EP3353878 - ELECTRIC MACHINE WITH RADIAL COOLING SLITS AND WIND POWER PLANT [Right-click to bookmark this link] | |||
Former [2018/31] | ELECTRICAL MACHINE COMPRISING RADIAL COOLING SLOTS, AND WIND TURBINE | ||
[2019/04] | Status | No opposition filed within time limit Status updated on 20.03.2020 Database last updated on 20.07.2024 | |
Former | The patent has been granted Status updated on 12.04.2019 | ||
Former | Grant of patent is intended Status updated on 22.01.2019 | ||
Former | Request for examination was made Status updated on 29.06.2018 | ||
Former | The international publication has been made Status updated on 01.04.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Siemens Aktiengesellschaft Werner-von-Siemens-Straße 1 80333 München / DE | [2018/31] | Inventor(s) | 01 /
BRASAS, Frank Jägerberg 4 84103 Postau / DE | 02 /
GRUBER, Robert Schützenweg 15 94099 Ruhstorf / DE | 03 /
KROMPASS, Martin Richterstraße 4a 94036 Passau / DE | 04 /
MEMMINGER, Oliver Passauer Str. 45a 94127 Neuburg a. Inn / DE | 05 /
SCHIFFERER, Klaus Am Tiergarten 15 94127 Neuburg am Inn / DE | 06 /
SPERL, Tobias Schlossstrasse 5 84337 Pfarrkirchen / DE | 07 /
ZEICHFÜSSL, Roland Hochlohe 23 94099 Ruhstorf a. d. Rott / DE | [2018/31] | Application number, filing date | 16766264.2 | 07.09.2016 | [2018/31] | WO2016EP71066 | Priority number, date | EP20150185997 | 21.09.2015 Original published format: EP 15185997 | [2018/31] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2017050575 | Date: | 30.03.2017 | Language: | DE | [2017/13] | Type: | A1 Application with search report | No.: | EP3353878 | Date: | 01.08.2018 | Language: | DE | The application published by WIPO in one of the EPO official languages on 30.03.2017 takes the place of the publication of the European patent application. | [2018/31] | Type: | B1 Patent specification | No.: | EP3353878 | Date: | 15.05.2019 | Language: | DE | [2019/20] | Search report(s) | International search report - published on: | EP | 30.03.2017 | Classification | IPC: | H02K1/20, H02K1/32 | [2018/31] | CPC: |
H02K1/32 (EP,US);
F03D80/60 (US);
F03D9/25 (US);
H02K1/20 (EP,US);
H02K9/02 (US);
H02K2201/03 (US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/31] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | ELEKTRISCHE MASCHINE MIT RADIALEN KÜHLSCHLITZEN SOWIE WINDKRAFTANLAGE | [2018/31] | English: | ELECTRIC MACHINE WITH RADIAL COOLING SLITS AND WIND POWER PLANT | [2019/04] | French: | MACHINE ELECTRIQUE DOTEE DE FENTES D'AERATION RADIALES ET EOLIENNE | [2019/04] |
Former [2018/31] | ELECTRICAL MACHINE COMPRISING RADIAL COOLING SLOTS, AND WIND TURBINE | ||
Former [2018/31] | MACHINE ÉLECTRIQUE POURVUE DE FENTES DE REFROIDISSEMENT RADIALES ET ÉOLIENNE | Entry into regional phase | 27.02.2018 | National basic fee paid | 27.02.2018 | Designation fee(s) paid | 27.02.2018 | Examination fee paid | Examination procedure | 22.06.2017 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 26.02.2018 | Date on which the examining division has become responsible | 27.02.2018 | Examination requested [2018/31] | 23.01.2019 | Communication of intention to grant the patent | 04.04.2019 | Receipt of the translation of the claim(s) | 05.04.2019 | Fee for grant paid | 05.04.2019 | Fee for publishing/printing paid | Opposition(s) | 18.02.2020 | No opposition filed within time limit [2020/17] | Fees paid | Renewal fee | 20.09.2018 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 07.09.2016 | AL | 15.05.2019 | CY | 15.05.2019 | CZ | 15.05.2019 | DK | 15.05.2019 | EE | 15.05.2019 | FI | 15.05.2019 | HR | 15.05.2019 | IT | 15.05.2019 | LT | 15.05.2019 | LV | 15.05.2019 | MC | 15.05.2019 | MK | 15.05.2019 | MT | 15.05.2019 | NL | 15.05.2019 | PL | 15.05.2019 | RO | 15.05.2019 | RS | 15.05.2019 | SE | 15.05.2019 | SI | 15.05.2019 | SK | 15.05.2019 | SM | 15.05.2019 | TR | 15.05.2019 | BG | 15.08.2019 | NO | 15.08.2019 | GR | 16.08.2019 | IE | 07.09.2019 | LU | 07.09.2019 | IS | 15.09.2019 | PT | 15.09.2019 | BE | 30.09.2019 | CH | 30.09.2019 | LI | 30.09.2019 | [2022/32] |
Former [2021/48] | HU | 07.09.2016 | |
AL | 15.05.2019 | ||
CY | 15.05.2019 | ||
CZ | 15.05.2019 | ||
DK | 15.05.2019 | ||
EE | 15.05.2019 | ||
FI | 15.05.2019 | ||
HR | 15.05.2019 | ||
IT | 15.05.2019 | ||
LT | 15.05.2019 | ||
LV | 15.05.2019 | ||
MC | 15.05.2019 | ||
MT | 15.05.2019 | ||
NL | 15.05.2019 | ||
PL | 15.05.2019 | ||
RO | 15.05.2019 | ||
RS | 15.05.2019 | ||
SE | 15.05.2019 | ||
SI | 15.05.2019 | ||
SK | 15.05.2019 | ||
SM | 15.05.2019 | ||
TR | 15.05.2019 | ||
BG | 15.08.2019 | ||
NO | 15.08.2019 | ||
GR | 16.08.2019 | ||
IE | 07.09.2019 | ||
LU | 07.09.2019 | ||
IS | 15.09.2019 | ||
PT | 15.09.2019 | ||
BE | 30.09.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
Former [2021/34] | HU | 07.09.2016 | |
AL | 15.05.2019 | ||
CY | 15.05.2019 | ||
CZ | 15.05.2019 | ||
DK | 15.05.2019 | ||
EE | 15.05.2019 | ||
FI | 15.05.2019 | ||
HR | 15.05.2019 | ||
IT | 15.05.2019 | ||
LT | 15.05.2019 | ||
LV | 15.05.2019 | ||
MC | 15.05.2019 | ||
MT | 15.05.2019 | ||
NL | 15.05.2019 | ||
PL | 15.05.2019 | ||
RO | 15.05.2019 | ||
RS | 15.05.2019 | ||
SE | 15.05.2019 | ||
SK | 15.05.2019 | ||
SM | 15.05.2019 | ||
TR | 15.05.2019 | ||
BG | 15.08.2019 | ||
NO | 15.08.2019 | ||
GR | 16.08.2019 | ||
IE | 07.09.2019 | ||
LU | 07.09.2019 | ||
IS | 15.09.2019 | ||
PT | 15.09.2019 | ||
BE | 30.09.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
Former [2021/32] | HU | 07.09.2016 | |
AL | 15.05.2019 | ||
CY | 15.05.2019 | ||
CZ | 15.05.2019 | ||
DK | 15.05.2019 | ||
EE | 15.05.2019 | ||
FI | 15.05.2019 | ||
HR | 15.05.2019 | ||
IT | 15.05.2019 | ||
LT | 15.05.2019 | ||
LV | 15.05.2019 | ||
MC | 15.05.2019 | ||
NL | 15.05.2019 | ||
PL | 15.05.2019 | ||
RO | 15.05.2019 | ||
RS | 15.05.2019 | ||
SE | 15.05.2019 | ||
SK | 15.05.2019 | ||
SM | 15.05.2019 | ||
TR | 15.05.2019 | ||
BG | 15.08.2019 | ||
NO | 15.08.2019 | ||
GR | 16.08.2019 | ||
IE | 07.09.2019 | ||
LU | 07.09.2019 | ||
IS | 15.09.2019 | ||
PT | 15.09.2019 | ||
BE | 30.09.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
Former [2021/31] | AL | 15.05.2019 | |
CY | 15.05.2019 | ||
CZ | 15.05.2019 | ||
DK | 15.05.2019 | ||
EE | 15.05.2019 | ||
FI | 15.05.2019 | ||
HR | 15.05.2019 | ||
IT | 15.05.2019 | ||
LT | 15.05.2019 | ||
LV | 15.05.2019 | ||
MC | 15.05.2019 | ||
NL | 15.05.2019 | ||
PL | 15.05.2019 | ||
RO | 15.05.2019 | ||
RS | 15.05.2019 | ||
SE | 15.05.2019 | ||
SK | 15.05.2019 | ||
SM | 15.05.2019 | ||
TR | 15.05.2019 | ||
BG | 15.08.2019 | ||
NO | 15.08.2019 | ||
GR | 16.08.2019 | ||
IE | 07.09.2019 | ||
LU | 07.09.2019 | ||
IS | 15.09.2019 | ||
PT | 15.09.2019 | ||
BE | 30.09.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
Former [2021/26] | AL | 15.05.2019 | |
CY | 15.05.2019 | ||
CZ | 15.05.2019 | ||
DK | 15.05.2019 | ||
EE | 15.05.2019 | ||
FI | 15.05.2019 | ||
HR | 15.05.2019 | ||
IT | 15.05.2019 | ||
LT | 15.05.2019 | ||
LV | 15.05.2019 | ||
MC | 15.05.2019 | ||
NL | 15.05.2019 | ||
PL | 15.05.2019 | ||
RO | 15.05.2019 | ||
RS | 15.05.2019 | ||
SE | 15.05.2019 | ||
SK | 15.05.2019 | ||
SM | 15.05.2019 | ||
TR | 15.05.2019 | ||
BG | 15.08.2019 | ||
NO | 15.08.2019 | ||
GR | 16.08.2019 | ||
IE | 07.09.2019 | ||
LU | 07.09.2019 | ||
PT | 15.09.2019 | ||
BE | 30.09.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
Former [2021/20] | AL | 15.05.2019 | |
CZ | 15.05.2019 | ||
DK | 15.05.2019 | ||
EE | 15.05.2019 | ||
FI | 15.05.2019 | ||
HR | 15.05.2019 | ||
IT | 15.05.2019 | ||
LT | 15.05.2019 | ||
LV | 15.05.2019 | ||
MC | 15.05.2019 | ||
NL | 15.05.2019 | ||
PL | 15.05.2019 | ||
RO | 15.05.2019 | ||
RS | 15.05.2019 | ||
SE | 15.05.2019 | ||
SK | 15.05.2019 | ||
SM | 15.05.2019 | ||
TR | 15.05.2019 | ||
BG | 15.08.2019 | ||
NO | 15.08.2019 | ||
GR | 16.08.2019 | ||
IE | 07.09.2019 | ||
LU | 07.09.2019 | ||
PT | 15.09.2019 | ||
BE | 30.09.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
Former [2020/38] | AL | 15.05.2019 | |
CZ | 15.05.2019 | ||
DK | 15.05.2019 | ||
EE | 15.05.2019 | ||
FI | 15.05.2019 | ||
HR | 15.05.2019 | ||
IT | 15.05.2019 | ||
LT | 15.05.2019 | ||
LV | 15.05.2019 | ||
MC | 15.05.2019 | ||
NL | 15.05.2019 | ||
PL | 15.05.2019 | ||
RS | 15.05.2019 | ||
SE | 15.05.2019 | ||
SK | 15.05.2019 | ||
SM | 15.05.2019 | ||
TR | 15.05.2019 | ||
BG | 15.08.2019 | ||
NO | 15.08.2019 | ||
GR | 16.08.2019 | ||
IE | 07.09.2019 | ||
LU | 07.09.2019 | ||
PT | 15.09.2019 | ||
BE | 30.09.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
Former [2020/36] | AL | 15.05.2019 | |
CZ | 15.05.2019 | ||
DK | 15.05.2019 | ||
EE | 15.05.2019 | ||
FI | 15.05.2019 | ||
HR | 15.05.2019 | ||
IT | 15.05.2019 | ||
LT | 15.05.2019 | ||
LV | 15.05.2019 | ||
MC | 15.05.2019 | ||
NL | 15.05.2019 | ||
PL | 15.05.2019 | ||
RS | 15.05.2019 | ||
SE | 15.05.2019 | ||
SK | 15.05.2019 | ||
SM | 15.05.2019 | ||
TR | 15.05.2019 | ||
BG | 15.08.2019 | ||
NO | 15.08.2019 | ||
GR | 16.08.2019 | ||
IE | 07.09.2019 | ||
LU | 07.09.2019 | ||
PT | 15.09.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
Former [2020/35] | AL | 15.05.2019 | |
CZ | 15.05.2019 | ||
DK | 15.05.2019 | ||
EE | 15.05.2019 | ||
FI | 15.05.2019 | ||
HR | 15.05.2019 | ||
IT | 15.05.2019 | ||
LT | 15.05.2019 | ||
LV | 15.05.2019 | ||
MC | 15.05.2019 | ||
NL | 15.05.2019 | ||
PL | 15.05.2019 | ||
RS | 15.05.2019 | ||
SE | 15.05.2019 | ||
SK | 15.05.2019 | ||
SM | 15.05.2019 | ||
TR | 15.05.2019 | ||
BG | 15.08.2019 | ||
NO | 15.08.2019 | ||
GR | 16.08.2019 | ||
LU | 07.09.2019 | ||
PT | 15.09.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
Former [2020/34] | AL | 15.05.2019 | |
CZ | 15.05.2019 | ||
DK | 15.05.2019 | ||
EE | 15.05.2019 | ||
FI | 15.05.2019 | ||
HR | 15.05.2019 | ||
IT | 15.05.2019 | ||
LT | 15.05.2019 | ||
LV | 15.05.2019 | ||
MC | 15.05.2019 | ||
NL | 15.05.2019 | ||
PL | 15.05.2019 | ||
RS | 15.05.2019 | ||
SE | 15.05.2019 | ||
SK | 15.05.2019 | ||
SM | 15.05.2019 | ||
TR | 15.05.2019 | ||
BG | 15.08.2019 | ||
NO | 15.08.2019 | ||
GR | 16.08.2019 | ||
PT | 15.09.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
Former [2020/25] | AL | 15.05.2019 | |
CZ | 15.05.2019 | ||
DK | 15.05.2019 | ||
EE | 15.05.2019 | ||
FI | 15.05.2019 | ||
HR | 15.05.2019 | ||
IT | 15.05.2019 | ||
LT | 15.05.2019 | ||
LV | 15.05.2019 | ||
MC | 15.05.2019 | ||
NL | 15.05.2019 | ||
PL | 15.05.2019 | ||
RS | 15.05.2019 | ||
SE | 15.05.2019 | ||
SK | 15.05.2019 | ||
SM | 15.05.2019 | ||
TR | 15.05.2019 | ||
BG | 15.08.2019 | ||
NO | 15.08.2019 | ||
GR | 16.08.2019 | ||
PT | 15.09.2019 | ||
Former [2020/17] | AL | 15.05.2019 | |
CZ | 15.05.2019 | ||
DK | 15.05.2019 | ||
EE | 15.05.2019 | ||
FI | 15.05.2019 | ||
HR | 15.05.2019 | ||
IT | 15.05.2019 | ||
LT | 15.05.2019 | ||
LV | 15.05.2019 | ||
NL | 15.05.2019 | ||
RS | 15.05.2019 | ||
SE | 15.05.2019 | ||
SK | 15.05.2019 | ||
SM | 15.05.2019 | ||
TR | 15.05.2019 | ||
BG | 15.08.2019 | ||
NO | 15.08.2019 | ||
GR | 16.08.2019 | ||
PT | 15.09.2019 | ||
Former [2020/14] | AL | 15.05.2019 | |
CZ | 15.05.2019 | ||
DK | 15.05.2019 | ||
EE | 15.05.2019 | ||
FI | 15.05.2019 | ||
HR | 15.05.2019 | ||
IT | 15.05.2019 | ||
LT | 15.05.2019 | ||
LV | 15.05.2019 | ||
NL | 15.05.2019 | ||
RS | 15.05.2019 | ||
SE | 15.05.2019 | ||
SK | 15.05.2019 | ||
SM | 15.05.2019 | ||
BG | 15.08.2019 | ||
NO | 15.08.2019 | ||
GR | 16.08.2019 | ||
PT | 15.09.2019 | ||
Former [2020/12] | AL | 15.05.2019 | |
CZ | 15.05.2019 | ||
DK | 15.05.2019 | ||
EE | 15.05.2019 | ||
FI | 15.05.2019 | ||
HR | 15.05.2019 | ||
IT | 15.05.2019 | ||
LT | 15.05.2019 | ||
LV | 15.05.2019 | ||
NL | 15.05.2019 | ||
RS | 15.05.2019 | ||
SE | 15.05.2019 | ||
SK | 15.05.2019 | ||
BG | 15.08.2019 | ||
NO | 15.08.2019 | ||
GR | 16.08.2019 | ||
PT | 15.09.2019 | ||
Former [2020/11] | AL | 15.05.2019 | |
CZ | 15.05.2019 | ||
DK | 15.05.2019 | ||
EE | 15.05.2019 | ||
FI | 15.05.2019 | ||
HR | 15.05.2019 | ||
LT | 15.05.2019 | ||
LV | 15.05.2019 | ||
NL | 15.05.2019 | ||
RS | 15.05.2019 | ||
SE | 15.05.2019 | ||
SK | 15.05.2019 | ||
BG | 15.08.2019 | ||
NO | 15.08.2019 | ||
GR | 16.08.2019 | ||
PT | 15.09.2019 | ||
Former [2020/09] | AL | 15.05.2019 | |
CZ | 15.05.2019 | ||
DK | 15.05.2019 | ||
FI | 15.05.2019 | ||
HR | 15.05.2019 | ||
LT | 15.05.2019 | ||
LV | 15.05.2019 | ||
NL | 15.05.2019 | ||
RS | 15.05.2019 | ||
SE | 15.05.2019 | ||
BG | 15.08.2019 | ||
NO | 15.08.2019 | ||
GR | 16.08.2019 | ||
PT | 15.09.2019 | ||
Former [2019/51] | AL | 15.05.2019 | |
FI | 15.05.2019 | ||
HR | 15.05.2019 | ||
LT | 15.05.2019 | ||
LV | 15.05.2019 | ||
NL | 15.05.2019 | ||
RS | 15.05.2019 | ||
SE | 15.05.2019 | ||
BG | 15.08.2019 | ||
NO | 15.08.2019 | ||
GR | 16.08.2019 | ||
PT | 15.09.2019 | ||
Former [2019/50] | AL | 15.05.2019 | |
FI | 15.05.2019 | ||
HR | 15.05.2019 | ||
LT | 15.05.2019 | ||
LV | 15.05.2019 | ||
NL | 15.05.2019 | ||
RS | 15.05.2019 | ||
SE | 15.05.2019 | ||
NO | 15.08.2019 | ||
GR | 16.08.2019 | ||
PT | 15.09.2019 | ||
Former [2019/49] | AL | 15.05.2019 | |
FI | 15.05.2019 | ||
HR | 15.05.2019 | ||
LT | 15.05.2019 | ||
NL | 15.05.2019 | ||
SE | 15.05.2019 | ||
NO | 15.08.2019 | ||
PT | 15.09.2019 | ||
Former [2019/48] | FI | 15.05.2019 | |
LT | 15.05.2019 | ||
SE | 15.05.2019 | ||
NO | 15.08.2019 | ||
PT | 15.09.2019 | ||
Former [2019/47] | FI | 15.05.2019 | |
LT | 15.05.2019 | ||
NO | 15.08.2019 | Cited in | International search | [Y]EP1050949 (HITACHI LTD [JP]) [Y] 6,7 * paragraph [0043] - paragraph [0044]; figure 3 *; | [Y]CN203278421U (SHANGHAI ELECTRICAL APPARATUS RES INST GROUP CO LTD, et al) [Y] 1-9 * abstract *; | [A]EP2744075 (SIEMENS AG [DE]) [A] 2* figure 1 *; | [Y]DE102014115666 (HYUN DAI HEAVY IND CO LTD [KR]) [Y] 1-9 * paragraph [0030] - paragraph [0079]; figures 1-5 * | by applicant | CN203278421U | DE102014115666 |