | 18.09.2019 | ||
| IT | 18.09.2019 | ||
| LT | 18.09.2019 | ||
| LV | 18.09.2019 | ||
| NL | 18.09.2019 | ||
| PL | 18.09.2019 | ||
| RO | 18.09.2019 | ||
| RS | 18.09.2019 | ||
| SE | 18.09.2019 | ||
| SI | 18.09.2019 | ||
| SK | 18.09.2019 | ||
| SM | 18.09.2019 | ||
| BG | 18.12.2019 | ||
| NO | 18.12.2019 | ||
| GR | 19.12.2019 | ||
| IS | 19.01.2020 | ||
| PT | 20.01.2020 | ||
| Former [2020/36] | AL | 18.09.2019 | |
| AT | 18.09.2019 | ||
| CZ | 18.09.2019 | ||
| DK | 18.09.2019 | ||
| EE | 18.09.2019 | ||
| ES | 18.09.2019 | ||
| FI | 18.09.2019 | ||
| HR | 18.09.2019 | ||
| IT | 18.09.2019 | ||
| LT | 18.09.2019 | ||
| LV | 18.09.2019 | ||
| NL | 18.09.2019 | ||
| PL | 18.09.2019 | ||
| RO | 18.09.2019 | ||
| RS | 18.09.2019 | ||
| SE | 18.09.2019 | ||
| SK | 18.09.2019 | ||
| SM | 18.09.2019 | ||
| BG | 18.12.2019 | ||
| NO | 18.12.2019 | ||
| GR | 19.12.2019 | ||
| IS | 19.01.2020 | ||
| PT | 20.01.2020 | ||
| Former [2020/27] | AL | 18.09.2019 | |
| AT | 18.09.2019 | ||
| CZ | 18.09.2019 | ||
| EE | 18.09.2019 | ||
| ES | 18.09.2019 | ||
| FI | 18.09.2019 | ||
| HR | 18.09.2019 | ||
| IT | 18.09.2019 | ||
| LT | 18.09.2019 | ||
| LV | 18.09.2019 | ||
| NL | 18.09.2019 | ||
| PL | 18.09.2019 | ||
| RO | 18.09.2019 | ||
| RS | 18.09.2019 | ||
| SE | 18.09.2019 | ||
| SK | 18.09.2019 | ||
| SM | 18.09.2019 | ||
| BG | 18.12.2019 | ||
| NO | 18.12.2019 | ||
| GR | 19.12.2019 | ||
| PT | 20.01.2020 | ||
| IS | 24.02.2020 | ||
| Former [2020/25] | AL | 18.09.2019 | |
| AT | 18.09.2019 | ||
| CZ | 18.09.2019 | ||
| EE | 18.09.2019 | ||
| ES | 18.09.2019 | ||
| FI | 18.09.2019 | ||
| HR | 18.09.2019 | ||
| IT | 18.09.2019 | ||
| LT | 18.09.2019 | ||
| LV | 18.09.2019 | ||
| NL | 18.09.2019 | ||
| PL | 18.09.2019 | ||
| RO | 18.09.2019 | ||
| RS | 18.09.2019 | ||
| SE | 18.09.2019 | ||
| SK | 18.09.2019 | ||
| BG | 18.12.2019 | ||
| NO | 18.12.2019 | ||
| GR | 19.12.2019 | ||
| PT | 20.01.2020 | ||
| IS | 24.02.2020 | ||
| Former [2020/24] | AL | 18.09.2019 | |
| AT | 18.09.2019 | ||
| EE | 18.09.2019 | ||
| ES | 18.09.2019 | ||
| FI | 18.09.2019 | ||
| HR | 18.09.2019 | ||
| IT | 18.09.2019 | ||
| LT | 18.09.2019 | ||
| LV | 18.09.2019 | ||
| NL | 18.09.2019 | ||
| PL | 18.09.2019 | ||
| RO | 18.09.2019 | ||
| RS | 18.09.2019 | ||
| SE | 18.09.2019 | ||
| BG | 18.12.2019 | ||
| NO | 18.12.2019 | ||
| GR | 19.12.2019 | ||
| PT | 20.01.2020 | ||
| IS | 24.02.2020 | ||
| Former [2020/23] | AL | 18.09.2019 | |
| AT | 18.09.2019 | ||
| EE | 18.09.2019 | ||
| ES | 18.09.2019 | ||
| FI | 18.09.2019 | ||
| HR | 18.09.2019 | ||
| IT | 18.09.2019 | ||
| LT | 18.09.2019 | ||
| LV | 18.09.2019 | ||
| NL | 18.09.2019 | ||
| PL | 18.09.2019 | ||
| RO | 18.09.2019 | ||
| RS | 18.09.2019 | ||
| SE | 18.09.2019 | ||
| BG | 18.12.2019 | ||
| NO | 18.12.2019 | ||
| GR | 19.12.2019 | ||
| PT | 20.01.2020 | ||
| Former [2020/22] | AL | 18.09.2019 | |
| EE | 18.09.2019 | ||
| FI | 18.09.2019 | ||
| HR | 18.09.2019 | ||
| LT | 18.09.2019 | ||
| LV | 18.09.2019 | ||
| NL | 18.09.2019 | ||
| RS | 18.09.2019 | ||
| SE | 18.09.2019 | ||
| BG | 18.12.2019 | ||
| NO | 18.12.2019 | ||
| GR | 19.12.2019 | ||
| PT | 20.01.2020 | ||
| Former [2020/20] | AL | 18.09.2019 | |
| FI | 18.09.2019 | ||
| HR | 18.09.2019 | ||
| LT | 18.09.2019 | ||
| LV | 18.09.2019 | ||
| NL | 18.09.2019 | ||
| RS | 18.09.2019 | ||
| SE | 18.09.2019 | ||
| BG | 18.12.2019 | ||
| NO | 18.12.2019 | ||
| GR | 19.12.2019 | ||
| Former [2020/15] | AL | 18.09.2019 | |
| FI | 18.09.2019 | ||
| HR | 18.09.2019 | ||
| LT | 18.09.2019 | ||
| LV | 18.09.2019 | ||
| RS | 18.09.2019 | ||
| SE | 18.09.2019 | ||
| BG | 18.12.2019 | ||
| NO | 18.12.2019 | ||
| GR | 19.12.2019 | ||
| Former [2020/12] | FI | 18.09.2019 | |
| HR | 18.09.2019 | ||
| LT | 18.09.2019 | ||
| LV | 18.09.2019 | ||
| RS | 18.09.2019 | ||
| SE | 18.09.2019 | ||
| BG | 18.12.2019 | ||
| NO | 18.12.2019 | ||
| GR | 19.12.2019 | ||
| Former [2020/10] | FI | 18.09.2019 | |
| LT | 18.09.2019 | ||
| SE | 18.09.2019 | ||
| BG | 18.12.2019 | ||
| NO | 18.12.2019 | ||
| Former [2020/09] | FI | 18.09.2019 | |
| LT | 18.09.2019 | ||
| NO | 18.12.2019 | ||
| Former [2020/08] | LT | 18.09.2019 | |
| NO | 18.12.2019 | Documents cited: | Search | [XAY] WO2014195623 (ESSILOR INT et al.) | [Y] US2014009737 (KWEON HYUK JE et al.) | [A] EP1714184 (ESSILOR INT et al.) | International search | [XY] JP2007216049 (NIDEK KK et al.) [X] 1-4, 9-11 * , paragraphs [0012], [0021] to [0029], [0046] to [0049]; fig. 1 to 7 (Family: none) *[Y] 5-8, 12-14 | [Y] JPH0618250 (SHARP KK et al.) [Y] 5-8, 12, 13 * , claims 2, 8, 15; paragraph [0108]; fig. 2 & US 5410494 A claims; column 18, lines 26 to 41 & EP 565348 A2 & DE 69319168 T2 * | [Y] JP2011227173 (SEIKO EPSON CORP et al.) [Y] 14 * , paragraph [0004] & US 2011/0258071 A1 paragraph [0007] & CN 102221750 A * | [A] JP2000241118 (NIDEK KK et al.) [A] 1-14 * , entire text; all drawings & US 6257721 B1 & EP 1038495 A2 & DE 60030019 T2 * | [A] JP2005103039 (PENTAX CORP et al.) [A] 1-14 * , entire text; all drawings & US 2005/0068495 A1 & KR 10-2005-0031978 A * | [A] JPH09145324 (TOPCON CORP et al.) [A] 1-14 * , entire text; all drawings (Family: none) * | Opposition | WO2014195623 | US2014009737 | EP3090306 | EP2761366 | JP2014112153 | WO2015027196 | CN101470548 | US2011115730 | JP2014112153 | EP3090306 | EP2761366 | JPS6030425 | WO2015027196 | CN101470548 | US2011115730 |