EP3328745 - RIGID PACKAGE WITH A HINGED LID [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.04.2020 Database last updated on 14.06.2024 | |
Former | The patent has been granted Status updated on 26.04.2019 | ||
Former | Grant of patent is intended Status updated on 19.12.2018 | ||
Former | Request for examination was made Status updated on 04.05.2018 | ||
Former | The international publication has been made Status updated on 03.02.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states G.D Societa' per Azioni Via Battindarno 91 40133 Bologna / IT | [2018/23] | Inventor(s) | 01 /
PARADISO, Luca c/o G.D SOCIETA' PER AZIONI Via Battindarno 91 40133 Bologna / IT | 02 /
FEDERICI, Luca Via Lippo di Dalmasio 13 40135 Bologna / IT | [2018/23] | Representative(s) | Maccagnan, Matteo, et al Studio Torta S.p.A. Via Viotti, 9 10121 Torino / IT | [2018/23] | Application number, filing date | 16766608.0 | 28.07.2016 | [2018/23] | WO2016IB54532 | Priority number, date | IT2015UB02536 | 29.07.2015 Original published format: IT UB20152536 | [2018/23] | Filing language | IT | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017017643 | Date: | 02.02.2017 | Language: | EN | [2017/05] | Type: | A1 Application with search report | No.: | EP3328745 | Date: | 06.06.2018 | Language: | EN | The application published by WIPO in one of the EPO official languages on 02.02.2017 takes the place of the publication of the European patent application. | [2018/23] | Type: | B1 Patent specification | No.: | EP3328745 | Date: | 29.05.2019 | Language: | EN | [2019/22] | Search report(s) | International search report - published on: | EP | 02.02.2017 | Classification | IPC: | B65D5/66, B65D85/10 | [2018/51] | CPC: |
B65D5/6691 (EP,US);
B65D85/1009 (EP);
B65D85/1045 (EP,US);
B65D85/10564 (EP,US);
B65D2203/12 (EP)
|
Former IPC [2018/23] | B65D5/38, B65D85/10 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/23] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | STARRE VERPACKUNG MIT EINEM SCHARNIERDECKEL | [2018/23] | English: | RIGID PACKAGE WITH A HINGED LID | [2018/23] | French: | EMBALLAGE RIGIDE À COUVERCLE ARTICULÉ | [2018/23] | Entry into regional phase | 09.01.2018 | National basic fee paid | 09.01.2018 | Designation fee(s) paid | 09.01.2018 | Examination fee paid | Examination procedure | 09.01.2018 | Examination requested [2018/23] | 09.01.2018 | Date on which the examining division has become responsible | 06.08.2018 | Amendment by applicant (claims and/or description) | 20.12.2018 | Communication of intention to grant the patent | 17.04.2019 | Fee for grant paid | 17.04.2019 | Fee for publishing/printing paid | 17.04.2019 | Receipt of the translation of the claim(s) | Opposition(s) | 03.03.2020 | No opposition filed within time limit [2020/19] | Fees paid | Renewal fee | 27.07.2018 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 28.07.2016 | AL | 29.05.2019 | AT | 29.05.2019 | CY | 29.05.2019 | CZ | 29.05.2019 | DK | 29.05.2019 | EE | 29.05.2019 | ES | 29.05.2019 | FI | 29.05.2019 | HR | 29.05.2019 | IT | 29.05.2019 | LT | 29.05.2019 | LV | 29.05.2019 | MC | 29.05.2019 | MK | 29.05.2019 | MT | 29.05.2019 | NL | 29.05.2019 | RS | 29.05.2019 | SE | 29.05.2019 | SI | 29.05.2019 | SK | 29.05.2019 | SM | 29.05.2019 | IE | 28.07.2019 | LU | 28.07.2019 | FR | 29.07.2019 | BE | 31.07.2019 | CH | 31.07.2019 | LI | 31.07.2019 | NO | 29.08.2019 | IS | 29.09.2019 | PT | 30.09.2019 | GR | 06.02.2020 | [2022/32] |
Former [2021/34] | HU | 28.07.2016 | |
AL | 29.05.2019 | ||
AT | 29.05.2019 | ||
CY | 29.05.2019 | ||
CZ | 29.05.2019 | ||
DK | 29.05.2019 | ||
EE | 29.05.2019 | ||
ES | 29.05.2019 | ||
FI | 29.05.2019 | ||
HR | 29.05.2019 | ||
IT | 29.05.2019 | ||
LT | 29.05.2019 | ||
LV | 29.05.2019 | ||
MC | 29.05.2019 | ||
MT | 29.05.2019 | ||
NL | 29.05.2019 | ||
RS | 29.05.2019 | ||
SE | 29.05.2019 | ||
SI | 29.05.2019 | ||
SK | 29.05.2019 | ||
SM | 29.05.2019 | ||
IE | 28.07.2019 | ||
LU | 28.07.2019 | ||
FR | 29.07.2019 | ||
BE | 31.07.2019 | ||
CH | 31.07.2019 | ||
LI | 31.07.2019 | ||
NO | 29.08.2019 | ||
IS | 29.09.2019 | ||
PT | 30.09.2019 | ||
GR | 06.02.2020 | ||
Former [2021/33] | HU | 28.07.2016 | |
AL | 29.05.2019 | ||
AT | 29.05.2019 | ||
CY | 29.05.2019 | ||
CZ | 29.05.2019 | ||
DK | 29.05.2019 | ||
EE | 29.05.2019 | ||
ES | 29.05.2019 | ||
FI | 29.05.2019 | ||
HR | 29.05.2019 | ||
IT | 29.05.2019 | ||
LT | 29.05.2019 | ||
LV | 29.05.2019 | ||
MC | 29.05.2019 | ||
NL | 29.05.2019 | ||
RS | 29.05.2019 | ||
SE | 29.05.2019 | ||
SI | 29.05.2019 | ||
SK | 29.05.2019 | ||
SM | 29.05.2019 | ||
IE | 28.07.2019 | ||
LU | 28.07.2019 | ||
FR | 29.07.2019 | ||
BE | 31.07.2019 | ||
CH | 31.07.2019 | ||
LI | 31.07.2019 | ||
NO | 29.08.2019 | ||
IS | 29.09.2019 | ||
PT | 30.09.2019 | ||
GR | 06.02.2020 | ||
Former [2021/31] | AL | 29.05.2019 | |
AT | 29.05.2019 | ||
CY | 29.05.2019 | ||
CZ | 29.05.2019 | ||
DK | 29.05.2019 | ||
EE | 29.05.2019 | ||
ES | 29.05.2019 | ||
FI | 29.05.2019 | ||
HR | 29.05.2019 | ||
IT | 29.05.2019 | ||
LT | 29.05.2019 | ||
LV | 29.05.2019 | ||
MC | 29.05.2019 | ||
NL | 29.05.2019 | ||
RS | 29.05.2019 | ||
SE | 29.05.2019 | ||
SI | 29.05.2019 | ||
SK | 29.05.2019 | ||
SM | 29.05.2019 | ||
IE | 28.07.2019 | ||
LU | 28.07.2019 | ||
FR | 29.07.2019 | ||
BE | 31.07.2019 | ||
CH | 31.07.2019 | ||
LI | 31.07.2019 | ||
NO | 29.08.2019 | ||
IS | 29.09.2019 | ||
PT | 30.09.2019 | ||
GR | 06.02.2020 | ||
Former [2021/26] | AL | 29.05.2019 | |
AT | 29.05.2019 | ||
CY | 29.05.2019 | ||
CZ | 29.05.2019 | ||
DK | 29.05.2019 | ||
EE | 29.05.2019 | ||
ES | 29.05.2019 | ||
FI | 29.05.2019 | ||
HR | 29.05.2019 | ||
IT | 29.05.2019 | ||
LT | 29.05.2019 | ||
LV | 29.05.2019 | ||
MC | 29.05.2019 | ||
NL | 29.05.2019 | ||
RS | 29.05.2019 | ||
SE | 29.05.2019 | ||
SI | 29.05.2019 | ||
SK | 29.05.2019 | ||
SM | 29.05.2019 | ||
IE | 28.07.2019 | ||
LU | 28.07.2019 | ||
FR | 29.07.2019 | ||
BE | 31.07.2019 | ||
CH | 31.07.2019 | ||
LI | 31.07.2019 | ||
NO | 29.08.2019 | ||
PT | 30.09.2019 | ||
GR | 06.02.2020 | ||
Former [2020/36] | AL | 29.05.2019 | |
AT | 29.05.2019 | ||
CZ | 29.05.2019 | ||
DK | 29.05.2019 | ||
EE | 29.05.2019 | ||
ES | 29.05.2019 | ||
FI | 29.05.2019 | ||
HR | 29.05.2019 | ||
IT | 29.05.2019 | ||
LT | 29.05.2019 | ||
LV | 29.05.2019 | ||
MC | 29.05.2019 | ||
NL | 29.05.2019 | ||
RS | 29.05.2019 | ||
SE | 29.05.2019 | ||
SI | 29.05.2019 | ||
SK | 29.05.2019 | ||
SM | 29.05.2019 | ||
IE | 28.07.2019 | ||
LU | 28.07.2019 | ||
FR | 29.07.2019 | ||
BE | 31.07.2019 | ||
CH | 31.07.2019 | ||
LI | 31.07.2019 | ||
NO | 29.08.2019 | ||
PT | 30.09.2019 | ||
GR | 06.02.2020 | ||
Former [2020/29] | AL | 29.05.2019 | |
AT | 29.05.2019 | ||
CZ | 29.05.2019 | ||
DK | 29.05.2019 | ||
EE | 29.05.2019 | ||
ES | 29.05.2019 | ||
FI | 29.05.2019 | ||
HR | 29.05.2019 | ||
IT | 29.05.2019 | ||
LT | 29.05.2019 | ||
LV | 29.05.2019 | ||
MC | 29.05.2019 | ||
NL | 29.05.2019 | ||
RS | 29.05.2019 | ||
SE | 29.05.2019 | ||
SI | 29.05.2019 | ||
SK | 29.05.2019 | ||
SM | 29.05.2019 | ||
LU | 28.07.2019 | ||
FR | 29.07.2019 | ||
BE | 31.07.2019 | ||
CH | 31.07.2019 | ||
LI | 31.07.2019 | ||
NO | 29.08.2019 | ||
PT | 30.09.2019 | ||
GR | 06.02.2020 | ||
Former [2020/25] | AL | 29.05.2019 | |
AT | 29.05.2019 | ||
CZ | 29.05.2019 | ||
DK | 29.05.2019 | ||
EE | 29.05.2019 | ||
ES | 29.05.2019 | ||
FI | 29.05.2019 | ||
HR | 29.05.2019 | ||
IT | 29.05.2019 | ||
LT | 29.05.2019 | ||
LV | 29.05.2019 | ||
MC | 29.05.2019 | ||
NL | 29.05.2019 | ||
RS | 29.05.2019 | ||
SE | 29.05.2019 | ||
SI | 29.05.2019 | ||
SK | 29.05.2019 | ||
SM | 29.05.2019 | ||
LU | 28.07.2019 | ||
BE | 31.07.2019 | ||
CH | 31.07.2019 | ||
LI | 31.07.2019 | ||
NO | 29.08.2019 | ||
PT | 30.09.2019 | ||
GR | 06.02.2020 | ||
Former [2020/24] | AL | 29.05.2019 | |
AT | 29.05.2019 | ||
CZ | 29.05.2019 | ||
DK | 29.05.2019 | ||
EE | 29.05.2019 | ||
ES | 29.05.2019 | ||
FI | 29.05.2019 | ||
HR | 29.05.2019 | ||
IT | 29.05.2019 | ||
LT | 29.05.2019 | ||
LV | 29.05.2019 | ||
MC | 29.05.2019 | ||
NL | 29.05.2019 | ||
RS | 29.05.2019 | ||
SE | 29.05.2019 | ||
SI | 29.05.2019 | ||
SK | 29.05.2019 | ||
SM | 29.05.2019 | ||
BE | 31.07.2019 | ||
CH | 31.07.2019 | ||
LI | 31.07.2019 | ||
NO | 29.08.2019 | ||
PT | 30.09.2019 | ||
GR | 06.02.2020 | ||
Former [2020/14] | AL | 29.05.2019 | |
AT | 29.05.2019 | ||
CZ | 29.05.2019 | ||
DK | 29.05.2019 | ||
EE | 29.05.2019 | ||
ES | 29.05.2019 | ||
FI | 29.05.2019 | ||
HR | 29.05.2019 | ||
IT | 29.05.2019 | ||
LT | 29.05.2019 | ||
LV | 29.05.2019 | ||
MC | 29.05.2019 | ||
NL | 29.05.2019 | ||
RS | 29.05.2019 | ||
SE | 29.05.2019 | ||
SK | 29.05.2019 | ||
SM | 29.05.2019 | ||
NO | 29.08.2019 | ||
PT | 30.09.2019 | ||
Former [2020/12] | AL | 29.05.2019 | |
AT | 29.05.2019 | ||
CZ | 29.05.2019 | ||
DK | 29.05.2019 | ||
EE | 29.05.2019 | ||
ES | 29.05.2019 | ||
FI | 29.05.2019 | ||
HR | 29.05.2019 | ||
IT | 29.05.2019 | ||
LT | 29.05.2019 | ||
LV | 29.05.2019 | ||
NL | 29.05.2019 | ||
RS | 29.05.2019 | ||
SE | 29.05.2019 | ||
SK | 29.05.2019 | ||
NO | 29.08.2019 | ||
PT | 30.09.2019 | ||
Former [2020/11] | AL | 29.05.2019 | |
AT | 29.05.2019 | ||
CZ | 29.05.2019 | ||
DK | 29.05.2019 | ||
EE | 29.05.2019 | ||
ES | 29.05.2019 | ||
FI | 29.05.2019 | ||
HR | 29.05.2019 | ||
LT | 29.05.2019 | ||
LV | 29.05.2019 | ||
NL | 29.05.2019 | ||
RS | 29.05.2019 | ||
SE | 29.05.2019 | ||
SK | 29.05.2019 | ||
NO | 29.08.2019 | ||
PT | 30.09.2019 | ||
Former [2020/09] | AL | 29.05.2019 | |
CZ | 29.05.2019 | ||
DK | 29.05.2019 | ||
ES | 29.05.2019 | ||
FI | 29.05.2019 | ||
HR | 29.05.2019 | ||
LT | 29.05.2019 | ||
LV | 29.05.2019 | ||
NL | 29.05.2019 | ||
RS | 29.05.2019 | ||
SE | 29.05.2019 | ||
NO | 29.08.2019 | ||
PT | 30.09.2019 | ||
Former [2020/07] | AL | 29.05.2019 | |
ES | 29.05.2019 | ||
FI | 29.05.2019 | ||
HR | 29.05.2019 | ||
LT | 29.05.2019 | ||
LV | 29.05.2019 | ||
NL | 29.05.2019 | ||
RS | 29.05.2019 | ||
SE | 29.05.2019 | ||
NO | 29.08.2019 | ||
PT | 30.09.2019 | ||
Former [2019/50] | AL | 29.05.2019 | |
ES | 29.05.2019 | ||
FI | 29.05.2019 | ||
HR | 29.05.2019 | ||
LT | 29.05.2019 | ||
LV | 29.05.2019 | ||
RS | 29.05.2019 | ||
SE | 29.05.2019 | ||
NO | 29.08.2019 | ||
PT | 30.09.2019 | ||
Former [2019/49] | AL | 29.05.2019 | |
ES | 29.05.2019 | ||
FI | 29.05.2019 | ||
HR | 29.05.2019 | ||
LT | 29.05.2019 | ||
SE | 29.05.2019 | ||
NO | 29.08.2019 | ||
PT | 30.09.2019 | ||
Former [2019/48] | ES | 29.05.2019 | |
FI | 29.05.2019 | ||
LT | 29.05.2019 | ||
SE | 29.05.2019 | ||
NO | 29.08.2019 | ||
PT | 30.09.2019 | ||
Former [2019/47] | ES | 29.05.2019 | |
FI | 29.05.2019 | ||
LT | 29.05.2019 | ||
NO | 29.08.2019 | Cited in | International search | [A]WO0010892 (BRITISH AMERICAN TOBACCO CO [GB], et al) [A] 1-12 * page 8, line 26 - page 9, line 8; claims 9,10 *; | [A]WO0010879 (BRITISH AMERICAN TOBACCO CO [GB], et al) [A] 1-12* page 12, lines 21-31 - page 13, lines 1-8; figures 3,6 *; | [IA]WO2009125240 (VECCHI MARCO [IT]) [I] 1-4 * page 6, line 23 - page 9, line 12; figures 1-8 * [A] 5-12; | [IDA]WO2011051076 (SOUZA CRUZ SA [BR], et al) [ID] 1,2,8 * the whole document * [A] 3-7,9-12; | [A]WO2012080477 (PHILIP MORRIS PROD [CH], et al) [A] 1-12 * abstract * |