blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3350111

EP3350111 - ELECTRICALLY DRIVEN WORKING MACHINE COMPRISING REVERSE POWER STORAGE AND METHOD [Right-click to bookmark this link]
Former [2018/30]ELECTRICALLY DRIVEN WORKING MACHINE COMPRISING REVERSE POWER STORAGE
[2020/47]
StatusNo opposition filed within time limit
Status updated on  04.03.2022
Database last updated on 30.07.2024
FormerThe patent has been granted
Status updated on  26.03.2021
FormerGrant of patent is intended
Status updated on  23.11.2020
FormerRequest for examination was made
Status updated on  22.06.2018
FormerThe international publication has been made
Status updated on  25.03.2017
Most recent event   Tooltip27.04.2024Lapse of the patent in a contracting state
New state(s): MK
published on 29.05.2024  [2024/22]
Applicant(s)For all designated states
Liebherr-Components Biberach GmbH
Hans-Liebherr-Strasse 45
88400 Biberach an der Riß / DE
[2018/30]
Inventor(s)01 / MÜNST, Thomas
Waldseerstrasse 33
88444 Ummendorf / DE
02 / BAYER, Daniel
Eulenweg 4
89537 Giengen / DE
 [2018/30]
Representative(s)Thoma, Michael
Lorenz Seidler Gossel
Rechtsanwälte Patentanwälte
Partnerschaft mbB
Widenmayerstraße 23
80538 München / DE
[2018/30]
Application number, filing date16766486.116.09.2016
[2018/30]
WO2016EP01556
Priority number, dateDE20152006587U18.09.2015         Original published format: DE 202015006587 U
DE20152008403U07.12.2015         Original published format: DE 202015008403 U
[2018/30]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2017045760
Date:23.03.2017
Language:DE
[2017/12]
Type: A1 Application with search report 
No.:EP3350111
Date:25.07.2018
Language:DE
The application published by WIPO in one of the EPO official languages on 23.03.2017 takes the place of the publication of the European patent application.
[2018/30]
Type: B1 Patent specification 
No.:EP3350111
Date:28.04.2021
Language:DE
[2021/17]
Search report(s)International search report - published on:EP23.03.2017
ClassificationIPC:B66C13/28, E02F9/22, B60L1/00, B60L7/22, B60L50/30
[2020/47]
CPC:
B60L1/003 (EP,US); B60L50/30 (EP,US); B60L7/10 (US);
B60L7/22 (EP,US); B66C13/22 (US); B66C13/28 (EP,US);
E02F9/207 (US); E02F9/2217 (EP,US); H02K7/025 (US);
H02P3/14 (US); B60L2200/40 (EP,US); B60L2240/421 (EP,US);
B60L2240/423 (EP,US); B66C23/40 (US); Y02T10/64 (EP);
Y02T10/70 (EP) (-)
Former IPC [2018/30]B66C13/28, E02F9/22
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/30]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:ELEKTRISCH ANGETRIEBENE ARBEITSMASCHINE MIT RÜCKLEISTUNGSSPEICHERUNG SOWIE VERFAHREN[2020/47]
English:ELECTRICALLY DRIVEN WORKING MACHINE COMPRISING REVERSE POWER STORAGE AND METHOD[2020/47]
French:MACHINE DE TRAVAIL ÉLECTRIQUE À STOCKAGE DU RETOUR DE PUISSANCE ET PROCÉDÉ[2020/47]
Former [2018/30]ELEKTRISCH ANGETRIEBENE ARBEITSMASCHINE MIT RÜCKLEISTUNGSSPEICHERUNG
Former [2018/30]ELECTRICALLY DRIVEN WORKING MACHINE COMPRISING REVERSE POWER STORAGE
Former [2018/30]MACHINE DE TRAVAIL ÉLECTRIQUE À STOCKAGE DU RETOUR DE PUISSANCE
Entry into regional phase15.03.2018National basic fee paid 
15.03.2018Designation fee(s) paid 
15.03.2018Examination fee paid 
Examination procedure15.03.2018Examination requested  [2018/30]
15.03.2018Date on which the examining division has become responsible
25.10.2018Amendment by applicant (claims and/or description)
24.11.2020Communication of intention to grant the patent
23.03.2021Fee for grant paid
23.03.2021Fee for publishing/printing paid
23.03.2021Receipt of the translation of the claim(s)
Opposition(s)31.01.2022No opposition filed within time limit [2022/14]
Fees paidRenewal fee
24.09.2018Renewal fee patent year 03
25.09.2019Renewal fee patent year 04
22.09.2020Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU16.09.2016
AL28.04.2021
CY28.04.2021
CZ28.04.2021
DK28.04.2021
EE28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
MC28.04.2021
MK28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SI28.04.2021
SK28.04.2021
SM28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
AT16.09.2021
IE16.09.2021
LU16.09.2021
BE30.09.2021
CH30.09.2021
LI30.09.2021
[2024/22]
Former [2023/30]HU16.09.2016
AL28.04.2021
CY28.04.2021
CZ28.04.2021
DK28.04.2021
EE28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
MC28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SI28.04.2021
SK28.04.2021
SM28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
AT16.09.2021
IE16.09.2021
LU16.09.2021
BE30.09.2021
CH30.09.2021
LI30.09.2021
Former [2023/28]HU16.09.2016
AL28.04.2021
CZ28.04.2021
DK28.04.2021
EE28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
MC28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SI28.04.2021
SK28.04.2021
SM28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
AT16.09.2021
IE16.09.2021
LU16.09.2021
BE30.09.2021
CH30.09.2021
LI30.09.2021
Former [2023/07]AL28.04.2021
CZ28.04.2021
DK28.04.2021
EE28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
MC28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SI28.04.2021
SK28.04.2021
SM28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
AT16.09.2021
IE16.09.2021
LU16.09.2021
BE30.09.2021
CH30.09.2021
LI30.09.2021
Former [2022/37]AL28.04.2021
CZ28.04.2021
DK28.04.2021
EE28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
MC28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SI28.04.2021
SK28.04.2021
SM28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
IE16.09.2021
LU16.09.2021
BE30.09.2021
CH30.09.2021
LI30.09.2021
Former [2022/35]AL28.04.2021
CZ28.04.2021
DK28.04.2021
EE28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
MC28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SI28.04.2021
SK28.04.2021
SM28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
IE16.09.2021
LU16.09.2021
BE30.09.2021
Former [2022/34]AL28.04.2021
CZ28.04.2021
DK28.04.2021
EE28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
MC28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SI28.04.2021
SK28.04.2021
SM28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
LU16.09.2021
BE30.09.2021
Former [2022/29]AL28.04.2021
CZ28.04.2021
DK28.04.2021
EE28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
MC28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SI28.04.2021
SK28.04.2021
SM28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
Former [2022/25]AL28.04.2021
CZ28.04.2021
DK28.04.2021
EE28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
MC28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SK28.04.2021
SM28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
Former [2022/23]CZ28.04.2021
DK28.04.2021
EE28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SK28.04.2021
SM28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
Former [2022/10]CZ28.04.2021
DK28.04.2021
EE28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SK28.04.2021
SM28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
PT30.08.2021
IS22.12.2021
Former [2022/09]CZ28.04.2021
DK28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SK28.04.2021
SM28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
Former [2022/08]CZ28.04.2021
DK28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
NL28.04.2021
PL28.04.2021
RS28.04.2021
SE28.04.2021
SM28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
Former [2022/07]FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
NL28.04.2021
PL28.04.2021
RS28.04.2021
SE28.04.2021
SM28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
Former [2021/52]FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
NL28.04.2021
PL28.04.2021
RS28.04.2021
SE28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
Former [2021/51]FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
NL28.04.2021
RS28.04.2021
SE28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
Former [2021/50]FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
NL28.04.2021
SE28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
PT30.08.2021
Former [2021/49]FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
NL28.04.2021
SE28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
Former [2021/47]FI28.04.2021
LT28.04.2021
NL28.04.2021
BG28.07.2021
Former [2021/46]FI28.04.2021
LT28.04.2021
Cited inInternational search[XI]WO2008042319  (CATERPILLAR INC [US], et al) [X] 3,6,7,9,11,12 * paragraphs [0017] , [0023]; figure 1 * [I] 1,2,4,5,8,10;
 [XI]DE102008050553  (WACKER NEUSON SE [DE]) [X] 3 * figure 1; claim 1 * [I] 1,2,4-12;
 [A]US2015063968  (JACOBSON EVAN EARL [US]) [A] 1,3* abstract *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.