EP3344359 - FILTRATION DEVICE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 02.10.2020 Database last updated on 13.07.2024 | |
Former | The patent has been granted Status updated on 25.10.2019 | ||
Former | Grant of patent is intended Status updated on 17.04.2019 | ||
Former | Request for examination was made Status updated on 08.04.2019 | ||
Former | Grant of patent is intended Status updated on 04.02.2019 | ||
Former | Request for examination was made Status updated on 08.06.2018 | ||
Former | The international publication has been made Status updated on 11.03.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Ngachi Limited Charles House Front Suite 1st Floor 148-149 Great Charles Street Queensway Birmingham, West Midlands B3 3HT / GB | [2019/09] |
Former [2018/28] | For all designated states Ngachi Limited Avebury House Second Floor Newhall Street Birmingham, West Midlands B3 3RB / GB | Inventor(s) | 01 /
YIP, Nga Chi Lydia 2J Greenfield Road Harborne Central Harborne Birmingham West Midlands B17 0ES / GB | [2018/28] | Representative(s) | HGF HGF Limited 1 City Walk Leeds LS11 9DX / GB | [N/P] |
Former [2018/28] | HGF Limited Cavendish House 39-41 Waterloo Street Birmingham, West Midlands B2 5PP / GB | Application number, filing date | 16762848.6 | 01.09.2016 | [2018/28] | WO2016GB52706 | Priority number, date | GB20150015531 | 02.09.2015 Original published format: GB 201515531 | [2018/28] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017037461 | Date: | 09.03.2017 | Language: | EN | [2017/10] | Type: | A1 Application with search report | No.: | EP3344359 | Date: | 11.07.2018 | Language: | EN | The application published by WIPO in one of the EPO official languages on 09.03.2017 takes the place of the publication of the European patent application. | [2018/28] | Type: | B1 Patent specification | No.: | EP3344359 | Date: | 27.11.2019 | Language: | EN | [2019/48] | Search report(s) | International search report - published on: | EP | 09.03.2017 | Classification | IPC: | B01D33/01 | [2018/28] | CPC: |
G01N33/49 (EP);
B01L2200/0631 (EP);
B01L2300/0681 (EP);
B01L2300/0832 (EP);
B01L2300/087 (EP);
B01L2400/0478 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/28] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | FILTRIERUNGSVORRICHTUNG | [2018/28] | English: | FILTRATION DEVICE | [2018/28] | French: | DISPOSITIF DE FILTRATION | [2018/28] | Entry into regional phase | 14.02.2018 | National basic fee paid | 14.02.2018 | Designation fee(s) paid | 14.02.2018 | Examination fee paid | Examination procedure | 14.02.2018 | Examination requested [2018/28] | 14.02.2018 | Date on which the examining division has become responsible | 02.05.2018 | Amendment by applicant (claims and/or description) | 05.02.2019 | Communication of intention to grant the patent | 05.04.2019 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 18.04.2019 | Communication of intention to grant the patent | 26.07.2019 | Fee for grant paid | 26.07.2019 | Fee for publishing/printing paid | 26.07.2019 | Receipt of the translation of the claim(s) | Opposition(s) | 28.08.2020 | No opposition filed within time limit [2020/45] | Fees paid | Renewal fee | 30.08.2018 | Renewal fee patent year 03 | 04.09.2019 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 01.09.2016 | AL | 27.11.2019 | AT | 27.11.2019 | CY | 27.11.2019 | CZ | 27.11.2019 | DK | 27.11.2019 | EE | 27.11.2019 | ES | 27.11.2019 | FI | 27.11.2019 | HR | 27.11.2019 | IT | 27.11.2019 | LT | 27.11.2019 | LV | 27.11.2019 | MC | 27.11.2019 | MK | 27.11.2019 | MT | 27.11.2019 | NL | 27.11.2019 | PL | 27.11.2019 | RO | 27.11.2019 | RS | 27.11.2019 | SE | 27.11.2019 | SI | 27.11.2019 | SK | 27.11.2019 | SM | 27.11.2019 | TR | 27.11.2019 | BG | 27.02.2020 | NO | 27.02.2020 | GR | 28.02.2020 | IS | 27.03.2020 | PT | 19.04.2020 | [2022/32] |
Former [2022/28] | HU | 01.09.2016 | |
AL | 27.11.2019 | ||
AT | 27.11.2019 | ||
CY | 27.11.2019 | ||
CZ | 27.11.2019 | ||
DK | 27.11.2019 | ||
EE | 27.11.2019 | ||
ES | 27.11.2019 | ||
FI | 27.11.2019 | ||
HR | 27.11.2019 | ||
IT | 27.11.2019 | ||
LT | 27.11.2019 | ||
LV | 27.11.2019 | ||
MC | 27.11.2019 | ||
MT | 27.11.2019 | ||
NL | 27.11.2019 | ||
PL | 27.11.2019 | ||
RO | 27.11.2019 | ||
RS | 27.11.2019 | ||
SE | 27.11.2019 | ||
SI | 27.11.2019 | ||
SK | 27.11.2019 | ||
SM | 27.11.2019 | ||
TR | 27.11.2019 | ||
BG | 27.02.2020 | ||
NO | 27.02.2020 | ||
GR | 28.02.2020 | ||
IS | 27.03.2020 | ||
PT | 19.04.2020 | ||
Former [2022/27] | HU | 01.09.2016 | |
AL | 27.11.2019 | ||
AT | 27.11.2019 | ||
CY | 27.11.2019 | ||
CZ | 27.11.2019 | ||
DK | 27.11.2019 | ||
EE | 27.11.2019 | ||
ES | 27.11.2019 | ||
FI | 27.11.2019 | ||
HR | 27.11.2019 | ||
IT | 27.11.2019 | ||
LT | 27.11.2019 | ||
LV | 27.11.2019 | ||
MT | 27.11.2019 | ||
NL | 27.11.2019 | ||
PL | 27.11.2019 | ||
RO | 27.11.2019 | ||
RS | 27.11.2019 | ||
SE | 27.11.2019 | ||
SI | 27.11.2019 | ||
SK | 27.11.2019 | ||
SM | 27.11.2019 | ||
TR | 27.11.2019 | ||
BG | 27.02.2020 | ||
NO | 27.02.2020 | ||
GR | 28.02.2020 | ||
IS | 27.03.2020 | ||
PT | 19.04.2020 | ||
Former [2021/10] | AL | 27.11.2019 | |
AT | 27.11.2019 | ||
CZ | 27.11.2019 | ||
DK | 27.11.2019 | ||
EE | 27.11.2019 | ||
ES | 27.11.2019 | ||
FI | 27.11.2019 | ||
HR | 27.11.2019 | ||
IT | 27.11.2019 | ||
LT | 27.11.2019 | ||
LV | 27.11.2019 | ||
NL | 27.11.2019 | ||
PL | 27.11.2019 | ||
RO | 27.11.2019 | ||
RS | 27.11.2019 | ||
SE | 27.11.2019 | ||
SI | 27.11.2019 | ||
SK | 27.11.2019 | ||
SM | 27.11.2019 | ||
BG | 27.02.2020 | ||
NO | 27.02.2020 | ||
GR | 28.02.2020 | ||
IS | 27.03.2020 | ||
PT | 19.04.2020 | ||
Former [2020/51] | AL | 27.11.2019 | |
AT | 27.11.2019 | ||
CZ | 27.11.2019 | ||
DK | 27.11.2019 | ||
EE | 27.11.2019 | ||
ES | 27.11.2019 | ||
FI | 27.11.2019 | ||
HR | 27.11.2019 | ||
LT | 27.11.2019 | ||
LV | 27.11.2019 | ||
NL | 27.11.2019 | ||
PL | 27.11.2019 | ||
RO | 27.11.2019 | ||
RS | 27.11.2019 | ||
SE | 27.11.2019 | ||
SI | 27.11.2019 | ||
SK | 27.11.2019 | ||
SM | 27.11.2019 | ||
BG | 27.02.2020 | ||
NO | 27.02.2020 | ||
GR | 28.02.2020 | ||
IS | 27.03.2020 | ||
PT | 19.04.2020 | ||
Former [2020/48] | AL | 27.11.2019 | |
CZ | 27.11.2019 | ||
DK | 27.11.2019 | ||
EE | 27.11.2019 | ||
ES | 27.11.2019 | ||
FI | 27.11.2019 | ||
HR | 27.11.2019 | ||
LT | 27.11.2019 | ||
LV | 27.11.2019 | ||
NL | 27.11.2019 | ||
RO | 27.11.2019 | ||
RS | 27.11.2019 | ||
SE | 27.11.2019 | ||
SK | 27.11.2019 | ||
SM | 27.11.2019 | ||
BG | 27.02.2020 | ||
NO | 27.02.2020 | ||
GR | 28.02.2020 | ||
IS | 27.03.2020 | ||
PT | 19.04.2020 | ||
Former [2020/37] | AL | 27.11.2019 | |
CZ | 27.11.2019 | ||
DK | 27.11.2019 | ||
EE | 27.11.2019 | ||
FI | 27.11.2019 | ||
HR | 27.11.2019 | ||
LT | 27.11.2019 | ||
LV | 27.11.2019 | ||
NL | 27.11.2019 | ||
RO | 27.11.2019 | ||
RS | 27.11.2019 | ||
SE | 27.11.2019 | ||
SK | 27.11.2019 | ||
SM | 27.11.2019 | ||
BG | 27.02.2020 | ||
NO | 27.02.2020 | ||
GR | 28.02.2020 | ||
IS | 27.03.2020 | ||
PT | 19.04.2020 | ||
Former [2020/36] | AL | 27.11.2019 | |
CZ | 27.11.2019 | ||
DK | 27.11.2019 | ||
EE | 27.11.2019 | ||
FI | 27.11.2019 | ||
HR | 27.11.2019 | ||
LT | 27.11.2019 | ||
LV | 27.11.2019 | ||
NL | 27.11.2019 | ||
RO | 27.11.2019 | ||
RS | 27.11.2019 | ||
SE | 27.11.2019 | ||
BG | 27.02.2020 | ||
NO | 27.02.2020 | ||
GR | 28.02.2020 | ||
IS | 27.03.2020 | ||
PT | 19.04.2020 | ||
Former [2020/35] | AL | 27.11.2019 | |
CZ | 27.11.2019 | ||
FI | 27.11.2019 | ||
HR | 27.11.2019 | ||
LT | 27.11.2019 | ||
LV | 27.11.2019 | ||
NL | 27.11.2019 | ||
RO | 27.11.2019 | ||
RS | 27.11.2019 | ||
SE | 27.11.2019 | ||
BG | 27.02.2020 | ||
NO | 27.02.2020 | ||
GR | 28.02.2020 | ||
IS | 27.03.2020 | ||
Former [2020/32] | AL | 27.11.2019 | |
FI | 27.11.2019 | ||
HR | 27.11.2019 | ||
LT | 27.11.2019 | ||
LV | 27.11.2019 | ||
NL | 27.11.2019 | ||
RS | 27.11.2019 | ||
SE | 27.11.2019 | ||
BG | 27.02.2020 | ||
NO | 27.02.2020 | ||
GR | 28.02.2020 | ||
IS | 27.03.2020 | ||
Former [2020/26] | FI | 27.11.2019 | |
HR | 27.11.2019 | ||
LT | 27.11.2019 | ||
LV | 27.11.2019 | ||
NL | 27.11.2019 | ||
RS | 27.11.2019 | ||
SE | 27.11.2019 | ||
BG | 27.02.2020 | ||
NO | 27.02.2020 | ||
GR | 28.02.2020 | ||
IS | 27.03.2020 | ||
Former [2020/24] | FI | 27.11.2019 | |
LT | 27.11.2019 | ||
LV | 27.11.2019 | ||
NL | 27.11.2019 | ||
SE | 27.11.2019 | ||
BG | 27.02.2020 | ||
NO | 27.02.2020 | ||
GR | 28.02.2020 | ||
IS | 27.03.2020 | ||
Former [2020/23] | FI | 27.11.2019 | |
LT | 27.11.2019 | ||
LV | 27.11.2019 | ||
NL | 27.11.2019 | ||
SE | 27.11.2019 | ||
BG | 27.02.2020 | ||
NO | 27.02.2020 | ||
GR | 28.02.2020 | ||
Former [2020/22] | FI | 27.11.2019 | |
LT | 27.11.2019 | ||
SE | 27.11.2019 | ||
BG | 27.02.2020 | ||
NO | 27.02.2020 | ||
Former [2020/21] | NO | 27.02.2020 | Cited in | International search | [XI]GB2329852 (BREBNER GRAHAM COLIN [GB], et al) [X] 1-3,5,8,12-27,30,31,35,37,39-43 * page 2, paragraph 5 - page 6, paragraph 2; figures 1-3; claims 1-5 * [I] 1-43; | [A]US2005123895 (FREUND ROBERT M [US]) [A] 1-43* paragraphs [0059] - [0065]; figures 1-3,28-31 *; | [XI]US2011168644 (HARRIS JORDAN [US], et al) [X] 1-3,5,8,12-31,35-37,39-43 * paragraphs [0026] - [0046]; figures 1-11 * [I] 1-43; | [XI]US2014110356 (MCKAY WILLIAM F [US]) [X] 1-3,5,8,12-27,30,31,35,37,39-43 * paragraphs [0029] - [0047]; figures 1-5 * [I] 1-43 |